· Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space...

61
Rev . ECO Description Author Approve d Date A INITIAL RELEASE B. Klatt W. Mayer 03/02/92 B To incorporate 99-02008, to change ref. from 64 # to 99#, General Editorial Update B. Klatt M. Bautz 07/16/14 99-02006 Page 1 of 61 Revision B Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection Dwg. No. 99-02006 Revision B May 23, 2014

Transcript of · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space...

Page 1: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Rev. ECO Description Author Approved DateA INITIAL RELEASE B. Klatt W. Mayer 03/02/92B To incorporate 99-02008, to change ref.

from 64 # to 99#, General Editorial Update

B. Klatt M. Bautz 07/16/14

99-02006 Page 1 of 34 Revision B

Massachusetts Institute of TechnologyKavli Institute for Astrophysics and Space

Research (MKI)

Receiving Inspection

Dwg. No. 99-02006Revision B

May 23, 2014

Page 2: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

99-02006 Page 2 of 34 Revision B

Page 3: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Table of Contents

PREFACE 4

1.0 PURPOSE 5

2.0 SCOPE 5

3.0 REFERENCE DOCUMENTS 5

4.0 GENERAL 5

4.1 PURCHASE REQUISITIONS 54.2 STATISTICAL SAMPLING 54.3 PURCHASED ITEMS 54.4 ITEMS ON HOLD 54.5 NOT ACCEPTED ITEMS 54.6 ACCEPTED ITEMS 64.7 LIMITED LIFE ITEMS 64.8 INCOMING INSPECTION ACTIVITY 64.9 RECEIVING INSPECTION FILES 6

5.0 PROCEDURE 6

5.1 RECEIVING INSPECTOR 65.2 PERFORMANCE ASSURANCE MANAGER 6

6.0 CHECKLISTS 7

CAPACITOR, CERAMIC – CKR05/CKR06 – MIL-C-39014/01 OR /02 8

CAPACITOR, CERAMIC – CDR/CWR 9

CAPACITOR, TANTALUM, NON-SOLID – CLR79 – MIL-C-39006/22 10

CAPACITOR, TANTALUM, SOLID – CSR13 – MIL-C-39003/01 11

CAPACITOR, METALIZED PLASTIC – CRH01 – CRH05 – MIL-C-83421/01 12

RESISTOR, WIREWOUND, ACCURATE – RBR XX – MIL-R-39005/XX 13

RESISTOR, WIREWOUND, RWR 14

RESISTOR, COMPOSITION – RCR05 AND RCR07 – MIL-R-39008/04 AND /01 15

RESISTOR, FILM – RLR05 AND RLR07 – MIL-R-39017/05 AND /01 16

RESISTOR, VARIABLE – RQXXX – MIL-R-39023/XX 17

TRANSISTOR, MILITARY – JANTX2N--/JANTXV2N-- - MIL-S-19500 18

99-02006 Page 3 of 34 Revision B

Page 4: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

DIODE, MILITARY – JANTX1N--/JANTXV1N-- - MIL-S-19500 19

MICROCIRCUITS, MILITARY – SMD 20

MICROCIRCUITS, GFE – GSFC SCD 21

MICROCIRCUITS, NONSTANDARD –MIT SCD 22

MICROCIRCUITS, NONSTANDARD – OTHER – MIT SCD 23

RELAYS, STANDARD – MIL-R-39016/12 24

CONNECTORS, GFE – GSFC SCD 25

PRINTED CIRCUIT BOARDS 26

MECHANICAL PARTS 27

FASTENERS 28

FABRICATED MECHANICAL PARTS 29

FABRICATED ASSEMBLIES 30

METALIC RAW MATERIALS 31

NONMETALIC RAW MATERIALS 32

ADHESIVES 33

99-02006 Page 4 of 34 Revision B

Page 5: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Preface

Revision A was the Initial Release of 99-02006 written by Brian Klatt 01/23/92 and checked by W.F. Mayer on 03/02/92.

Revision B issued a general editorial update and changes to incorporate 99-02008, to change reference from 64# to 99#, and a new format on 07/16/14.

99-02006 Page 5 of 34 Revision B

Page 6: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

1.0 PurposeThis procedure provides specific instructions for performing receiving inspection of purchased materials or parts, including fabricated parts and assemblies and processes performed outside of MIT.

2.0 ScopeThis procedure applies to all purchased parts, materials, processes, and assemblies used in the fabrication of flight hardware.

3.0 Reference Documents

MIT Document Title99-02001 Inspection and Documentation99-02004 Nonconforming Material and

Nonconforming Material Reports

4.0 General

4.1 Purchase RequisitionsAll purchase requisitions for parts, materials, processes, and assemblies, used in the fabrication of flight hardware must be signed by the Performance Assurance Manager. Each of thee signed requisitions will be copied and filed in the receiving area for reference during receiving inspection.

4.2 Statistical SamplingItems are statistically sampled or 10% inspected in accordance with the criteria detailed in table 8-2 of the Performance Assurance Implementation Plan. Inspection methods and acceptance criteria are listed in the attached checklists for each unique item.

4.3 Purchased ItemsPurchased items are held in receiving inspection and not released into bonded stock until all inspections and/or test operations are complete and acceptable and required certification or test reports have been reviewed and accepted.

4.4 Items on HoldItems on hold for any reason (e.g., it needs certifications, test reports, data, etc.) must be identified and segregated from other items in receiving inspection.

4.5 Not Accepted ItemsItems that are not accepted must be segregated for material review. A reject tag is prepared and attached to the material for identification. The reject tag is specified in “Inspection and Documentation”, MIT document 99-02001, paragraph 1.1.6. Instructions for its use are in section 4.0 of that document.

99-02006 Page 6 of 34 Revision B

Page 7: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

4.6 Accepted ItemsItems that are accepted require an Inspection Status Tag which is specified in “Inspection and Documentation”, MIT document 99-02001, paragraph 1.1.5. Instructions for its use are in section 3.0 of that document.

4.7 Limited Life ItemsLimited Life items require a Shelf Life Tag that is specified in “Inspection and Documentation”, MIT document 99-02001, paragraph 1.1.9.

4.8 Incoming Inspection ActivityThe result of all incoming inspection activity is recorded on the Incoming Inspection Report that is specified in “Inspection and Documentation”, MIT 99-02001, paragraph 1.1.4. Instructions for its use are in section 2.0 of that document.

4.9 Receiving Inspection FilesRecords of inspections and tests are filed by MIT part number in the Receiving Inspection Files. Certificates of Compliance (C of C),test data, and all vendor documentation shall be included in this file.

5.0 Procedure

5.1 Receiving Inspectora. Obtains copies of applicable drawings, purchase order requests, specifications,

inspection checklists, etc.b. Obtains necessary equipment required such as tools, microscope, and test

equipment.c. Checks the packing list against the items received and the purchase order

request.d. Performs required inspections and tests.e. Reviews vendor documentation and test data for completeness and

compliance with procurement documents.f. Prepares all required receiving inspection documentation in accordance with

MIT document 99-02001.g. Prepares the Shelf Life Tag if applicable.h. Returns drawings, specifications, test equipment, etc. obtained in a. and b.

above.i. Files all receiving documentation in Receiving Inspection Files.j. Moves completed items to appropriate are; i.e. “Hold”, “Bonded Stock” or

“Material Review”.k. Refers questionable or disputed matters to the Performance Assurance

Manager.

5.2 Performance Assurance Managera. Initiates training classes, as necessary, to support inspection or test methods

and inspection criteria.b. Initiates Material Review board (MRB) action on nonconforming material in

accordance with MIT document 99-02004, Nonconforming Material and Nonconforming Material Reports.

c. Approves decisions on items initially dispositioned to “scrap” or “RTV”.d. Establishes criteria for items not covered herein.

99-02006 Page 7 of 34 Revision B

Page 8: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

6.0 ChecklistsThe following checklists are used in receiving inspection and are attached for information:

Capacitor, Ceramic - CKR05/CKR06Capacitor, Ceramic - CDR/CWRCapacitor, Tantalum, Nonsolid - CLR79Capacitor, Tantalum, Solid - CSR13Capacitor, Metalized Plastic - CRH05Resistor, Wirewound, Accurate - RBR XXResistor, Wirewound - RWRResistor, Composition - RCR05/RCR07Resistor, Film - D/MResistor, Variable - RQ XXXTransistor, Military - JANTX2N--/JANTXV2NDiode, Military – JANTX1N--/JANTX1VN--Microcircuit, Military SMDMicrocircuit, GFEMicrocircuit, NonstandardMicrocircuit, Nonstandard, OtherRelays, StandardConnectors, MilitaryConnectors, GFEPrinted Circuit BoardsMechanical PartsFastenersFabricated Mechanical PartsFabricated AssembliesMetallic Raw MaterialsNonmetallic Raw MaterialsAdhesives

99-02006 Page 8 of 34 Revision B

Page 9: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Capacitor, Ceramic – CKR05/CKR06 – MIL-C-39014/01 or /02100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 9 of 34 Revision B

Page 10: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Capacitor, Ceramic – CDR/CWR100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 10 of 34 Revision B

Page 11: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Capacitor, Tantalum, Non-Solid – CLR79 – MIL-C-39006/22100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 11 of 34 Revision B

Page 12: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Capacitor, Tantalum, Solid – CSR13 – MIL-C-39003/01100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 12 of 34 Revision B

Page 13: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Capacitor, Metalized Plastic – CRH01 – CRH05 – MIL-C-83421/01100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 13 of 34 Revision B

Page 14: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Resistor, Wirewound, Accurate – RBR XX – MIL-R-39005/XX

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 14 of 34 Revision B

Page 15: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Resistor, Wirewound, RWR

100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 15 of 34 Revision B

Page 16: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Resistor, Composition – RCR05 and RCR07 – MIL-R-39008/04 and /01100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 16 of 34 Revision B

Page 17: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Resistor, Film – RLR05 and RLR07 – MIL-R-39017/05 and /01100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 17 of 34 Revision B

Page 18: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Resistor, Variable – RQXXX – MIL-R-39023/XX100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor MIN.

RES.Ω

MAX.RES.Ω

99-02006 Page 18 of 34 Revision B

Page 19: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Transistor, Military – JANTX2N--/JANTXV2N-- - MIL-S-19500100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 19 of 34 Revision B

Page 20: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Diode, Military – JANTX1N--/JANTXV1N-- - MIL-S-19500100 % RECEIVING

VISUAL INSPECTION TEST

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 20 of 34 Revision B

Page 21: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Microcircuits, Military – SMD100 % RECEIVING

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 21 of 34 Revision B

Page 22: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Microcircuits, GFE – GSFC SCD100 % RECEIVING

VISUAL INSPECTION TESTDATA

Date Part Number Purchase Order Number

Manufacturer and Distributor

YES NO

99-02006 Page 22 of 34 Revision B

Page 23: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Microcircuits, Nonstandard –MIT SCD100 % RECEIVING

VISUAL INSPECTION SOURCE INSPECT.

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 23 of 34 Revision B

Page 24: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Microcircuits, Nonstandard – Other – MIT SCD100 % RECEIVING

VISUAL INSPECTION SOURCE INSPECT.

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 24 of 34 Revision B

Page 25: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Relays, Standard – MIL-R-39016/12100 % RECEIVING

Date Part Number Purchase Order Number

Manufacturer and Distributor

99-02006 Page 25 of 34 Revision B

Page 26: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Connectors, GFE – GSFC SCD100 % RECEIVING

VISUAL INSPECTION TESTDATA

Date Part Number Purchase Order Number

Manufacturer and Distributor

YES NO

99-02006 Page 26 of 34 Revision B

Page 27: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Printed Circuit Boards100 % RECEIVING

TEST

Date Part Number/Drawing Number

Purchase Order Number

Manufacturer

99-02006 Page 27 of 34 Revision B

Page 28: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Mechanical Parts100 % RECEIVING

VISUAL INSPECTION(specify additional items)

DATA

Date Part Name andPart Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 28 of 34 Revision B

Page 29: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Fasteners100 % RECEIVING

Date Part Numberor

Size

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 29 of 34 Revision B

Page 30: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Fabricated Mechanical Parts100 % RECEIVING

VISUAL INSPECTION(Specify additional items)

DATA

Date Part Name andPart Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 30 of 34 Revision B

Page 31: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Fabricated Assemblies100 % RECEIVING

VISUAL INSPECTION TEST

Date Assembly Nameand AssemblyPart Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 31 of 34 Revision B

Page 32: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Metallic Raw Materials100 % RECEIVING

VISUAL INSPECTION

Date Material Nameand

Part Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 32 of 34 Revision B

Page 33: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Nonmetallic Raw Materials100 % RECEIVING

VISUAL INSPECTION Limited LifeItem

Date Material Nameand

Part Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 33 of 34 Revision B

Page 34: · Web viewMassachusetts Institute of Technology. Kavli Institute for Astrophysics and Space Research (MKI) Receiving Inspection. Dwg. No. 99

Adhesives

100 % RECEIVING

VISUAL INSPECTION(specify additional items)

Limited Life Item

Date Adhesive Nameand

Part Number

Purchase Order Number

Manufacturer and Distributor

99-02006 Page 34 of 34 Revision B