Visio-Cluster Work Around v.2.0
-
Upload
raymondmonaco -
Category
Documents
-
view
219 -
download
0
Transcript of Visio-Cluster Work Around v.2.0
-
8/14/2019 Visio-Cluster Work Around v.2.0
1/5
Prepared By: Raymond A. Monaco
-
8/14/2019 Visio-Cluster Work Around v.2.0
2/5
Document Path
directory > directory > ...
Document History Version 1.0
-
8/14/2019 Visio-Cluster Work Around v.2.0
3/5
Select Contacts & M
OVERVIEW
NOTES
Type Section
TITLAUTHOR
Raymond Mona
1
2
CATEGORIZE REQUEST
CATEGORY REQUEST
Special Project:
Work Class: ELECTRICAL
Request Category: MILE
Inspection Method: STANDARD
VALIDATE FILING
Filing Type: Application
BIS ID: Z113764BIN: 1026318
Address/Location: 10 Columbus Circle
Location Use: CONDOMINIUMS
Borough: Manhattan
Filed By: CIRO LUIPO
SET SCOPE OF INSPECTION
---
Inspection Purpose: GENERAL
Floors:
SCHEDULE WORK ORDER
ORG Group: ELEC UNIT
Team: GEN-MHSchedule Date: 7/22/2009
SELECT REQUESTOR AND SITE CONTACT
Meeting Point:
Point of Contact:
Floor/Room/Apt No:
Work Class * Electrical
Request Category * Work Milestone
Inspection Method * Standard
Filing Type * Electrical Application
BIS ID *
Special Project Select...
Cancel FinishCATEGORIZE REQUEST
Cluster Type:
Request ID:
1
2
*Note
Requestor:
-
8/14/2019 Visio-Cluster Work Around v.2.0
4/5
Select Contacts & M
OVERVIEW
NOTES
Type Section
TITLAUTHOR
Raymond Mona
1
CATEGORIZE REQUEST
CATEGORY REQUEST
Special Project:
Work Class: ELECTRICAL
Request Category: MILE
Inspection Method: STANDARD
VALIDATE FILING
Filing Type: Application
BIS ID: Z113764BIN: 1026318
Address/Location: 10 Columbus Circle
Location Use: CONDOMINIUMS
Borough: Manhattan
Filed By: CIRO LUIPO
SET SCOPE OF INSPECTION
15---
Inspection Purpose: GENERAL
Floors:
SCHEDULE WORK ORDER
ORG Group: ELEC UNIT
Team: GEN-MHSchedule Date: 7/22/2009
SELECT REQUESTOR AND SITE CONTACT
Meeting Point:Point of Contact:
Floor/Room/Apt No:
New Duration:
Cancel FinishSCHEDULE WORK ORDER
Requestor:
Reset Re-Check Availability
New Skills: Desired Date:
Inspection Date Possibilities *
Schedule Inspection Work Order
Scheduling Template:Org Group: ELEC UNIT
Team: GEN-MH
Special Projects:
Inspection Duration: 150
Building Access Form:
To:
1
Date Available Min Select One05/06/2008 (Tue)
05/08/2008 (Thr)
05/09/2008 (Fri)
05/12/2008 (Mon)
05/13/2009 (Tue)
05/14/2009 (Wed)
05/15/2009 (Thr)
200 min
50 min
335 min
800 min
550 min
720 min
860 min
-
8/14/2019 Visio-Cluster Work Around v.2.0
5/5
Requestor:Requestor:
CATEGORY REQUEST
Special Project:
Work Class: ELECTRICAL
Request Category: MILE
Inspection Method: STANDARD
VALIDATE FILING
Filing Type: Application
BIS ID: Z113764BIN: 1026318
Address/Location: 10 Columbus Circle
Location Use: CONDOMINIUMS
Borough: Manhattan
Filed By: CIRO LUIPO
SET SCOPE OF INSPECTION
---
Inspection Purpose: GENERAL
Floors:
SCHEDULE WORK ORDER
ORG Group: ELEC UNIT
Team: GEN-MH
Schedule Date: 7/22/2009
SELECT REQUESTOR AND SITE CONTACT
Meeting Point:Point of Contact:
Select the Select Requestor & Site Contact. x
Confirmation Page
Once you reviewed the information please click the close button.
CONFIRMATION NUMBER : 10245603/06/2010 Thursday 10am
FinishCancelSelect Requestor and Site Contact.
Select Contacts &
OVERVIEW
NOTES
Type Section
TITLAUTHOR
Raymond Mona
1
2
Mini-Flow
1
2
Requestor: