VLAB 1 Final presentation
2014/4/8@TaiwanTeam members: Maha Siva Reddy、Shyam Sankar、Shameeja Shafi(IIT)Alireza Borhani、Will Lippitt(UW)Yao-Yu, Benjamin, Yang、Hsiang-Wen, Ken, Yang(NTU)
![Page 2: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/2.jpg)
OUTLINE
• Teammate introduction
• Tasks
• Result analysis
• Conclusion
![Page 3: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/3.jpg)
TEAMMATE INTRODUCTION
![Page 4: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/4.jpg)
Teammate introduction
• IIT: mechanical background, pursuing MS in construction technology and management
• UW: architecture and civil engineering background, construction management
![Page 5: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/5.jpg)
Maha siva Reddy (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD
– Speak Telugu, hindhi and India English
– Playing guitar, volleyball, rubik’s cube
![Page 6: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/6.jpg)
Shyam Sankar (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD
– 2-year experience of pipline laying works, billing and procurement
– NBA and soccer follower, and playing basketball or football daily an hour
![Page 7: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/7.jpg)
Shameeja Shafi (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD, Revit and MSproject
– Speak English, Hindi, Malayalam
– Reading books, listening to the music, playing badminton
![Page 8: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/8.jpg)
Will Lippitt (UW)
• Brief Biography
– Architecture background and MS in construction management
– Sketchup, CAD
– One year experience as a general contractor project manager and 8 year in construction
– Speak Japanese, French and English
– Walk a dog
![Page 9: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/9.jpg)
Alireza Borhani (UW)
• Brief Biography
– Civil engineering background and MS construction management
– AutoCAD
– Speak Persian, German and English
– Traveling and going to the movies
![Page 10: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/10.jpg)
TASKS
![Page 11: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/11.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 12: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/12.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 13: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/13.jpg)
A CASE STUDY
![Page 14: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/14.jpg)
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
![Page 15: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/15.jpg)
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
![Page 16: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/16.jpg)
Location
Global team project location
Case studylocation
![Page 17: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/17.jpg)
Location
LinBian train station
![Page 18: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/18.jpg)
Situation
• The flood was caused by land subsidence
![Page 19: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/19.jpg)
Situation
• Sedimentation after the flood
http://blog.xuite.net/jin.ishin/train/26020943-%E5%85%AB%E5%85%AB%E6%B0%B4%E7%81%BD%E5%B1%8F%E6%9D%B1%E6%95%91%E7%81%BD%E7%B4%80%E5%AF%A6
![Page 20: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/20.jpg)
Hydrology Information about LinBian
• Max. flood elevation (100-years recurrence interval )=5.9 meters
• Avg. flood elevation (100-years recurrence interval )=0.89 meters
• 100-year rainfall intensity=1012 mm per day
![Page 21: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/21.jpg)
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
![Page 22: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/22.jpg)
Near future solution
Installing the flood gate
Elevating the base
(gmap)
![Page 23: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/23.jpg)
Near future solution
Elevating the baseBuilding the wall
(gmap)
![Page 24: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/24.jpg)
Far future solution
• Stilt house
(elevated house)
The house in England(inthralld.com )
Green elevated house https://news.housefun.com.tw/news/article/35546949922.html
The house in Cambodia(Flickr CC)
![Page 25: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/25.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 26: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/26.jpg)
DESIGN STRATEGY
![Page 27: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/27.jpg)
Design Strategy
• It should be economical
• It should be completed in minimum time
• Renovation of an existing building
• It should serve the functionality of a flood house and be aesthetically appealing
• The building should be environmental friendly
![Page 28: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/28.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 29: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/29.jpg)
3D MODEL
![Page 30: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/30.jpg)
3D Model
• The original
• Second version
• Final version
• The special parts
![Page 31: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/31.jpg)
The original
![Page 32: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/32.jpg)
Second version
![Page 33: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/33.jpg)
Final version
![Page 34: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/34.jpg)
The roof is further extended such that rain water flows out and falls outside
the buildings boundary.
![Page 35: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/35.jpg)
Glass curtains are provided to make the structure aesthetically pleasing
Floodgate provided
![Page 36: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/36.jpg)
The fence height was increased to 1m to prevent heavy water floods from
hitting the building.
Floodgate provided
![Page 37: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/37.jpg)
Greenery that surrounds the building adding to its aesthetic appeal also
absorb water during floods.
![Page 38: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/38.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 39: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/39.jpg)
4D MODEL
![Page 40: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/40.jpg)
Original building
![Page 41: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/41.jpg)
See pictures
![Page 42: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/42.jpg)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
![Page 43: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/43.jpg)
COST ESTIMATION
![Page 44: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/44.jpg)
Cost estimation
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
![Page 45: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/45.jpg)
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
![Page 46: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/46.jpg)
Cost information
• Cost Database
– Website
– Material Cost Sheet
– Assumption
– Calculation
![Page 47: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/47.jpg)
The website
US Material
US Labor
US Equipment
![Page 48: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/48.jpg)
Documents
US cement price
India price list
![Page 49: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/49.jpg)
Assumption
• Labor: $USD 5/DAY
• Choose middle level price material
![Page 50: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/50.jpg)
Calculation
1) Find the item cost on the website or the document
2) Choose the middle level quality material
3) Change the labor cost from US cost to India cost
4) Search and Change the material cost from US cost to India cost
5) Change the unit to calculate the item cost
![Page 51: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/51.jpg)
The tools
• Autodesk Quantity Takeoff– Material checking
• Autodesk Revit– Quantity summary– Member details– Material filtering
• Microsoft Office Excel– Item compilation– Quick Calculation
• Matlab– Labor cost translation
![Page 52: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/52.jpg)
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
![Page 53: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/53.jpg)
Cost by items
![Page 54: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/54.jpg)
Cost by items
Type Cost(USD)
Exterior - Brick on Mt.I. Stud 12730
Interior - 3 1/8" Partition (1-hr) 443
Interior - 6 1/8" Partition (2-hr) 1442
2' x 4' ACT System 784
Windows 74989
Generic - 9" 5960
Generic - 4" Brick 2264
Glazed 2814
Floor 61131
Wall 6669
Column 2001
Steel 551
Formwork 4520
Floodgate 7350
Total 177,833
![Page 55: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/55.jpg)
Comparison
$177,833 USD
• 8 rooms , 4 floors apartment
$25,000 USD
• 2 rooms apartment in India
177833-25000x4= $77833 USD
![Page 56: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/56.jpg)
Cost proportions
Floor38%
Windows38%
Exterior - Brick on Mt.I. Stud
6%
Floodgate4%
Wall3%
Generic - 9" 3%
formwork2%
Others6%
Type cost
Total cost is $200,005 USD
![Page 57: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/57.jpg)
Cost proportions
Sash36%
Metal deck28%
Cast-in-Place Concrete
15%
Masonry - Brick5%
Floodgate4%
Roof3%
formwork2%
Others7%
Material cost
Total cost is $200,005 USD
![Page 58: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/58.jpg)
RESULT ANALYSIS
![Page 59: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/59.jpg)
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
![Page 60: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/60.jpg)
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
![Page 61: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/61.jpg)
Time Spent (Ben)
• Ben (10 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)
40%
60%
Time Spent (Ben)
Communication Individual work
![Page 62: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/62.jpg)
Time Spent (Ken)
• Ken (7 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)
57%
43%
Time Spent (Ken)
Communication Individual work
![Page 63: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/63.jpg)
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
![Page 64: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/64.jpg)
Problems
Solved
• Icebreaking We wrote and shared a
document about ourselves.
• Not clear job assignment– Take over the cost estimation.
Unsolved
• Agenda preparing before regular meeting
![Page 65: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/65.jpg)
CONCLUSION
![Page 66: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/66.jpg)
Conclusion
Conclusion
ContributionLesson learned
![Page 67: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/67.jpg)
Contribution
• Design a flood safe renovation of an existing building
• Scheduling a construction
• A rough cost estimation
![Page 68: Vlab 1 final presentation ntu ncku](https://reader034.fdocuments.us/reader034/viewer/2022042609/568c3b0e1a28ab0235a8b246/html5/thumbnails/68.jpg)
Lesson Learned
Common views
• Different background makes some difficulties, but we think on the same line to finish the project.
• Hard to participate because of being in the virtual team.
• Work responsibility is not clear.
Different views
• UW: lack of specific information about the project and knowledge
• IIT: understand the India English problems and thank Will for his help
• IIT: 7:00 AM is too early
• IIT: hardware and Internet problems are challenges but it is getting better