Visual Assessment of Industrial Storm Water
Discharges
![Page 2: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/2.jpg)
Housekeeping
• All lines will be muted • Questions can be sent to us via the
question/chat box • We will use polls during the webinar • We will record webinar and post online
2
![Page 4: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/4.jpg)
Why is there a need to monitor storm water runoff?
• Storm water runoff has a major impact on water quality
• Storm water permits were developed so that industrial operations could be proactive
• Management of controls at the facilities effects the quality of the runoff
• Without monitoring we don’t know the quality of the runoff
![Page 5: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/5.jpg)
Observe the discharge to assess effectiveness of the control measures
![Page 6: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/6.jpg)
Visual Assessment components
1. Written procedures
2. Sample collection
3. Assessment – Discharge at time of collection – Sample collected at time of discharge – Documentation
![Page 7: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/7.jpg)
Visual Assessment of Storm Water Discharges
• Included as a component (part) of the comprehensive inspection
• Comprehensive inspections conducted quarterly
• Or on an department approved alternative schedule
• Conducted by the Industrial Storm Water Certified Operator
![Page 8: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/8.jpg)
Written Procedures
![Page 9: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/9.jpg)
Develop Procedures
• Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of
Coverage or Individual Permit issuance or reissuance
– Incorporated into the Storm Water Pollution Prevention Plan, Comprehensive Inspection section
– Determined to be acceptable as part of the SWPPP review.
![Page 10: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/10.jpg)
Written Procedures Include
• Identifying those who will be conducting the visual assessment – Certified Operator must be a Industrial Storm
Water Certified Operator – Staff working in conjunction with or under the
supervision of the Certified Operator
![Page 11: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/11.jpg)
Written Procedures- Sample Collection
![Page 12: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/12.jpg)
Discharge Points • Identification of Discharge Points-location
where storm water is discharged from the property-Two types of Discharge points Outfalls
• Stream • County Drain • Lake • Wetland
Points of Discharge
• On site catch basins
• Trench drains • In street catch
basins • Conveyance to
road side ditch
![Page 13: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/13.jpg)
Discharge Points - Outfalls
• Direct discharges to surface waters
(Outfall)
![Page 14: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/14.jpg)
Outfalls
![Page 15: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/15.jpg)
Discharge Points-
Discharges to a separate storm sewer system
(Point of discharge)
![Page 16: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/16.jpg)
Points of Discharge
![Page 17: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/17.jpg)
![Page 18: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/18.jpg)
Receiving Waters – Blue Water Drain
Point of discharge
Sampling Point
![Page 19: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/19.jpg)
Multiple Discharge Points
• Substantially identical storm water effluent • Conduct Visual Assessment at one of the
discharge points
![Page 20: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/20.jpg)
Substantially Identical Discharge Points
• How is this determined? – Look at the significant materials evaluation or
inventory • Significant materials • Industrial Activities
– Indicated on SWPPP site map
![Page 21: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/21.jpg)
Significant Material Inventory
Industrial Activities Discharge Point
Significant materials
![Page 22: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/22.jpg)
![Page 23: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/23.jpg)
![Page 24: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/24.jpg)
![Page 25: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/25.jpg)
#002
#003
#001
![Page 26: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/26.jpg)
Unregulated areas • Areas without industrial activity
– Customer or Employing Parking Areas – Lawn
Unregulated discharges • Areas that do not discharge directly or indirectly
to surface waters – Combined sewer discharges – Ground water discharges – Sanitary sewer
![Page 27: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/27.jpg)
Written Procedures
• Part of the Storm Water Pollution Prevention Plan
• Reviewed to determine if they meet requirements of permit
• Changes may be required
![Page 28: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/28.jpg)
Sample Collection and Discharge Observations:
![Page 29: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/29.jpg)
Sample Collection From Discharge Points
![Page 30: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/30.jpg)
Have your collection equipment ready
![Page 31: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/31.jpg)
Frequency
• As often as the comprehensive inspection
– Once in each quarter • January-March • Apr-June • July-September • October-December
– According to Approved Alternative Schedule
![Page 32: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/32.jpg)
Sample Collection and Observations
• Timing – Within 1 month of the control measure
observations Comprehensive
Inspection Controls
Observations
Within I month
Comprehensive Inspection
Visual Assessment
![Page 33: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/33.jpg)
Timing
• Within 1 month of the control measure observations
![Page 34: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/34.jpg)
Sample Collection and Observations Timing
– At least 72 hours from a previous storm event (qualifying storm event)
– Within 30 minutes of beginning of the storm water discharge (first flush) – Within 60 minutes if not possible to do in 30 minutes (document why)
![Page 35: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/35.jpg)
Discharge structure with valve
![Page 36: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/36.jpg)
Sample Collection and Observations
• Collect storm water discharge sample in a clean clear container
• Collect a sample that is representative of the discharge
![Page 37: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/37.jpg)
• Adverse Weather Conditions
– If unable to conduct assessment – Conduct Assessment during next qualifying storm
event
During storm event lightening
![Page 38: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/38.jpg)
Adverse weather conditions
• Defined – Dangerous conditions or conditions that create
inaccessibility for personnel • Flooding • Electrical Storms • High winds • Icy conditions
– Situations that make sampling impossible(no
discharge) • Drought • Extended frozen conditions
![Page 39: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/39.jpg)
• Documentation for not conducting visual assessment
![Page 40: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/40.jpg)
Sample collection from
Structural Controls
![Page 41: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/41.jpg)
Cold Weather Visual Assessments
• For snowmelt- during a period with a measureable discharge
![Page 42: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/42.jpg)
Collecting the Sample Determine how you will collect the sample
![Page 43: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/43.jpg)
Specialized Equipment
![Page 44: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/44.jpg)
Sample Collection and Observation Alternatives?
• Automated samplers
– The visual assessment of the sample must be conducted by the Certified Operator within 48 hours of sample collection
• Mix prior to visual examination
– Include in written procedures
![Page 45: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/45.jpg)
Alternatives • Certified Operator is not available?
– Use staff that have received appropriate training for taking the storm water sample
– Use a device to visually record the discharge (optional)
![Page 46: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/46.jpg)
Staff Training
• View webinar • Provide documentation that staff assisting in
the visual assessment have received the appropriate training
• Included in Written Procedures
![Page 47: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/47.jpg)
Sample storage • Assessed after collection or
• Ensure that the sample is properly stored
• Storage procedures Included in written procedures
![Page 48: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/48.jpg)
Visual Assessment
• Storm water discharging
• Sample collected at time of discharge
![Page 49: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/49.jpg)
• Observations of the discharge
– Color – Turbidity (cloudiness) – Oil Film (sheen) – Floating Solids – Foams – Settleable solids – Suspended solids – Odor
![Page 50: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/50.jpg)
Color
![Page 51: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/51.jpg)
Turbidity
Plume
![Page 52: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/52.jpg)
Petroleum Sheens or Films
![Page 53: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/53.jpg)
Floating Solids
Wood solids
Ground rubber
Plastic resins
![Page 54: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/54.jpg)
Foams
![Page 55: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/55.jpg)
Settleable Solids
Sediment delta
![Page 56: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/56.jpg)
Suspended Solids
![Page 57: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/57.jpg)
Suspended Liquids
Water with soluble oils
![Page 58: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/58.jpg)
Odors
![Page 59: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/59.jpg)
Combinations
![Page 60: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/60.jpg)
Combinations
![Page 61: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/61.jpg)
Naturally Occurring Variations
![Page 62: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/62.jpg)
Documentation
![Page 63: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/63.jpg)
Documentation of Visual Assessment
• Discharge points • Storm event information (get a rain gauge)
– Length (Hours) – Amount of precipitation (inches) – Duration of time since previous event or snow melt discharge – Date and time discharge began
![Page 64: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/64.jpg)
• Weather Underground:
www.wunderground.com www.wunderground.com/history
• National Weather Service: www.weather.gov
![Page 65: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/65.jpg)
![Page 66: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/66.jpg)
Description of the discharge
![Page 67: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/67.jpg)
Observing the sample (Assessment)
• By Certified Operator – After collection – Within 48 hours of a collection
• Appropriately mixed/shaken
![Page 68: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/68.jpg)
Documentation
• Sample collection – Discharge Point – Date of discharge – Time
• Collection • Beginning of discharge
– Collector
![Page 69: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/69.jpg)
Slide Label
![Page 70: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/70.jpg)
Documentation
• Collector • Assessment
– Certified Operator – Name – Title – Operator Certification Number
![Page 71: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/71.jpg)
Documentation • Nature of Discharge (Rain or snowmelt)
Rain Snowmelt
![Page 72: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/72.jpg)
Documentation • Probable source of contamination
![Page 73: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/73.jpg)
Take Action
![Page 74: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/74.jpg)
Documentation • Any unnatural characteristics of the discharge
shall be reported
![Page 75: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/75.jpg)
![Page 76: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/76.jpg)
![Page 77: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/77.jpg)
Documentation
• Photographic evidence – Photo taken of the sample against a white
background – Colored photo or – Electronic file
![Page 78: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/78.jpg)
Documentation • Explanation why sample was not taken during
the first 30 minutes of the storm event
![Page 79: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/79.jpg)
Summary
• Be Prepared • Provide appropriate training and supervise the
collection of the sample
![Page 80: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/80.jpg)
Summary
• Document the characteristics of the discharge at the time of the discharge
• Certified Operator must visually assess the sample collected
• Document the visual assessment – Photograph – Written report
• Make corrective actions in a timely manner
![Page 81: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/81.jpg)
Assistance
• www.michigan.gov/deqstormwater
• Contact Industrial Storm Water Staff
• Compliance assistance
• FAQ sheet
![Page 82: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/82.jpg)
Staff Contacts
![Page 83: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/83.jpg)
Goal Clean Discharges
![Page 84: Visual Assessment of Storm Water Discharges · • Written procedures for conducting the visual assessment – Developed within 6 months of Certificate of Coverage or Individual Permit](https://reader034.fdocuments.us/reader034/viewer/2022050609/5fb08a978e5bfa5b51033935/html5/thumbnails/84.jpg)
Questions?