Vitesse 201 Installation Guide Vitesse 201 Vitesse 201 Installation Installation Guide Guide SMC Enterprises Private Limited Manufacturer: Vitesse Vending Machines Distributors: Georgia Gold Coffee, Burn Energy Drink, Apeejay Typhoo Tea, Parle Agro, Godrej Vending Machines, Del- Monte. Branches at: Delhi, Noida and Gurgaon Contact us on 9811225804 Email: [email protected] www.VendingMachine.in

description

SMC Enterprises Private Limited is the manufacturer of Vitesse brand of Tea, Coffee and Hot beverage vending Machines. Vitesse vending machines are suitable for dispensing all types of premix based beverages. They are manufactured using latest technology. Vitesse vending machines are highly durable, robust and long lasting. Only best quality material is used in manufacturing which gives years of trouble free manufacturing and lowest cost of ownership. Vitesse hot beverage vending machines are backed by years of experience and service network of SMC Enterprises Private Limited. For any inquiry contact on +91 9811225804 or mail at [email protected] or visit www.VendingMachine.in SMC Enterprises Private Limited is also distributor of Georgia Gold Coffee, Burn Energy Drinks, Parle Agro, Apeejay Typhoo Tea, Godrej Vending Machines and entire range of Del Monte products in India.

Transcript of Vitesse 201 installation

Page 1: Vitesse 201 installation

Vitesse 201Installation Guide

Vitesse 201Vitesse 201Installation Installation

GuideGuide

SMC Enterprises Private LimitedManufacturer: Vitesse Vending Machines

Distributors: Georgia Gold Coffee, Burn Energy Drink, Apeejay Typhoo Tea,

Parle Agro, Godrej Vending Machines, Del-Monte.Branches at: Delhi, Noida and Gurgaon

Contact us on 9811225804Email: [email protected]

www.VendingMachine.in

Page 2: Vitesse 201 installation

Unpacking the Machine

Cut the TAPE with a sharp knife.Do not push the knife too hard.Cut both side.

Page 3: Vitesse 201 installation

Unpacking the Machine

Hold the Machine and turn the Flaps outside of the box.Do this with all four Flaps

Page 4: Vitesse 201 installation

Unpacking the Machine

Pull out the Packing box.Pull out the Protective covering.Do not use any sharp object to do this.

Page 5: Vitesse 201 installation

Unpacking the Machine

The Machine has Stainless Steel Top and Bottom which means longer its life.The Drainage pipe is packed inside the Stainless steel Drip tray.

Page 6: Vitesse 201 installation

Unpacking the Machine

Please stand the machine on a Plane surface.There must be a Gap of four (4) Inches between the machine and the nearest wall.

Page 7: Vitesse 201 installation

Unpacking the Machine

Keys of the machine are attached with the power cord.Cut the tie carefully and detach the keys.

Page 8: Vitesse 201 installation

Filling Premixes in the Canisters

Page 9: Vitesse 201 installation

Filling Premixes in the Canisters

Push the canister upwards then pull out.

Page 10: Vitesse 201 installation

Filling Premixes in the Canisters

Turn the Elbow spout upwards to not let the Premix get waste.

Page 11: Vitesse 201 installation

Filling Premixes in the Canisters

Pour the premix in the canister slowly.DO NOT OVEFILL the Canisters

Page 12: Vitesse 201 installation

Filling Premixes in the Canisters

Re-cap the canister properly after filling.Please Re-cap the canisters after every filling.

Page 13: Vitesse 201 installation

Filling Premixes in the Canisters

There is a male groove in the machine and a female groove on the Canister.Please match them (male to female) when fixing the canisters.

Page 14: Vitesse 201 installation

Filling Premixes in the Canisters

Fix the Canisters properly.Turn the elbow spouts downwards to the mixing bowls.

Page 15: Vitesse 201 installation

Installation of the Machine

Switch on the Machine only after Putting the Water bottle on the Top.

Page 16: Vitesse 201 installation

Installation of the Machine

When the heating indicator is on it means the machine is getting ready.When it's off Machine is ready to serveThe temperature of Dispenses can be controlled Manually.

Heating Indicator

Temperature controller

Machine is ready to serve when the

indicator is off

Page 17: Vitesse 201 installation

Installation of the Machine

Put the cup on the located place.Select your Choice.

Page 18: Vitesse 201 installation

Installation of the Machine

Please Do not touch the dispenses they are extremely hot.Grab your cup.