Visio-Cluster Work Around v.2.0

download Visio-Cluster Work Around v.2.0

of 5

Transcript of Visio-Cluster Work Around v.2.0

  • 8/14/2019 Visio-Cluster Work Around v.2.0

    1/5

    Prepared By: Raymond A. Monaco

  • 8/14/2019 Visio-Cluster Work Around v.2.0

    2/5

    Document Path

    directory > directory > ...

    Document History Version 1.0

  • 8/14/2019 Visio-Cluster Work Around v.2.0

    3/5

    Select Contacts & M

    OVERVIEW

    NOTES

    Type Section

    TITLAUTHOR

    Raymond Mona

    1

    2

    CATEGORIZE REQUEST

    CATEGORY REQUEST

    Special Project:

    Work Class: ELECTRICAL

    Request Category: MILE

    Inspection Method: STANDARD

    VALIDATE FILING

    Filing Type: Application

    BIS ID: Z113764BIN: 1026318

    Address/Location: 10 Columbus Circle

    Location Use: CONDOMINIUMS

    Borough: Manhattan

    Filed By: CIRO LUIPO

    SET SCOPE OF INSPECTION

    ---

    Inspection Purpose: GENERAL

    Floors:

    SCHEDULE WORK ORDER

    ORG Group: ELEC UNIT

    Team: GEN-MHSchedule Date: 7/22/2009

    SELECT REQUESTOR AND SITE CONTACT

    Meeting Point:

    Point of Contact:

    Floor/Room/Apt No:

    Work Class * Electrical

    Request Category * Work Milestone

    Inspection Method * Standard

    Filing Type * Electrical Application

    BIS ID *

    Special Project Select...

    Cancel FinishCATEGORIZE REQUEST

    Cluster Type:

    Request ID:

    1

    2

    *Note

    Requestor:

  • 8/14/2019 Visio-Cluster Work Around v.2.0

    4/5

    Select Contacts & M

    OVERVIEW

    NOTES

    Type Section

    TITLAUTHOR

    Raymond Mona

    1

    CATEGORIZE REQUEST

    CATEGORY REQUEST

    Special Project:

    Work Class: ELECTRICAL

    Request Category: MILE

    Inspection Method: STANDARD

    VALIDATE FILING

    Filing Type: Application

    BIS ID: Z113764BIN: 1026318

    Address/Location: 10 Columbus Circle

    Location Use: CONDOMINIUMS

    Borough: Manhattan

    Filed By: CIRO LUIPO

    SET SCOPE OF INSPECTION

    15---

    Inspection Purpose: GENERAL

    Floors:

    SCHEDULE WORK ORDER

    ORG Group: ELEC UNIT

    Team: GEN-MHSchedule Date: 7/22/2009

    SELECT REQUESTOR AND SITE CONTACT

    Meeting Point:Point of Contact:

    Floor/Room/Apt No:

    New Duration:

    Cancel FinishSCHEDULE WORK ORDER

    Requestor:

    Reset Re-Check Availability

    New Skills: Desired Date:

    Inspection Date Possibilities *

    Schedule Inspection Work Order

    Scheduling Template:Org Group: ELEC UNIT

    Team: GEN-MH

    Special Projects:

    Inspection Duration: 150

    Building Access Form:

    To:

    1

    Date Available Min Select One05/06/2008 (Tue)

    05/08/2008 (Thr)

    05/09/2008 (Fri)

    05/12/2008 (Mon)

    05/13/2009 (Tue)

    05/14/2009 (Wed)

    05/15/2009 (Thr)

    200 min

    50 min

    335 min

    800 min

    550 min

    720 min

    860 min

  • 8/14/2019 Visio-Cluster Work Around v.2.0

    5/5

    Requestor:Requestor:

    CATEGORY REQUEST

    Special Project:

    Work Class: ELECTRICAL

    Request Category: MILE

    Inspection Method: STANDARD

    VALIDATE FILING

    Filing Type: Application

    BIS ID: Z113764BIN: 1026318

    Address/Location: 10 Columbus Circle

    Location Use: CONDOMINIUMS

    Borough: Manhattan

    Filed By: CIRO LUIPO

    SET SCOPE OF INSPECTION

    ---

    Inspection Purpose: GENERAL

    Floors:

    SCHEDULE WORK ORDER

    ORG Group: ELEC UNIT

    Team: GEN-MH

    Schedule Date: 7/22/2009

    SELECT REQUESTOR AND SITE CONTACT

    Meeting Point:Point of Contact:

    Select the Select Requestor & Site Contact. x

    Confirmation Page

    Once you reviewed the information please click the close button.

    CONFIRMATION NUMBER : 10245603/06/2010 Thursday 10am

    FinishCancelSelect Requestor and Site Contact.

    Select Contacts &

    OVERVIEW

    NOTES

    Type Section

    TITLAUTHOR

    Raymond Mona

    1

    2

    Mini-Flow

    1

    2

    Requestor: