INDONESIA SEPTEMBER 2015 - NOVEMBER 2015

description

Review of Indonesia market

Transcript of View Forecaster

Page 1: View Forecaster

INDONESIA

SEPTEMBER 2015 - NOVEMBER 2015

Page 2: View Forecaster

ABOUT

SNAPSHOT

OUTLOOK

INDONESIA

TOTAL CONSTRUCTION STARTS IN INDONESIA (BILLION IDR)

REVIEW FORECAST

Short term review

Long term review

Short term forecast

Long term forecast

SEPTEMBER 2015 - NOVEMBER 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

The BCI Forecaster is a leading monthly indicator of construction market values entering the market. It serves as an

indispensable short term planning tool, designed to enable decision makers to set realistic goals and parameters for their sales and

operations teams.

Construction start values are based on projects reported on a daily basis in BCI Asia’s real-time project leads database. Data is

provided for Indonesia as a whole, for building and civil construction, as well as for six key construction sectors: residential,

community, education, office, industrial and retail/ hotel (in each case broken down by public vs. private).

The short term review of market developments contrasts the most recent three months against the three months prior; the short

term forecast compares the upcoming three months with the most recent three months’ period. The long term review contrasts

the most recent twelve months against the corresponding twelve months’ period in the prior year. The long term forecast compares

the twelve months’ period ending three months out with the corresponding period in the prior year.

Statistical trend data is enhanced with information on important projects shaping the market. Projects both from Indonesia

(building construction) and the region (civil construction and specific construction sectors) are highlighted.

Total construction starts are expected to undergo a short-term fall of 28%, with most sectors turning out negative forecasts over the next

3 months. The weakening rupiah against the $ has been posing increasing costs on the construction industry, and the economy has

continued to contract despite recent government plans for stimulus measures.

- 7%

- 23%

- 28%

- 22%

80641

51395

70668

29846

31181

22360

35168

51971

18770

48230 38977

38015

41776

30144

43980

39746

31816

12239

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

Page 3: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL BUILDING CONSTRUCTION STARTS IN INDONESIA (BILLION IDR)

Building construction starts are expected to decline by 26% in the short-term, facing a significant slow-down towards November – except-

ing the industrial sector, all construction sectors appear to be experiencing drops of varying steepness. Some projects to look out for in-

clude the Kota Kasablanka 3 – Casa Grande Residence (Angello Tower) in South Jakarta and the Taman Anggrek Residence – Daffodil

Tower in West Jakarta, with a combined contribution of IDR 883 billion.

- 2%

- 8%

- 26%

- 13%

28784

27718

29810

25706

18917

15949

21648

34253

13832

29419

1846018724

23507

20269

21176

19814

18919

9262

0

5000

10000

15000

20000

25000

30000

35000

40000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

Category PID Project name Project location Construction

start date Project value

Residential 96187002 KOTA KASABLANKA 3 - CASA GRANDE RESIDENCE (ANGELLO TOWER)

South Jakarta, Greater Jakarta Oct 2015 589 bn IDR

Residential 112929002 TAMAN ANGGREK RESIDENCE - DAFFO-DIL TOWER

West Jakarta, Greater Jakarta Nov 2015 294 bn IDR

Community/Health/Recreation

124975002 SERIRIT PRATAMA HOSPITAL - BULELENG

Buleleng, Bali Sep 2015 25 bn IDR

Community/Health/Recreation

137419002 RSJ PROF DR VL RATUMBUYSANG HOS-PITAL

Manado, North Sulawesi Sep 2015 19 bn IDR

Education 135407002 POLITEKNIK NEGERI BANYUWANGI - GEDUNG PENDIDIKAN LANJUTAN

Banyuwangi, East Java Sep 2015 38 bn IDR

Education 117963002 POLITEKNIK NEGERI UJUNG PANDANG - GEDUNG TEKNIK KIMIA

Maros, South Sulawesi Sep 2015 37 bn IDR

Office 111903002 SIGNATURE GALLERY - PEONY TOWER Surabaya, East Java Sep 2015 288 bn IDR

Office 116959002 HOLLAND PARK CONDOTEL BATU - EXHI-BITION CENTRE

Batu, East Java Sep 2015 22 bn IDR

Industrial 137556002 DAIWA HOUSE INDUSTRY CENTRAL LOGISTICS

Bekasi, Greater Jakarta Sep 2015 250 bn IDR

Industrial 124415002 HITACHI TRANSPORT SYSTEM INDONE-SIA - CIKARANG

Bekasi, Greater Jakarta Sep 2015 150 bn IDR

Retail/Hotel 101210002 SOLO DOWNTOWN - HARRIS HOTEL (4 STARS)

Surakarta, Central Java Sep 2015 65 bn IDR

Retail/Hotel 124529002 RADISSON HOTEL (4 STARS) - ULUWATU Badung, Bali Sep 2015 56 bn IDR

Page 4: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CIVIL CONSTRUCTION STARTS IN INDONESIA (BILLION IDR)

Civil construction starts are expected to fall by 30% in the short–term. Some projects coming out of the public sector include the

Mamuju Arterial Road Development (MYC) in West Sulawesi and the Poros Lampung Selatan Road Development in Lampung.

- 13%

- 38%

- 30%

- 31%

51857

23677

40858

4139

12264

6411

13520

17718

4938

18811

2051719291

18269

9875

22804

19933

12897

2977

0

10000

20000

30000

40000

50000

60000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country (project loca-

tion)

Construc-tion start

date Project value

18406006 (SINGAPORE CHANGI AIRPORT (PACKAGE 1) Singapore Singapore Q4 2015 100 mn SGD

18795006 BEDOK CANAL CONTRACT 2 Singapore Singapore Q4 2015 102 mn SGD

51273008 SRINAKARIN ROAD - ROMKLAO ROAD (PHASE 1) Khet Bangkapi to Khet Ladkrabang, Bangkok

Thailand Q4 2015 1,200 mn Baht

69271008 SRINAKHARIN ROAD - ROMKLAO ROAD, PHASE 5, CROSS OVER BRIDGE HIGHWAY NO. 9

Highway no. 9, Khet Ladkrabang, Bang-kok 10520

Thailand Nov 2015 680 mn Baht

58725003 MASS RAPID TRANSIT 2 (MRT 2): SUNGAI BULOH - SERDANG - PUTRAJAYA (PACKAGE B1))

Kuala Lumpur Malaysia Q4 2015 10 mn RM

49324003 KWASA DAMANSARA: INFRASTRUCTURE PACKAGE 1A (KWASA SENTRAL)

Selangor Malaysia Sep 2015 160 mn RM

124242002 MAMUJU ARTERIAL ROAD DEVELOPMENT (MYC) Mamuju, West Sulawesi Indonesia Sep 2015 215 bn IDR

136676002 POROS LAMPUNG SELATAN ROAD DEVELOPMENT South Lampung, Lampung Indonesia Sep 2015 89 bn IDR

2986004 LRT LINE 1 SOUTH EXTENSION Bacoor City , Cavite Philippines Q4 2015 64,900 mn Pesos

55392004 TINOC 3 HYDRO ELECTRIC PROJECT Tinoc River , Tinoc , Ifugao 3609 Philippines Q4 2015 4,400 mn Pesos

67737007 LIANTANG / HEUNG YUEN WAI BOUNDARY CONTROL POINT SITE FORMATION AND INFRASTRUCTURE

North District, New Territories Hong Kong Q4 2015 2,000 mn HK$

68764007 DISTRICT COOLING SYSTEM (DCS) AT KAI TAK DEVEL-OPMENT (KTD) PHASE III

Kowloon City District, Kowloon Hong Kong Sep 2015 600 mn HK$

52022011 UPGRADE OF HIGHWAY 20, SECTION: KM154+400 - KM268+000 (PROJECT: UPGRADE OF HIGHWAY 20,

KM123+105,17 - KM268+000, PHASE 2) - LAM DONG

Km154+400 - Km268+000, Hwy 20, Lam Dong

Vietnam Sep 2015 1,351,340 mn VND

46047011 EAST - WEST ROAD, FROM NORTH - SOUTH NO.1 ROAD TO NORTH - SOUTH ROAD NO.3, NGHI SON ECONOMIC ZONE - THANH HOA

Tinh Gia District, Thanh Hoa Vietnam Oct 2015 279,000 mn VND

Page 5: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS RESIDENTIAL IN INDONESIA (BILLION IDR)

+ 2%

+ 14%

- 41%

- 10%

9509

8409

11093

11863

7546

7821

8135

11907

5559

9010

9163

8630

10545

8820

7918

5473

5598

5049

0

2000

4000

6000

8000

10000

12000

14000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country

(project loca-

tion)

Construc-

tion start

date

Project value

8330006 DAWSON CONTRACT 3 Singapore Singapore Q4 2015 240 mn SGD

18339006 DAWSON CONTRACT 5 Singapore Singapore Q4 2015 122 mn SGD

70130008 THE PRESIDENT SATHORN - RATCHAPRUEK 3 Khet Phasichareon, Bangkok 10160 Thailand Q4 2015 734 mn Baht

66037008 LADAWAN RAMA 2 Khet Bangkhuntient, Bangkok 10150 Thailand Q4 2015 4,000 mn Baht

50052003 PJ MIDTOWN DEVELOPMENT Petaling Jaya Malaysia Q4 2015 200 mn RM

54465003 ECONEST @ ECOWORLD NUSAJAYA: SERVICED APARTMENTS

Johor Bahru Malaysia Sep 2015 190 mn RM

96187002 KOTA KASABLANKA 3 - CASA GRANDE RESIDENCE (ANGELLO TOWER)

South Jakarta, Greater Jakarta Indonesia Oct 2015 589 bn IDR

112929002 TAMAN ANGGREK RESIDENCE - DAFFODIL TOWER West Jakarta, Greater Jakarta Indonesia Nov 2015 294 bn IDR

68862004 THE OBSERVATORY Pioneer St , Mandaluyong City 1554 Philippines Q4 2015 8,800 mn Pesos

48181004 BAYSHORE RESIDENTIAL RESORT 1 Bayshore City - Entertainment City , Paranaque City 1700

Philippines Oct 2015 7,440 mn Pesos

63809007 139-147 Argyle Street Residential Development Kowloon City District, Kowloon Hong Kong Q4 2015 1,200 mn HK$

63864007 Area 68B2 (TKOTL 126) Residential Development Sai Kung District, New Territories Hong Kong Nov 2015 2,880 mn HK$

48057011 CT4-CT9 APARTMENT BUILDINGS - THANH TRI DIS-TRICT

Thanh Tri District, Hanoi Vietnam Oct 2015 2,400,000 mn VND

48055011 VIET PHU AN APARTMENT BUILDING - DISTRICT 9 District 9, Ho Chi Minh Vietnam Oct 2015 738,000 mn VND

Page 6: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS COMMUNITY IN INDONESIA (BILLION IDR)

* incl. Recreation,

+ 90%

- 8%

- 60%

- 29%

2241

3263

2073

2872

837

864652581

427

10551016

1452

21082274

2313

1516

1048

145

0

500

1000

1500

2000

2500

3000

3500

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country

(project loca-

tion)

Construc-

tion start

date

Project value

10988006 RAFFLES HOSPITAL Singapore Singapore Sep 2015 100 mn SGD

16318006 NURSING HOME (604 beds) - new- 12 storey Singapore Singapore Q4 2015 42 mn SGD

64299008 PATTANI HOSPITAL OUT-PATIENT & EMERGENCY BUILDING

Amphur Muang, Pattani 94000 Thailand Q4 2015 486 mn Baht

65080008 BANGKRUAI HOSPITAL Amphur Bangkrui, Nonthaburi 11130 Thailand Q3 2015 395 mn Baht

28374003 GENTING HIGHLANDS 20TH CENTURY FOX OUT-DOOR THEME PARK

Pahang Malaysia Q4 2015 400 mn RM

57744003 KPJ SPECIALIST HOSPITAL AT KUCHING Kuching Malaysia Sep 2015 40 mn RM

124975002 SERIRIT PRATAMA HOSPITAL - BULELENG Buleleng, Bali Indonesia Sep 2015 25 bn IDR

137419002 RSJ PROF DR VL RATUMBUYSANG HOSPITAL Manado, North Sulawesi Indonesia Sep 2015 19 bn IDR

65746004 AGED CARE FACILITY - 13 buildings - new - 1 to 4 storey

Mendez , Cavite 4121 Philippines Sep 2015 4,000 mn Pesos

67058004 LOS BAÑOS DOCTORS HOSPITAL AND MEDICAL CENTER - ANNEX 3

Lopez Ave , Los Baños , Laguna 4030 Philippines Q4 2015 216 mn Pesos

61127007 SPORTS CENTRE IN AREA 24D, SHA TIN Sha Tin District, New Territories Hong Kong Sep 2015 605 mn HK$

44995011 MOC HOA AREA GENERAL HOSPITAL (PHASE 1) -

LONG AN

Kien Tuong Town, Long An Vietnam Sep 2015 330,030 mn VND

52281011 OFFICE OF NINH THUAN POLICE (PHASE 1) - NINH THUAN

Phan Rang - Thap Cham City, Ninh Thuan

Vietnam Sep 2015 166,500 mn VND

Page 7: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS EDUCATION IN INDONESIA (BILLION IDR)

+ 163%

+ 4%

- 46%

- 12%

774

1615

1383

1220

1065

364

281227

236

414

632

379

760

1308

16891554

403

73

0

200

400

600

800

1000

1200

1400

1600

1800

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country (project loca-

tion)

Construc-tion start

date Project value

18219006 TANGLIN TRUST SCHOOL Singapore Singapore Sep 2015 20 mn SGD

18865006 MAHA BODHI SCHOOL Singapore Singapore Q4 2015 16 mn SGD

65416008 RAJAMANGALA UNIVERSITY OF TECHNOLOGY KRUNGTHEP

Khet Sathorn, Bangkok 10120 Thailand Q4 2015 441 mn Baht

66102008 RAJAMANGALA UNIVERSITY OF TECHNOLOGY

SRIVIJAYA SONGKHLA

Amphur Muang, Songkhla 90000 Thailand Q4 2015 237 mn Baht

55493003 GEMS INTERNATIONAL SCHOOL @ TROPICANA METROPARK

Selangor Malaysia Nov 2015 48 mn RM

58161003 SEKOLAH RENDAH AGAMA TAMAN BUNGA RAYA: ADDITIONAL BLOCKS

Selangor Malaysia Sep 2015 8 mn RM

135407002 POLITEKNIK NEGERI BANYUWANGI - GEDUNG PENDIDIKAN LANJUTAN

Banyuwangi, East Java Indonesia Sep 2015 38 bn IDR

117963002 POLITEKNIK NEGERI UJUNG PANDANG - GEDUNG TEKNIK KIMIA

Maros, South Sulawesi Indonesia Sep 2015 37 bn IDR

48027004 THE ARETÉ Katipunan Ave , Quezon City 1108 Philippines Oct 2015 450 mn Pesos

70295004 MITSUBISHI TRAINING CENTER Santa Rosa , Laguna 4026 Philippines Q4 2015 65 mn Pesos

65796007 NEW TERRITORIES WEST REGIONAL OFFICE & WATER RESOURCES EDUCATION CENTRE OF WATER SUPPLIES DEPARTMENT

Yuen Long District, New Territories Hong Kong Sep 2015 800 mn HK$

63662007 EXTENSION OF THE HONG KONG ACADEMY FOR PERFORMING ARTS

Wan Chai District, Hong Kong Island Hong Kong Q3 2015 445 mn HK$

47869011 HIGH SCHOOL OF SOUTHEAST TRAN DUY HUNG URBAN ZONE - CAU GIAY DISTRICT

Cau Giay District, Hanoi Vietnam Sep 2015 166,000 mn VND

Page 8: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS OFFICE IN INDONESIA (BILLION IDR)

- 6%

- 36%

- 47%

- 26%

7865

3759 6951

1194

32351728

7852

1931

1980

2775

2486

2561

3386

1572

2374

1530

2065

262

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country (project loca-

tion)

Construction

start date Project value

14251006 FORMER ROBINSON TOWERS / INTERNATIONAL FACTORS BUILDING

Singapore Singapore Q4 2015 50 mn SGD

18793006 GOOGLE DATA CENTRE Singapore Singapore Q4 2015 12 mn SGD

65773008 SINGHA COMPLEX (SINGHA CORPORATION GROUP) Khet Wattana, Bangkok 10110 Thailand Q4 2015 780 mn Baht

59444008 OFFICE PERMANENT SECRETARY OF MINISTRY OF PUBLIC HEALTH

Amphur Muang, Nonthaburi 11000

Thailand Q4 2015 399 mn Baht

59032003 QUEENSVILLE: Q SUITES , Q AVENUE & Q TOWER (PHASE 1)

Kuala Lumpur Malaysia Q4 2015 800 mn RM

50405003 THE COLONY @ INFINITUM: SOHO (PHASE 2) Kuala Lumpur Malaysia Oct 2015 240 mn RM

111903002 SIGNATURE GALLERY - PEONY TOWER Surabaya, East Java Indonesia Sep 2015 288 bn IDR

116959002 HOLLAND PARK CONDOTEL BATU - EXHIBITION CEN-TRE

Batu, East Java Indonesia Sep 2015 22 bn IDR

71243004 WORLD COMMERCE PLACE Fort Bonifacio Global City ,

Taguig City MM 1634

Philippines Q4 2015 4,620 mn Pesos

66996004 ARTHALAND TOWER Bonifacio Global City , Taguig City MM 1634

Philippines Q4 2015 3,500 mn Pesos

65796007 NEW TERRITORIES WEST REGIONAL OFFICE & WA-TER RESOURCES EDUCATION CENTRE OF WATER SUPPLIES DEPARTMENT

Yuen Long District, New Territo-ries

Hong Kong Sep 2015 800 mn HK$

64685007 NKIL 6311 OFFICE DEVELOPMENT Kwun Tong District, Kowloon Hong Kong Oct 2015 908 mn HK$

47826011 TOPAZ CITY (PHASE 2) - DISTRICT 8) District 8, Ho Chi Minh Vietnam Oct 2015 2,773,250 mn VND

42535011 POLITICAL - ADMINISTRATIVE CENTRE OF SON TINH DISTRICT (NEW) - QUANG NGAI

Son Tinh District, Quang Ngai Vietnam Oct 2015 173,000 mn VND

Page 9: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS INDUSTRIAL IN INDONESIA (BILLION IDR)

- 32%

- 4%

+ 87%

+ 14%

1638

4168

35543968

29682492

567

15592

1796

10847

1054

963

2367

31613257

6032

7538

2867

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location

Country

(project loca-

tion)

Construction

start date Project value

17837006 WAREHOUSE - new - 7 storey Singapore Singapore Sep 2015 33 mn SGD

18209006 LAUNCHPAD@ONE-NORTH (PHASE 2) Singapore Singapore Q4 2015 27 mn SGD

69366008 DAIKIN INDUSTRIES (THAILAND) CO LTD FAC-TORY

Amphur Muang, Chonburi 20000 Thailand Q4 2015 481 mn Baht

69369008 THAI KOKOKU RUBBER CO LTD FACTORY Amphur Nongkae, Saraburi 18230 Thailand Q4 2015 908 mn Baht

51588003 CENTRAL LIGHT INDUSTRIAL PARK (PHASE 2) Penang Malaysia Sep 2015 18 mn RM

54946003 AYSM PROPERTIES: NOUVELLE INDUSTRIAL PARK AT KOTA PUTERI

Selangor Malaysia Q4 2015 40 mn RM

137556002 DAIWA HOUSE INDUSTRY CENTRAL LOGIS-TICS

Bekasi, Greater Jakarta Indonesia Sep 2015 250 bn IDR

124415002 HITACHI TRANSPORT SYSTEM INDONESIA - CIKARANG

Bekasi, Greater Jakarta Indonesia Sep 2015 150 bn IDR

72103004 WAREHOUSE - new - 10 storey Brgy Tondo South , Manila 1012 Philippines Sep 2015 688 mn Pesos

61641004 METAL FABRICATION FACILITY - new - single storey

Cabuyao City , Laguna 4025 Philippines Oct 2015 400 mn Pesos

68480007 EU YAN SANG CHINESE MEDICINE PLANT Yuen Long District, New Territories Hong Kong Q4 2015 700 mn HK$

52765011 XUAN THANH CEMENT PLANT (PHASE 2) - HA NAM

Thanh Liem District, Ha Nam Vietnam Sep 2015 850,000 mn VND

Page 10: View Forecaster

INDONESIA

FORECAST REVIEW

Short term review

Long term review

Short term forecast

Long term forecast

Major projects commencing construction September 2015 - November 2015 in Indonesia and the region:

SEPTEMBER 2015 - NOVEMBER 2015

Source of construction start values and projects: BCI Database as of 1 September 2015

Jun. 2015 - Aug. 2015 vs.

Mar. 2015 - May 2015

Sep. 2014 - Aug. 2015 vs.

Sep. 2013 - Aug. 2014

Sep. 2015 - Nov. 2015 vs.

Jun. 2015 - Aug. 2015

Dec. 2014 - Nov. 2015 vs.

Dec. 2013 - Nov. 2014

TOTAL CONSTRUCTION STARTS RETAIL & HOSPITALITY IN INDONESIA (BILLION IDR)

Short term review

- 22%

- 23%

- 38%

- 28%

6758

6504

47564590

3266

2680

41614014

3834

5317

4109

4738

4341

3133 3625

3709

2266

866

0

1000

2000

3000

4000

5000

6000

7000

8000

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Total Public Private

PID Project name Project location Country (project

location)

Construction

start date Project value

18780006 COMPASS POINT Singapore Singapore Q4 2015 30 mn SGD

15549006 IMALL Singapore Singapore Q4 2015 90.00 mn SGD

50569008 SINGHA COMPLEX (SINGHA CORPORATION GROUP)

Khet Wattana, Bangkok 10110 Thailand Q4 2015 780 mn Baht

56462008 MABOONKRONG, PATHUM THANI Amphur Muang, Pathum Thani

12000

Thailand Q4 2015 3,200 mn Baht

57898003 ATLANTIS RESIDENCE @ KOTA LAKSAMANA Malacca Malaysia Q4 2015 550 mn RM

55211003 JADE PALACE: PHASE F1-B Johor Bahru Malaysia Oct 2015 306 mn RM

101210002 SOLO DOWNTOWN - HARRIS HOTEL (4 STARS) Surakarta, Central Java Indonesia Sep 2015 65 bn IDR

124529002 RADISSON HOTEL (4 STARS) - ULUWATU Badung, Bali Indonesia Sep 2015 56 bn IDR

64408004 STARMALL PRIMA NORTH MOLINO Bacoor City , Cavite 4102 Philippines Sep 2015 3,150 mn Pesos

60588004 STARMALL NAGA Naga City , Camarines Sur 4400 Philippines Sep 2015 2,000 mn Pesos

63419007 WAI MAN ROAD, SAI KUNG HOTEL Sai Kung District, New Territories Hong Kong Q3 2015 1,040 mn HK$

68447007 MTR HEADQUARTERS BUILDING AND TEL-FORD PLAZA II

Kwun Tong District, Kowloon Hong Kong Q3 2015 100 mn HK$

48100011 VIEN DONG PHU QUOC RESORT - KIEN GIANG Phu Quoc District, Kien Giang Vietnam Oct 2015 177,000 mn VND

16548011 KINGSTON RESIDENCE - PHU NHUAN DIS-TRICT

Phu Nhuan District, Ho Chi Minh Vietnam Sep 2015 296,130 mn VND

Page 11: View Forecaster

sia is a mem er of the roup of ompanies the leading group of construction information services in the sia - acific region. very year roup researches well over uilding and construction projects in all stages of devel opment from early concept design to construction. ridges a critical information gap in the construction market. or uil d ing material suppliers contractors and su contractors is the indispensi le source of project leads and market intelli gence. eanwhile for developers and architects is a critical liaison to new sources of products and services availa le in the market. o other service in sia enjoys ’s pre-eminent reputation for providing actiona le information and increasing sales efficiency.

T sia offers a portfolio of online real-time project leads services that can e custom-tailored to its clients’ requirements

BCI EADFI DE is ’s state -of-the-art project leads system. very single week the sia research team feeds in excess of new projects or project updates into the data ase that the ead inder accesses. very project entered into ’s comprehensive research data ase has to meet ’s stringent quality criteria

ach project report has to e personally verified y a researcher.

ach project has to feature at least one contact with full contact details for follow-up.

ach project has to contain contracts yet to e awarded.

BCI EAD A AGE is ’s flagship information service. s an industry-leading project leads service the ead anager comes with a highly useful and completely intuitive front-end ena ling the user to manage oth projects and contacts efficiently. ales managers can manage their sales team and monitor their sales opportunities effectively. BCI C IE IAI E ICE is the ’ uilt-in’ support that is part and parcel of every information service. usiness evelopment anagers go out of their way to fully understand the specific needs and requirements of a prospective client. ccount anagers then spend all the time necessary to adjust a host of individual system settings to the client’s requirements making sure all the client’s o jectives are met. lient iaison consultant team ensures each user is comprehensively inducted and up-trained on an ongoing asis.

T

Page 12: View Forecaster

Disclaimer:

Information contained in each report is current as at the first of the specified month. This information has been prepared without taking your specific needs or objec-

tives into account. Because of this you should consider its appropriateness with regard to your objectives and needs before acting on this information. Construction

forecast information may change due to unforeseeable outside influences affecting the construction industry. While this report has been prepared with the utmost

care and confidence, BCI Asia does not warrant the accuracy or completeness of the information contained herein, and accepts no, and disclaims all, liability for any

loss or damage whether occasioned by reliance on such information or otherwise. The information is subject to change without notice and BCI Asia is under no

obligation to update the information or correct any inaccuracy which may become apparent at a later date.

ABOUT BCI ECONOMICS BCI Economics represents the forecasting, custom research and consultancy arm of BCI Group. BCI Economics was developed

to leverage ’s extensive empirical knowledge of the construction market. With over projects researched and reported

annually ’s capacity to predict the short and medium term future of the construction markets is unmatched.

ONE-OFF CONSTRUCTION MARKET RESEARCH REPORTS are published by BCI ad-hoc from time to time, based on

current fiscal and demand developments (e.g. the BER Report, Construction in the Health Sector and Infrastructure Re-

ports).

BCI CUSTOM RESEARCH AND CONSULTANCY SERVICES has the ability to cater to a wide spectrum of research topics

and management reports to providers of building products and services. From market share and distribution-chain analysis

to market entrance and brand-awareness studies, BCI Asia has helped some of the largest and most intelligent companies

in construction to understand their markets, their customers and their competitive environment. Tell us your goals and we

will help you score them.

ABOUT BCI SERVICES

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

BCI FORECASTER August rolling 3 month review rolling 3 month forecast

BCI FORECASTER September rolling 3 month review rolling 3 month forecast

BCI FORECASTER October rolling 3 month review rolling 3 month forecast

BCI FORECASTER November rolling 3 month review rolling 3 month forecast

BCI FORECASTER December rolling 3 month review rolling 3 month forecast

...

BCI Economics offers a variety of services designed to complement its core project leads reporting service:

PERIODIC CONSTRUCTION FORECASTS are an integral element of ’s mem er services and an important aid in helping

decision makers anticipate critical changes in market demand:

BCI FORECASTER is a monthly rolling-three-month forecast and review of construction starts [as measured in their Dollar

value], contrasted against the prior three months and the corresponding twelve months in the prior year. To enhance this

data sample projects shaping the market in the region are displayed. The Forecaster serves as an effective short term sales

and operations planning and controlling tool.