VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 203, VNA8 Building, 08 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 1
VIETNAM POWER RESOURCE PARTNERS CORPORATION
Hanoi - 2019
Preparation Development Execution O&MCOD-Ready
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 2
GENERAL INFORMATION
Vietnam Power Resource Partners Corporation (Vietnam PRP)
Representative: Mr. Tran Anh Thai Role: General Director
Cellphone: + 84(0) 913.201.168 Email: [email protected]
Address: Room 703, No. 11 Tran Hung Dao St., Hoan Kiem Dist., Hanoi,
Vietnam
Tel : +84 (0) 43.8259620 Fax : +84 (0) 43.8259628
Email : [email protected] Website: www.vietnamprp.com
LEGAL DOCUMENT
Business registration certificate: No. 0103014136
Electricity activity license: No. 22/GP-ĐTĐL
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 3
INTERPRETATION
- ERAV: Electricity Regulatory Authority of Vietnam
- EVN: Vietnam Electricity
- EPTC: Electric Power Trading Company
- MOIT: Ministry of Industry and Trade
- NPT: National Power Transmission Corporation
- NLDC: National Load Dispatch Centre (A0)
- NRLDC: Northern Regional Load Dispatch Center (A1)
- SRLDC: Southern Regional Load Dispatch Center (A2)
- CRLDC: Central Regional Load Dispatch Center (A3)
- PTC1: Power Transmission Company No 1
- PTC2: Power Transmission Company No 2
- PTC3: Power Transmission Company No 3
- PTC4: Power Transmission Company No 4
- PCs: Distribution Companies
- MDMSP: Metering Data Management Service Provider
- SMO: System and Market Operator
- SCADA/EMS: Supervisory Control And Data Acquisition/Energy
Management System
- PPA: Power Purchase Agreement
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 4
INTRODUCTION
VIETNAM POWER RESOURCE PARTNERS CORPORATION (PRP) is a
Vietnam-based Company established by the Registration No. 0103014136
issued by Planning and Investment Department of People Committee of Hanoi).
PRP was licensed by the Electricity Regulatory Authority of Vietnam under
license number 22/GP-DTDL dated 02nd March 2011.
Our professional activities encompass a significant number of areas in the
Vietnam Power Sector such as:
Power System Analysis:
- Evaluate the necessity of new transmission lines, substations;
- Grid Connection Impact Study
- Real-time Analysis of power system
- Optimal power flow (OPF) and optimal switching
Basic Design and Technical Design of 500kV line and substation;
Power Plant Evaluation and Operation (which is under planning to
construction phases and under operation phase);
Construction Investment Preparation, Design, Bidding, Construction
Supervision of up to 220kV line and substation;
Construction Investment Preparation, Design, Bidding, Construction
Supervision of up to 30MW hydropower plant
Other Consultancy areas:
- Consultant in Power Purchase Agreement (PPA) for power plant
projects;
- Advising on Licensing Power Operation;
- Consultant in Power Market Trading;
- Designer and Technical Assistant in Communication, SCADA,
Metering and Protection systems;
- Relay setting calculation;….
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 5
Our advantages are:
Unique Networking with Ex. High Ranking Officers in Vietnam Power
Sector;
Unique Expertise with long experienced Principals and License upto
500kV;
Unique Database with Historian, Current and Future Data warehouse of
Vietnam Power Sector;
Professional tools with PSS/E, PSS/ODMS, QuickStab, DigSilent,
Quantrix,...
PRP brings you strategic thinking, superior system operation expertise,
business insight and leadership to become an integral part of your Resource.
PRP with a team of experienced and talent Power Engineering engineers, and
with the deep understanding and experiences in Vietnam Power Sector, is
adding, through our services, values to your Resources.
Having PRP advantages your Resources would go beyond Stakeholders’
Expectation.
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 6
WORK EXPERIENCES
PRP’s Main Project Reference List:
1. Cat Hiep Solar Power project (49.5MWp) .............................................. 9
2. BIM3 Solar Power project (50MWp) ....................................................... 9
3. Song Giang Hydropower plant project (49MW) .................................... 10
4. Soc Son biomass thermal power plant project (75MW) ............................. 11
5. Huong Tan Wind Power Plant project (48MW) .......................................... 11
6. Lien Lap Wind Power Plant project (48MW) .............................................. 12
7. Tan Linh Wind Power Plant project (48MW) .............................................. 13
8. Tay Nguyen Wind Power Plant project (28.8MW) ..................................... 13
9. Phuoc Huu Solar Power Plant project (65MWp) ........................................ 14
10. Song Luy Solar Power Plant project (39MW) ......................................... 15
11. Loc Ninh 1 Solar Power Plant project (200MWp) ................................... 15
12. Loc Ninh 2 Solar Power Plant project (200MWp) ................................... 16
13. Loc Ninh 3 Solar Power Plant project (150MWp) ................................... 17
14. Loc Ninh 4 Solar Power Plant project (200MWp) ................................... 17
15. Loc Ninh 5 Solar Power Plant project (50MWp) ..................................... 18
16. Nexif Ben Tre Wind Power project (Phase 1:30MW and Phase 2: 30MW) 19
17. Da Mi floating Solar Power Plant project (50MWp) ................................ 21
18. BIM2 Solar Power project (250MWp) ............................................... 21
19. Phuoc Trung Solar Power project (50MWp) ..................................... 22
20. Ham Kiem Solar Power project (49MWp) ......................................... 23
21. My Son 1 Solar Power project (50MW) ............................................. 23
22. Xuan Tho 1 Solar Power Plant project (49MWp) .................................... 25
23. Xuan Tho 2 Solar Power Plant project (49MWp) .................................... 26
24. Rung Xanh Solar Power Plant project (150MWp) .................................. 27
25. Phuong Mai 3 Wind Power project (21MW) ........................................... 28
26. CMX RE-SUNSEAP Solar Power Plant project (168MW) ...................... 29
27. Da Bac Solar Power Plant project (48MW) ............................................ 30
28. Da Bac 2 Solar Power Plant project (48MW) ......................................... 31
29. The 220kV Da Bac substation of Da Bac and Da Bac 2 Solar Power Plant project (2x63MVA) ........................................................................................... 32
30. Dam Nai Wind Power project (40MW) .................................................... 33
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 7
31. Mong Duong 2 thermal power plant project (1200MW) .......................... 34
32. Mong Duong 2 Thermal Power Plant project - Technical design (1200MW) ........................................................................................................ 36
33. Nhon Trach 2 Gas turbine power plant project (750MW) ....................... 36
34. Thang Long thermal power plant project (600MW) ................................ 39
35. Thai Binh 1 Thermal Power Plant project (600MW) ............................... 41
36. Song Hau 1 Thermal Power Plant project (2x600MW) ........................... 42
37. Nghi Son 1 Thermal Power Plant project (600MW) ................................ 43
38. Hoa Thuan hydropower plant project ..................................................... 43
39. Coc San hydropower plant project (Phase 1) ......................................... 45
40. Coc San hydropower plant project (Phase 2) ......................................... 46
41. Ngoi Phat hydropower plant project ....................................................... 46
42. Nam Gion hydropower plant project ....................................................... 47
43. Nam Hong 1 hydropower plant project ................................................... 48
44. Song Bac hydropower plant project ........................................................ 49
45. Lower Se San 2 - Hydro power plant project .......................................... 50
46. An Khanh 1 Thermal Power plant project ............................................... 51
47. Ta Lang hydro power plant project ......................................................... 51
48. Guang Lian Steel Cogeneration Plant project ........................................ 53
49. The 110kV Bac Song Cam substation project (Phase 1) ....................... 54
50. The 110kV Bac Song Cam substation project (Phase 2) ....................... 55
51. The 110kV Bridgestone substation project ............................................. 56
52. The 110kV Nui Phao substation project ................................................. 57
53. The 110kV Veam substation project ....................................................... 57
54. The 110kV Ton Hoa Sen substation project ........................................... 58
55. Technical Assistant project: ERAV Support Information Technology/Database: System Design and Training project ............................ 60
56. Transmission charges calculation model development, data collection and calculation project ..................................................................................... 61
57. Information Infrastructure for the Power Market in Vietnam project........ 62
58. SCADA and metering system for Khanh Hoa power company project ... 63
59. Mini SCADA for Bac Ninh Power Company project ................................ 64
60. SCADA system for NLDC project ........................................................... 65
61. SCADA system for SRLDC project ......................................................... 66
62. SCADA system for NPT project .............................................................. 67
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 8
63. Monitoring Operations of the Pilot and Full VCGM project ..................... 67
64. Data for Research Power Generation Market in Vietnam project ........... 68
65. EVNNPT Information Technology Roadmap project .............................. 69
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 9
1. Cat Hiep Solar Power project (49.5MWp)
Assignment Name:
Technical Agreements Consulting Service
for Cat Hiep Solar Power Plant project
(49.5MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: Binh Dinh TTP Energy and
high technology., JSC
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 04/2019
Completion Date: 06/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Calculating the capacitor volume.
- Preparing the Procedure on cooperation of plant operation
- Participating in Relay setting calculation
- Grid Impact Study
- Advising on Licensing Power Operation
- Prepare profile for the official commercial operation date.
Description of Actual Services Provided by Your Staff within the assignment: N/A
2. BIM3 Solar Power project (50MWp)
Assignment Name:
Technical Agreements Consulting Service
for Bim3 Solar Power Plant project (50MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: BIM RENEWABLE
ENERGY JOINT STOCK COMPANY
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 10
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Calculating the capacitor volume.
- Preparing the Procedure on cooperation of plant operation
- Participating in Relay setting calculation
- Grid Impact Study
- Advising on Licensing Power Operation
- Prepare profile for the official commercial operation date.
Description of Actual Services Provided by Your Staff within the assignment: N/A
3. Song Giang Hydropower plant project (49MW)
Assignment Name:
Technical Agreements Consulting Service
for Song Giang Hydropower plant project
(49MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Khanh Hoa
province
Duration of Assignment (months): 06 weeks
Name of Client: Nexif Energy Management
Pte Ltd
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 04/2019
Completion Date: 05/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Grid Impact Study
- Support contract negotiation
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 11
4. Soc Son biomass thermal power plant project (75MW)
Assignment Name:
Technical Agreements Consulting Service
for Soc Son biomass thermal Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ha Noi province
Duration of Assignment (months): 08 weeks
Name of Client: Ha Noi Thien Y
Environmental Energy Joint Stock
Company
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 03/2019
Completion Date: 05/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
Description of Actual Services Provided by Your Staff within the assignment: N/A
5. Huong Tan Wind Power Plant project (48MW)
Assignment Name:
Technical Agreements Consulting Service
for Huong Tan Wind Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Quang Tri
province
Duration of Assignment (months): 08 weeks
Name of Client: Phu Dien Construction
Investment And Trading Joint Stock
Company
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 12
Start Date: 03/2019
Completion Date: 05/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation Power Purchase Agreement (PPA) and negotiation with EVN
Description of Actual Services Provided by Your Staff within the assignment: N/A
6. Lien Lap Wind Power Plant project (48MW)
Assignment Name:
Technical Agreements Consulting Service
for Lien Lap Wind Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Quang Tri
province
Duration of Assignment (months): 08 weeks
Name of Client: Phu Dien Construction
Investment And Trading Joint Stock
Company
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 03/2019
Completion Date: 05/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 13
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation Power Purchase Agreement (PPA) and negotiation with EVN
Description of Actual Services Provided by Your Staff within the assignment: N/A
7. Tan Linh Wind Power Plant project (48MW)
Assignment Name:
Technical Agreements Consulting Service
for Tan Linh Wind Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Quang Tri
province
Duration of Assignment (months): 08 weeks
Name of Client: Phu Dien Construction
Investment And Trading Joint Stock
Company
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 03/2019
Completion Date: 05/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation Power Purchase Agreement (PPA) and negotiation with EVN
Description of Actual Services Provided by Your Staff within the assignment: N/A
8. Tay Nguyen Wind Power Plant project (28.8MW)
Assignment Name:
Relay setting calculation for Tay Nguyen
Wind Power Plant project (28.8MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam Duration of Assignment (months): 08 week
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 14
Location within Country: DakLak province
Name of Client: HBRE POWER Total No of Staff-months of the assignment:
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 01, 2019
Completion Date: 03, 2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Grid impact study
- Relay setting calculation
- COD support
Description of Actual Services Provided by Your Staff within the assignment: N/A
9. Phuoc Huu Solar Power Plant project (65MWp)
Assignment Name:
Relay setting calculation for Phuoc Huu
Solar Power Plant project (65MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binhthuan
province
Duration of Assignment (months): 08 week
Name of Client: ATSJSC Total No of Staff-months of the assignment:
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 11, 2018
Completion Date: 01, 2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Grid impact study
- Relay setting calculation
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 15
Description of Actual Services Provided by Your Staff within the assignment: N/A
10. Song Luy Solar Power Plant project (39MW)
Assignment Name:
Relay setting calculation for Song Luy
Power Plant project (39MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: DakLak province
Duration of Assignment (months): 08 week
Name of Client: B-SOLAR Total No of Staff-months of the assignment:
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 01, 2019
Completion Date: 03, 2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Grid impact study
- Relay setting calculation
Description of Actual Services Provided by Your Staff within the assignment: N/A
11. Loc Ninh 1 Solar Power Plant project (200MWp)
Assignment Name:
Technical Agreements Consulting Service
for Loc Ninh 1 Solar Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Phuoc
province
Duration of Assignment (months): 06 weeks
Name of Client: Loc Ninh 1 power JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 16
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
Description of Actual Services Provided by Your Staff within the assignment: N/A
12. Loc Ninh 2 Solar Power Plant project (200MWp)
Assignment Name:
Technical Agreements Consulting Service
for Loc Ninh 2 Solar Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Phuoc
province
Duration of Assignment (months): 06 weeks
Name of Client: Loc Ninh 2 power JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 17
13. Loc Ninh 3 Solar Power Plant project (150MWp)
Assignment Name:
Technical Agreements Consulting Service
for Loc Ninh 3 Solar Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Phuoc
province
Duration of Assignment (months): 06 weeks
Name of Client: Loc Ninh 3 power JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
Description of Actual Services Provided by Your Staff within the assignment: N/A
14. Loc Ninh 4 Solar Power Plant project (200MWp)
Assignment Name:
Technical Agreements Consulting Service
for Loc Ninh 4 Solar Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Phuoc
province
Duration of Assignment (months): 06 weeks
Name of Client: Loc Ninh 4 power JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 18
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
Description of Actual Services Provided by Your Staff within the assignment: N/A
15. Loc Ninh 5 Solar Power Plant project (50MWp)
Assignment Name:
Technical Agreements Consulting Service
for Loc Ninh 5 Solar Power Plant project
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Phuoc
province
Duration of Assignment (months): 06 weeks
Name of Client: Loc Ninh 5 power JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 19
Description of Actual Services Provided by Your Staff within the assignment: N/A
16. Nexif Ben Tre Wind Power project (Phase 1:30MW and Phase 2: 30MW)
Assignment Name:
Feasibility Study and Basic Design and
Technical Agreements Consulting Service
for Nexif Ben Tre Wind Power Plant project
(Phase 1: 30MW and Phase 2: 30MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ben Tre province
Duration of Assignment (months): 06 weeks
Name of Client: NEXIF ENERGY BEN TRE
CO., LTD
Total No of Staff-months of the assignment:
N/A
Address: Unit 1409, 14th Floor, Cornerstone
Building, 16 Phan Chu Chinh, Hoan Kiem,
Hanoi, Vietnam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start: Date:
- Phase 1: 07/2018
- Phase 2: 02/2019
Completion Date:
- Phase 1: 01/2019
- Phase 2: 06/2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Survey for preparation of fs & basic design and general layout 1/500:
o Topography survey
o Geology investigation survey
o Hydrology survey
- Preparation and Acquirement of Agreements from EVN
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
o Power Purchase Agreement (PPA)
- Preparation and Acquirement of Agreements/approvals from relevant authorities for
Feasibility Study.
o Agreement on Power Purchase from local MV system
o Agreement on Firefighting System
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 20
o Agreement on Tie Line Right-of-Way
o Agreement on Entrance Route and water supply
o Approval letter (or decision) on approve general layout 1/500
- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;
Wind Power Plant part:
o Feasibility Study Report Preparation
o Basic Design Preparation
o Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 21
17. Da Mi floating Solar Power Plant project (50MWp)
Assignment Name:
COD service consultant for Da Mi floating
Solar Power Plant project (50MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: ATS JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Calculating the capacitor volume.
- Preparing the Procedure on cooperation of plant operation
- Participating in Relay setting calculation
- Grid Impact Study
- Advising on Licensing Power Operation
- Prepare profile for the official commercial operation date.
Description of Actual Services Provided by Your Staff within the assignment: N/A
18. BIM2 Solar Power project (250MWp)
Assignment Name:
Technical Agreements Consulting Service
for Bim2 Solar Power Plant project
(250MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: ATS JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 22
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Calculating the capacitor volume.
- Preparing the Procedure on cooperation of plant operation
- Participating in Relay setting calculation
- Grid Impact Study
- Advising on Licensing Power Operation
- Prepare profile for the official commercial operation date.
Description of Actual Services Provided by Your Staff within the assignment: N/A
19. Phuoc Trung Solar Power project (50MWp)
Assignment Name:
Technical Agreements Consulting Service
for Phuoc Trung Solar Power Plant project
(49MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: SAVINA POWER JSC Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Design for 22/220kV – 50MVA substation and double line of Phuoc Trung Solar power plant.
- Grid Impact Study for Phuoc Trung Solar power plant.
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 23
20. Ham Kiem Solar Power project (49MWp)
Assignment Name:
Technical Agreements Consulting Service
for Ham Kien Solar Power Plant project
(49MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: BG Energy Solution
Company Limited
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Technical Due Diligence
- Grid Impact Study
- Support for negotiating EPC contract
Description of Actual Services Provided by Your Staff within the assignment: N/A
21. My Son 1 Solar Power project (50MW)
Assignment Name:
Technical Agreements Consulting Service
for My Son 1 Solar Power Plant project
(50MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: BG Energy Solution
Company Limited
Total No of Staff-months of the assignment:
N/A
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 08/2018
Completion Date: 09/2018
No of professional Staff-Months provided by
associated consultants: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 24
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Technical Due Diligence
- Grid Impact Study
- The review of Design Consultant Contracts
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 25
22. Xuan Tho 1 Solar Power Plant project (49MWp)
Assignment Name:
Feasibility Study and Technical Agreements
Consulting Service for Xuan Tho 1 Solar
Power Plant project (49MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Phu Yen
province
Duration of Assignment (months): 06 weeks
Name of Client: Nam Viet Hung Investment
Corp.
Total No of Staff-months of the assignment:
N/A
Address: No. 84 Street 11, Quarter 5, Linh
Xuan Ward, Thu Duc District, Ho Chi Minh
City
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 06/2018
Completion Date: 08/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation and Acquirement of Agreements/approvals from relevant authorities for
Feasibility Study.
o Agreement on Power Purchase from local MV system
o Agreement on Firefighting System
o Agreement on Tie Line Right-of-Way
o Agreement on Entrance Route and water supply
- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;
Solar Power Plant part:
o Feasibility Study Report Preparation
o Basic Design Preparation
o Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 26
23. Xuan Tho 2 Solar Power Plant project (49MWp)
Assignment Name:
Feasibility Study and Technical Agreements
Consulting Service for Xuan Tho 2 Solar
Power Plant project (49MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Phu Yen
province
Duration of Assignment (months): 06 weeks
Name of Client: Nam Viet Hung Investment
Corp.
Total No of Staff-months of the assignment:
N/A
Address: No. 84 Street 11, Quarter 5, Linh
Xuan Ward, Thu Duc District, Ho Chi Minh
City
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 06/2018
Completion Date: 08/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation and Acquirement of Agreements/approvals from relevant authorities for
Feasibility Study.
o Agreement on Power Purchase from local MV system
o Agreement on Firefighting System
o Agreement on Tie Line Right-of-Way
o Agreement on Entrance Route and water supply
- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;
Solar Power Plant part:
o Feasibility Study Report Preparation
o Basic Design Preparation
o Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 27
24. Rung Xanh Solar Power Plant project (150MWp)
Assignment Name:
Grid Impact Study for Rung Xanh Solar
Power Plant project (150MWp)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Dak Lak province
Duration of Assignment (months): 06 weeks
Name of Client: Dak Lak Produce Forestry
and Food Processing Company Limited
Total No of Staff-months of the assignment:
N/A
Address: Ea Sup District, Dak Lak Province Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 06/2018
Completion Date: 06/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Contingency analysis
o Short circuit studies
- Considering the factors affecting the power plant connection to local grid based on
operation standards of Vietnam
- Considering the stability of Rung Xanh and connection grid.
- Considering the capability of supplying power of Rung Xanh in the calculation
scenarios.
- Offering the appropriate recommendations for Dak Lak Forestry Co.Ltd on this project,
including on grid availability and potential curtailment from EVN
- Preparing the final grid impact study report for submitting to Dak Lak Forestry Co.Ltd.
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 28
25. Phuong Mai 3 Wind Power project (21MW)
Assignment Name:
Feasibility Study and Basic Design and
Technical Agreements Consulting Service
for Phuong Mai 3 Wind Power Plant project
(21MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Binh Dinh
province
Duration of Assignment (months): 06 weeks
Name of Client: Central Wind-Power
Investment & Development Co.
(CENWINDCO)
Total No of Staff-months of the assignment:
N/A
Address: 31 Nguyen Cong Tru, Le Hong
Phong Ward, Quy Nhon City, Binh Dinh
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 03/2017
Completion Date: 06/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN
o Preliminary Agreement on Power Purchasing
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
o Power Purchase Agreement
- Preparation and Acquirement of Agreements/approvals from relevant authorities for
Feasibility Study.
o Agreement on Power Purchase from local MV system
o Agreement on Firefighting System
o Agreement on Tie Line Right-of-Way
o Agreement on Entrance Route and water supply
- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;
Wind Power Plant part:
o Feasibility Study Report Preparation
o Basic Design Preparation
o Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 29
26. CMX RE-SUNSEAP Solar Power Plant project (168MW)
Assignment Name:
Feasibility Study and Technical Agreements
Consulting Service for CMX RE Solar
Power Plant project (168MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: SUNSEAP Group (CMX
RE CMX-SUNSEAP Vietnam Solar Power
Joint Stock Company)
Total No of Staff-months of the assignment:
N/A
Address: Tan My Hamlet, My Son
Commune, Ninh Son District, Ninh Thuan
Province, Vietnam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 12/2017
Completion Date: 04/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:
o Grid Impact Study and and Agreement on Grid Connection
o Agreement on Tariff Metering System
o Agreement on Relay Protection and Automation System
o Agreement on SCADA and Telecommunication System
- Preparation and Acquirement of Agreements/approvals from relevant authorities for
Feasibility Study.
o Agreement on Technical Design of Grid Connection Points
o Agreement on Power Purchase from local MV system
o Agreement on Firefighting System
o Agreement on Tie Line Right-of-Way
o Agreement on Entrance Route and water supply
- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;
Solar Power Plant part:
o Feasibility Study Report Preparation
o Basic Design Preparation
o Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 30
27. Da Bac Solar Power Plant project (48MW)
Assignment Name:
Technical Agreements Consulting Service
for Da Bac Solar Power Plant project
(48MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ba Ria – Vung
Tau province
Duration of Assignment (months): 06 weeks
Name of Client: Dong A Joint Stock
Company
Total No of Staff-months of the assignment:
N/A
Address: Binh Hoa district, Thuan An ward,
Bình Duong province, Viet Nam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 1/2018
Completion Date: 03/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation of dossier and support Client in getting the approval of Preliminary
Agreement on Power Purchasing
- Grid Impact Study and Preparation of dossier and support Client in getting the approval
of Agreement on Grid Connection
- Preparation of dossier and support Client in getting the approval of Agreement on Grid
Connection
- Preparation of dossier and support Client in getting the approval of Agreement on Tariff
Metering System
- Preparation of dossier and support Client in getting the approval of Agreement on Relay
Protection and Automation System
- Preparation of dossier and support Client in getting the approval of Agreement on
SCADA and Telecommunication System
- Prepare the PPA and support Client in the negotiation dossier of PPA
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 31
28. Da Bac 2 Solar Power Plant project (48MW)
Assignment Name:
Technical Agreements Consulting Service
for Da Bac 2 Solar Power Plant project
(48MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ba Ria – Vung
Tau province
Duration of Assignment (months): 06 weeks
Name of Client: Tai Tien Co.,Ltd Total No of Staff-months of the assignment:
N/A
Address: Dong Nhat ward, Bien Hoa city,
Dong Nai province, Viet Nam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 1/2018
Completion Date: 03/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Preparation of dossier and support Client in getting the approval of Preliminary
Agreement on Power Purchasing
- Grid Impact Study and Preparation of dossier and support Client in getting the approval
of Agreement on Grid Connection
- Preparation of dossier and support Client in getting the approval of Agreement on Grid
Connection
- Preparation of dossier and support Client in getting the approval of Agreement on Tariff
Metering System
- Preparation of dossier and support Client in getting the approval of Agreement on Relay
Protection and Automation System
- Preparation of dossier and support Client in getting the approval of Agreement on
SCADA and Telecommunication System
- Prepare the PPA and support Client in the negotiation dossier of PPA
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 32
29. The 220kV Da Bac substation of Da Bac and Da Bac 2 Solar Power Plant project (2x63MVA)
Assignment Name:
Technical Agreements Consulting Service
for the 220kV Da Bac substation and 220kV
transmission lines of Da Bac and Da Bac 2
Solar Power Plant projects
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ba Ria – Vung
Tau province
Duration of Assignment (months): 06 weeks
Name of Client: Tai Tien Co.,Ltd Total No of Staff-months of the assignment:
N/A
Address: Dong Nhat ward, Bien Hoa city,
Dong Nai province, Viet Nam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2/2018
Completion Date: 05/2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Basic Design of the 220kV Substation and 220kV Transmission lines part:
- Feasibility Study Report Preparation
- Basic Design Report Preparation
- Submission and presentation of FS to MOIT for Appraisal
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 33
30. Dam Nai Wind Power project (40MW)
Assignment Name:
Grid Impact Study for Dam Nai Wind
Power project (40MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ninh Thuan
province
Duration of Assignment (months): 06 weeks
Name of Client: Dam Nai Wind Power Joint
Stock Company
Total No of Staff-months of the assignment:
N/A
Address: Lang Me village, Bac Son hamlet,
Thuan Bac ward, Ninh Thuan province, Viet
Nam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2017
Completion Date: 2017
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Contingency analysis
o Short circuit studies
o Stability study
- Considering the factors affecting the power plant connection to local grid based on
operation standards of Vietnam
- Considering the stability of Dam Nai and connection grid.
- Considering the capability of supplying power of Dam Nai in the calculation scenarios.
- Offering the appropriate recommendations for Dam Nai Wind Power Joint Stock
Company on this project, including on grid availability and potential curtailment from
EVN load dispatch center (for seasons: dry or wet season)
- Preparing the final grid impact study report for submitting to Dam Nai Wind Power Joint
Stock Company.
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 34
31. Mong Duong 2 thermal power plant project (1200MW)
Assignment Name:
- 1st contract: Grid Impact Study for
Mong Duong 2 – 2x600MW
- 2nd contract: 1st Supplementary Grid
impact Study with installed capacity
increase to 2x700 MW
- 3rd contract: 2nd Supplementary Grid
impact study with new initial data to
reflect global crisis
Approx. Value of the contract (in current
US$):
- 1st contract: N/A
- 2nd contract: N/A
- 3rd contract: N/A
Country: Vietnam
Location within Country: Quang Ninh
province
Duration of Assignment (months):
- 1st contract: 2 months
- 2nd contract: 2 months
- 3rd contract: 3 months
Name of Client: AES-VCM Mong Duong
Power Company Limited
Total No of Staff-months of the assignment:
- 1st contract: 18 Staff-months
- 2nd contract: 18 Staff-months
- 3rd contract: 22 Staff-months
Address: 6 Nha Tho, Hoan Kiem, Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$):
- 1st contract: N/A
- 2nd contract: N/A
- 3rd contract: N/A
Start Date:
- 1st contract: 07th Jun, 2007
- 2nd contract: 15th May, 2008
- 3rd contract: 27th Dec, 2008
Completion Date:
- 1st contract: 07th Aug, 2007
- 2nd contract: 15th Jul, 2008
- 3rd contract: 30th Mar, 2009
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
N/A
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Mai Thanh Tung: Deputy Project
Manager
- Le Van Hoang: Technical Support
Narrative Description of Project: Works to be conducted:
- Data collection and update
- Connection scheme proposal
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 35
- Energy & power balance studies
- Load flow analysis
- Short circuit studies
- Dynamic stability studies
- Static stability studies
- Measuring system proposal
- SCADA/EMS connection proposal
- Communication solution proposal
- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS
connection with EVN and affiliates
Description of Actual Services Provided by Your Staff within the assignment:
- Data collection and update
o Updating commissioning schedules of 500kV, 220kV transmission grids of
Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The, Tran
Duc Minh Chau (in 3rd contract only)
o Updating power plant commissioning schedules for the period 2007-2025: Le
Van Hoang, Do Truong Giang, Le Quoc Anh
o Updating load demand and forecasting load demand for the period 2007-2025:
Nguyen Tuyen Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)
- Connection scheme proposal
o Alternative connection schemes: Tran Anh Thai, Le Van Hoang
- Energy & power balance studies:
o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)
o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)
- Load flow analysis
o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van
Hoang, Do Truong Giang, Tran Duc Minh Chau (in 3rd contract only)
o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le
Van Hoang, Do Truong Giang, Tran Duc Minh Chau (in 3rd contract only)
- Short circuit studies:
o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh
- Dynamic stability studies: Nguyen Tuyen Tam, Tran Duc Minh Chau (in 3rd contract
only)
- Static stability studies: Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)
- Measuring system proposal: Le Van Hoang, Do Truong Giang
- SCADA/EMS connection proposal:
o Protocol description, connection requirement and connection protocol: Tran
Anh Thai, Le Quoc Anh
- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The
- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 36
connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang
32. Mong Duong 2 Thermal Power Plant project - Technical design (1200MW)
Assignment Name:
Technical design and assist Doosan Vina in
Mong Duong 2 Thermal Power Project
(2x600MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Quang Ninh
province
Duration of Assignment (months): 13 months
Name of Client: Doosan Vina Total No of Staff-months of the assignment:
Address: Dung Quat Industrial Complex Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Nov, 2011
Completion Date: Dec, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Technical design of Metering System
- Technical design of Relay Protection System
- Technical design of SCADA System
- Technical design of Telecommunication System
- Sub-Synchronous Resonance (SSR) calculation for the Mong Duong 2
- Assist Doosan Vina in negotiation with EVN
Description of Actual Services Provided by Your Staff within the assignment:
33. Nhon Trach 2 Gas turbine power plant project (750MW)
Assignment Name:
Grid Impact Study and Analyze to reduce
short-circuit current in Nhon Trach 2 – 3x250
MW
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam Duration of Assignment (months): 2 months
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 37
Location within Country: Dong Nai
province
Name of Client: PetroVietnam Power
NhonTrach 2 Joint Stock Company
(PVPNT2)
Total No of Staff-months of the assignment:
18 Staff-months
Address: Hamlet 3, Phuoc Khanh
Commune, Nhon Trach District, Dong Nai
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date:
- Stage 1 - Grid Impact Study: 12th
Jul, 2007
- Stage 2 - Analyze to reduce short-
circuit current: 01st Nov, 2008
Completion Date:
- Stage 1 - Grid Impact Study: 31st
Aug, 2007
- Stage 2 - Analyze to reduce short-
circuit current: 15th Nov, 2008
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
N/A
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Mai Thanh Tung: Deputy Project
Manager
- Le Van Hoang: Technical Support
Narrative Description of Project: Works to be conducted:
- Data collection and update
- Connection scheme proposal
- Energy & power balance studies
- Load flow analysis
- Short circuit studies
- Dynamic stability studies
- Static stability studies
- Measuring system proposal
- SCADA/EMS connection proposal
- Communication solution proposal
- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS
connection with EVN and affiliates
- Analyze to reduce short-circuit current
Description of Actual Services Provided by Your Staff within the assignment:
- Data collection and update
o Updating commissioning schedules of 500kV, 220kV transmission grids of
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 38
Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The
o Updating power plant commissioning schedules for the period 2007-2025: Le
Van Hoang, Do Truong Giang, Le Quoc Anh
o Updating load demand and forecasting load demand for the period 2007-2025:
Nguyen Tuyen Tam, Tran Duc Ky
- Connection scheme proposal
o Alternative connection schemes: Tran Anh Thai, Le Van Hoang
- Energy & power balance studies:
o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
- Load flow analysis
o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van
Hoang, Do Truong Giang
o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le
Van Hoang, Do Truong Giang
- Short circuit studies:
o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh
- Dynamic stability studies: Nguyen Tuyen Tam
- Static stability studies: Tran Duc Ky
- Measuring system proposal: Le Van Hoang, Do Truong Giang
- SCADA/EMS connection proposal:
o Protocol description, connection requirement and connection protocol: Tran
Anh Thai, Le Quoc Anh
- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The
- Cooperate with PVPNT2 to reach agreement on connection, metering and SCADA/EMS
connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang
- Analyze to reduce short-circuit current: Tran Anh Thai, Le Van Hoang
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 39
34. Thang Long thermal power plant project (600MW)
Assignment Name:
- 1st contract: Grid Impact Study and
Technical design of SCADA and
metering system for Thang Long –
2x300 MW
- 2nd contract: Advising and
conducting negotiations for Power
Purchase Agreement (PPA)
Approx. Value of the contract (in current
US$):
- 1st contract: N/A
- 2nd contract: N/A
Country: Vietnam
Location within Country: Quang Ninh
province
Duration of Assignment (months):
- 1st contract: 4 months
- 2nd contract: 2007-2009
Name of Client: Thang Long Power Joint-
stock Company (TLP)
Total No of Staff-months of the assignment:
- 1st contract: 18 staff-months
- 2nd contract: 12 staff-months
Address: 64 Nguyen Luong Bang St., Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$):
- 1st contract: N/A
- 2nd contract: N/A
Start Date:
- 1st contract:
o Stage 1 - Grid Impact
Study: 31st Aug, 2007
o Stage 2 - Technical design
of SCADA and metering
system: 01st May, 2008
- 2nd contract: 08th Aug, 2008
Completion Date:
- 1st contract:
o Stage 1 - Grid Impact
Study: 31st Nov, 2007
o Stage 2 - Technical design
of SCADA and metering
system: 01st Jun, 2008
- 2nd contract: 2009
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
N/A
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Mai Thanh Tung: Deputy Project
Manager
- Le Van Hoang: Technical Support
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 40
Narrative Description of Project: Works to be conducted:
- Grid impact study:
o Data collection and update
o Connection scheme proposal
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
o Dynamic stability studies
o Static stability studies
o Measuring system proposal
o SCADA/EMS connection proposal
o Communication solution proposal
o Cooperate with TLP to reach agreement on connection, metering and
SCADA/EMS connection with EVN and affiliates
- Technical design of SCADA and metering system:
o Metering point
o Signal list
o Signal Chanel
o Communication connection
- Advising and conducting negotiations for Power Purchase Agreement (PPA)
o Drafting and preparing documents for PPA
o Regulations on Tariff studies of MOIT to apply for TLP
o Drafting Power Purchase Agreement (PPA)
o Preparing Appendix and Form relate to PPA
o Organizing Meetings and negotiating with EVN – EPTC to get Power Purchase
Agreement (PPA)
Description of Actual Services Provided by Your Staff within the assignment:
Grid impact Study:
- Data collection and update
o Updating commissioning schedules of 500kV, 220kV transmission grids of
Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The
o Updating power plant commissioning schedules for the period 2007-2025: Le
Van Hoang, Do Truong Giang, Le Quoc Anh
o Updating load demand and forecasting load demand for the period 2007-2025:
Nguyen Tuyen Tam, Tran Duc Ky
- Connection scheme proposal
o Alternative connection schemes: Tran Anh Thai, Le Van Hoang
- Energy & power balance studies:
o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 41
- Load flow analysis
o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van
Hoang, Do Truong Giang
o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le
Van Hoang, Do Truong Giang
- Short circuit studies:
o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh
- Dynamic stability studies: Nguyen Tuyen Tam
- Static stability studies: Tran Duc Ky
- Measuring system proposal: Le Van Hoang, Do Truong Giang
- SCADA/EMS connection proposal:
o Protocol description, connection requirement and connection protocol: Tran
Anh Thai, Le Quoc Anh
- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The
- Cooperate with TLP to reach agreement on connection, metering and SCADA/EMS
connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang
Technical design of SCADA and metering system:
o Metering point: Le Van Hoang, Do Truong Giang
o Signal list: Tran Anh Thai, Le Quoc Anh
o Signal Chanel: Tran Anh Thai, Le Quoc Anh
o Communication connection: Mai Thanh Tung, Nguyen Anh The
Advising and conducting negotiations for Power Purchase Agreement (PPA)
o Drafting and preparing documents for PPA: Tran Anh Thai, Le Van Hoang
o Regulations on Tariff studies of MOIT to apply for TLP: Tran Anh Thai, Mai
Thanh Tung, Le Van Hoang, Nguyen Anh The, Le Quoc Anh, Do Truong Giang,
Tran Duc Ky, Nguyen Tuyen Tam
o Drafting Power Purchase Agreement (PPA): Tran Anh Thai, Le Van Hoang,
Nguyen Anh The, Do Truong Giang
o Preparing Appendix and Form relate to PPA: Tran Anh Thai, Mai Thanh Tung,
Nguyen Tuyen Tam, Tran Duc Ky, Le Quoc Anh, Nguyen Tuyen Tam
o Organizing Meetings and negotiating with EVN – EPTC to get Power Purchase
Agreement (PPA): Tran Anh Thai, Le Van Hoang.
35. Thai Binh 1 Thermal Power Plant project (600MW)
Assignment Name:
Relay setting calculation for Thai Binh 1
Thermal Power Plant (2x300MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Thai Binh
province
Duration of Assignment (months): 05 months
Name of Client:
Contractor 1: Toshiba Vietnam
Total No of Staff-months of the assignment:
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 42
Contractor 2: FUJI
Contractor 3: Marubeni
Address: 44 Ly Thuong Kiet, Hoan Kiem,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: May, 2016
Completion Date: July, 2017
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis in year 2016 and year 2017
- Relay setting calculation for two 220kV lines
- Relay setting calculation for Generator Step-up Transformer
- Relay setting calculation for Station Transformer supplying auxiliary power
- Relay setting calculation for Generators
- Working with A0/A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
36. Song Hau 1 Thermal Power Plant project (2x600MW)
Assignment Name:
Relay setting calculation for Song Hau 1
Thermal Power Plant (2x600MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hau Giang
province
Duration of Assignment (months): 02 months
Name of Client: Petro Vietnam Song Hau
1 Power Project Management Broard -
Lilama
Total No of Staff-months of the assignment:
Address: Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Jan, 2019
Completion Date: March, 2019
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 43
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Technical design of Relay Protection System.
- Technical design of SCADA system and Telecommunication system.
Description of Actual Services Provided by Your Staff within the assignment: N/A
37. Nghi Son 1 Thermal Power Plant project (600MW)
Assignment Name:
Relay setting calculation for Nghi Son 1
Thermal Power Plant (2x300MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Thanh Hoa
province
Duration of Assignment (months): 05 months
Name of Client: Alstom Vietnam Total No of Staff-months of the assignment:
Address: 44 Ly Thuong Kiet, Hoan Kiem,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Apr, 2012
Completion Date: Sep, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis in year 2013 and year 2014
- Relay setting calculation for two lines 220kV Line Nghi Son 1 – Nghi Son Subs
- Relay setting calculation for 220kV Nghi Son 1 Substation
- Relay setting calculation for Generator Step-up Transformer
- Relay setting calculation for Station Transformer supplying auxiliary power
- Relay setting calculation for Generators
- Working with A0/A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
38. Hoa Thuan hydropower plant project
Assignment Name:
Technical Consultant services and Relay
setting calculation for Hoa Thuan
Approx. Value of the contract (in current
US$): N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 44
hydropower plant (17.4MW)
Country: Vietnam
Location within Country: Cao Bang
Duration of Assignment (months): 05 months
Name of Client: Hoa Thuan joint stock
company
Total No of Staff-months of the assignment:
N/A
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2017
Completion Date: 2018
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o Generators
o The Generator Step-up Transformers
o The 110kV busbar Hoa Thuan
o The 110kV lines from the power plant
- Supporting and getting the numbering equipment decision
- Preparing the Procedure on cooperation of plant operation
- Supporting training and certification of plant operators
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 45
39. Coc San hydropower plant project (Phase 1)
Assignment Name:
- 1st contract: Grid Impact Study
- 2nd contract: Electrical Engineering
Consultant Service
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Lao Cai
Duration of Assignment (months):
- 1st contract: 2 months
- 2nd contract: 5 months
Name of Client: Colben Energy (Vietnam)
Joint Stock Company
Total No of Staff-months of the assignment:
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date:
- 1st contract: 05th Nov, 2012
- 2nd contract: 10th April, 2013
Completion Date:
- 1st contract: 05th Jan, 2013
- 2nd contract: 10th Sep, 2013
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- 1st contract: Grid Impact Study
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- 2nd contract: Electrical Engineering Consultant Service
o Review of EPC Electrical Engineering Designs, including: Engineering design
document of Investor; Engineering design document of EPC Contractor;
Technical specification for Generator and equipment supply Sub-contract.
o Finalization and execution of the Power Purchase Agremeent (PPA) with Northern Power Company (EVN-NPC)
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 46
40. Coc San hydropower plant project (Phase 2)
Assignment Name:
Relay setting calculation for Coc San
hydropower plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Lao Cai
Duration of Assignment (months): 05 months
Name of Client: LCRE Total No of Staff-months of the assignment:
N/A
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2015-2016
Completion Date: 2016
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o Generators
o The Generator Step-up Transformers
o The 110kV busbar Coc San
o The 110kV lines from the power plant
- Supporting and getting the numbering equipment decision
- Preparing the Procedure on cooperation of plant operation
- Supporting training and certification of plant operators
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
41. Ngoi Phat hydropower plant project
Assignment Name:
Relay setting calculation for Song Bac
hydropower plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam Duration of Assignment (months): 06 months
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 47
Location within Country: Lao Cai
Name of Client: NEDI 2 Total No of Staff-months of the assignment:
N/A
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2014
Completion Date: 2014
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o Generators
o The Generator Step-up Transformers
o The 110kV busbar Ngoi Phat
o The 110kV line Ngoi Phat – Lao Cai
- Preparing the Procedure on cooperation of plant operation
- Working with A0/A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
42. Nam Gion hydropower plant project
Assignment Name:
Relay setting calculation for Song Bac
hydropower plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Son La
Duration of Assignment (months): 05 months
Name of Client: Nam Gion Jsc. Total No of Staff-months of the assignment:
N/A
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$):
Start Date: 2014
Completion Date: 2014
No of professional Staff-Months provided by
associated consultants: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 48
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o Generators
o The Generator Step-up Transformers
o The 110kV busbar Nam Gion
o The 110kV line Nam Gion – Thuan Chau
- Preparing the Procedure on cooperation of plant operation
- Supporting training and certification of plant operators
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
43. Nam Hong 1 hydropower plant project
Assignment Name:
Relay setting calculation for Nam Hong 1
hydropower plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Son La
Duration of Assignment (months): 05 months
Name of Client: Nam Hong Hydropower
Construction & Investment joint stock
company
Total No of Staff-months of the assignment:
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: March, 2013
Completion Date: May, 2013
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 49
- Power system analysis
- Relay setting calculation for Generators
- Relay setting calculation for the power transformer (T1 - 10MVA)
- Relay setting calculation for the 35kV lines
- Working with So La power company to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
44. Song Bac hydropower plant project
Assignment Name:
Relay setting calculation for Song Bac
hydropower plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ha Giang
Duration of Assignment (months): 05 months
Name of Client: Song Bac Hydropower joint
stock company
Total No of Staff-months of the assignment:
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: May, 2013
Completion Date: September, 2013
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o Generators
o The Generator Step-up Transformers
o The 110kV line Bac Quang – Song Bac
- Preparing the Procedure on cooperation of plant operation
- Working with A0/A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 50
45. Lower Se San 2 - Hydro power plant project
Assignment Name:
Verify and review Power Purchase
Agreement (PPA), Lease Agreement (LA),
and Implementation Agreement (IA) of
Lower Se San 2 in Cambodia.
Approx. Value of the contract (in current
US$): N/A
Country: Cambodia/Vietnam
Location within Country: Phnom
Penh/Hanoi
Duration of Assignment (months): 3.5 months
Name of Client: EVN International Joint-
stock Company (EVNI)
Total No of Staff-months of the assignment:
50 staff-months
Address: 11 Khuat Duy Tien St., Thanh
Xuan Dist., Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$):
N/A
Start Date: 15th Jun, 2010
Completion Date: 27th Oct, 2010
No of professional Staff-Months provided by
associated consultants: 5 staff-months
Name of Associated Consultants, If Any:
- Le Duc Son: financial professionals
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical Supporter
Narrative Description of Project: Works to be conducted:
- Verify and review Power Purchase Agreement (PPA)
- Verify and review Lease Agreement (LA)
- Verify and review Implementation Agreement (IA)
- Support EVNI in the process of finalizing PPA, LA, IA contract to be negotiated with the
Cambodian government
Description of Actual Services Provided by Your Staff within the assignment:
- Verify and review Power Purchase Agreement (PPA): Tran Anh Thai, Mai Thanh Tung,
Le Duc Son, Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen
Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau
- Verify and review Lease Agreement (LA): Tran Anh Thai, Mai Thanh Tung, Le Duc Son,
Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam,
Nguyen Duc Tam, Tran Duc Minh Chau
- Verify and review Implementation Agreement (IA): Tran Anh Thai, Mai Thanh Tung, Le
Duc Son, Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen
Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau
- Support EVNI in the process of finalizing PPA, LA, IA contract to be negotiated with the
Cambodian government: Tran Anh Thai, Le Van Hoang
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 51
46. An Khanh 1 Thermal Power plant project
Assignment Name:
Support SAM in the Financial and Technical
Due Diligence of An Khanh 1 Power Plant
(115MW)
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Thai Nguyen
Duration of Assignment (months): 5 months
Name of Client: Saigon Asset Management
(SAM)
Total No of Staff-months of the assignment:
Address: TMS Building, 12th Floor
172 Hai Ba Trung Street, District 1
Ho Chi Minh City, Vietnam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Nov, 2011
Completion Date: Apr, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Collecting the inputs and assumptions provided by the project owner
- Constructing financial model to provide sufficient information to either decline or to
proceed project
- Sensitivity Analysis with variation of total investment, annual power output, electricity
tariff, fuel price, rate exchange
- Closely examining and validating the inputs and assumptions
- Closely examining and validating the contracts provided by the project owner
- Constructing financial model once again with more detail analysis
Description of Actual Services Provided by Your Staff within the assignment: N/A
47. Ta Lang hydro power plant project
Assignment Name:
Provide consulting services for Ta Lang
Hydro Power Plant
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Bac Kan
Duration of Assignment (months): 2 months
Name of Client: Bac Kan Material
Construction Producing Join-stock Company
Total No of Staff-months of the assignment:
18 Staff-months
Address: 74 Doi Ky St., Song Cau Ward, Approx. Value of Services provided by your
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 52
Bac Kan Town, Bac Kan firm under the contract (in Current US$): N/A
Start Date: 25st Arpil, 2009
Completion Date: 28th Jul, 2009
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
N/A
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical Supporter
Narrative Description of Project: Works to be conducted:
- Grid impact study:
o Data collection and update
o Connection scheme proposal
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
o Dynamic stability studies
o Static stability studies
o Measuring system proposal
o SCADA/EMS connection proposal
o Communication solution proposal
o Cooperate with Bac Kan Material Construction Producing JSC. to reach
agreement on connection, metering with EVN and affiliates
- Technical design of metering system:
o Metering point
o Communication connection
- Advising and conducting negotiations for Power Purchase Agreement (PPA)
o Drafting and preparing documents for PPA
o Regulations on Tariff studies of MOIT to apply for Bac Kan Material
Construction Producing JSC.
o Drafting Power Purchase Agreement (PPA)
o Preparing Appendix and Form relate to PPA
o Organizing Meetings and negotiating with EVN – NPC to get Power Purchase
Agreement (PPA)
Description of Actual Services Provided by Your Staff within the assignment:
Grid impact Study:
- Data collection and update
o Updating commissioning schedules of 110kV, 35kV transmission grids in the
North of Vietnam for the period 2009-2015: Mai Thanh Tung, Nguyen Anh The
o Updating power plant commissioning schedules for the period 2009-2015: Le
Van Hoang, Do Truong Giang, Le Quoc Anh
o Updating load demand and forecasting load demand for the period 2009-2015:
Nguyen Tuyen Tam, Tran Duc Ky
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 53
- Connection scheme proposal
o Alternative connection schemes: Tran Anh Thai, Le Van Hoang
- Energy & power balance studies:
o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen
Tam, Tran Duc Ky
- Load flow analysis
o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van
Hoang, Do Truong Giang
o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le
Van Hoang, Do Truong Giang
- Short circuit studies:
o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh
- Measuring system proposal: Le Van Hoang, Do Truong Giang
- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The
- Cooperate with Bac Kan Material Construction Producing JSC. to reach agreement on
connection, metering with EVN and affiliates: Tran Anh Thai, Le Van Hoang
Technical design of metering system:
o Metering point: Le Van Hoang, Do Truong Giang
o Communication connection: Mai Thanh Tung, Nguyen Anh The
Advising and conducting negotiations for Power Purchase Agreement (PPA)
o Drafting and preparing documents for PPA: Tran Anh Thai, Le Van Hoang
o Regulations on Tariff studies of MOIT to apply for Bac Kan Material
Construction Producing JSC: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang,
Nguyen Anh The, Le Quoc Anh, Do Truong Giang, Tran Duc Ky, Nguyen Tuyen
Tam
o Drafting Power Purchase Agreement (PPA): Tran Anh Thai, Le Van Hoang,
Nguyen Anh The, Do Truong Giang
o Preparing Appendix and Form relate to PPA: Tran Anh Thai, Mai Thanh Tung,
Nguyen Tuyen Tam, Tran Duc Ky, Le Quoc Anh, Nguyen Tuyen Tam
o Organizing Meetings and negotiating with EVN – NPC to get Power Purchase
Agreement (PPA): Tran Anh Thai, Le Van Hoang.
48. Guang Lian Steel Cogeneration Plant project
Assignment Name:
Consulting service for project “Investment,
providing electricity to Guang Lian Steel,
Dung Quat Economic Zone, Quang Ngai,
Vietnam”
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Quang Ngai
Duration of Assignment (months): 5 months
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 54
Name of Client: Guang Lian Steel
(Vietnam) Co., Ltd (GLSC)
Total No of Staff-months of the assignment:
24 staff-months
Address: Dung Quat Industry Zone, Binh
Dong Commune, Binh Son District, Quang
Ngai
Approx. Value of Services provided by your
firm under the contract (in Current US$):
N/A
Start Date:
- Stage 1: 2nd Nov, 2010
- Stage 2: N/A
Completion Date:
- Stage 1: In Progress
- Stage 2: N/A
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
N/A
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical Supporter
Narrative Description of Project: Works to be conducted:
- Stage 1:
o Co-operation with GLSC to get connection point agreement and investment
bound from Vietnam Electricity (EVN) – National Power Transmission
Corporation (NPT)
o Grid connection impact study
o Co-operation with GLSC to get Grid connection agreement, Metering
agreement, SCADA/EMS connection agreement
o Power Purchase Agreement (PPA) from EVN – EPTC for buying electricity
- Stage 2: PRP will be as a coordinator cover all necessary coordinating work that
enabling GLSC and his main contractor to get final result what is EVN supply electricity
and issue the operation license:
o Support GLSC on Detail technical design
o Support GLSC to get Electricity License
o Support GLSC to working with NLDC and RLDC for Supplying and Operation
Description of Actual Services Provided by Your Staff within the assignment: We are
working on the first stage
49. The 110kV Bac Song Cam substation project (Phase 1)
Assignment Name:
Relay setting calculation for the 110kV Bac
Song Cam substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hai Phong
Duration of Assignment (months): 05 months
Name of Client: Power Construction JSC Total No of Staff-months of the assignment:
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 55
No. 1
Address: 18 Ly Van Phuc Street, Dong Da,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: May, 2012
Completion Date: Sep, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis in year 2012
- Relay setting calculation for two lines 110kV Bac Song Cam – Hai Phong Power Plant
- Relay setting calculation for busbar and breakers
- Relay setting calculation for power transformer (63MVA)
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
50. The 110kV Bac Song Cam substation project (Phase 2)
Assignment Name:
Relay setting calculation for the 110kV Bac
Song Cam substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hai Phong
Duration of Assignment (months): 05 months
Name of Client: Power Construction JSC
No. 1
Total No of Staff-months of the assignment:
Address: 18 Ly Van Phuc Street, Dong Da,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: May, 2012
Completion Date: Sep, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis in year 2012
- Relay setting calculation for two lines 110kV Bac Song Cam – Hai Phong Power Plant
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 56
- Relay setting calculation for busbar and breakers
- Relay setting calculation for power transformer (63MVA)
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
51. The 110kV Bridgestone substation project
Assignment Name:
Relay setting calculation for the 110kV
Bridgestone substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hai Phong
Duration of Assignment (months): 04 months
Name of Client: Bridgestone Vietnam Ltd,
Co.
Total No of Staff-months of the assignment:
N/A
Address: 9th Floor, 233 Dong Khoi Street,
Ben Nghe Ward, District 1, Ho Chi Minh City
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2015
Completion Date: 2015
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o The Power Transformer (T2-20MVA)
o The 110kV busbar Bridgestone
o The 110kV line Bridgestone – Dinh Vu
- Preparing the Procedure on cooperation of plant operation
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 57
52. The 110kV Nui Phao substation project
Assignment Name:
Relay setting calculation for the 110kV Nui
Phao substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Thai Nguyen
Duration of Assignment (months): 05 months
Name of Client: Power Construction JSC
No. 1
Total No of Staff-months of the assignment:
Address: 18 Ly Van Phuc Street, Dong Da,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Aug, 2012
Completion Date: Dec, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis in year 2012
- Relay setting calculation for line 110kV Nui Phao – Tuyen Quang (bay 171)
- Relay setting calculation for line 110kV Nui Phao – Thai Nguyen (bay 172)
- Relay setting calculation for busbar and breakers
- Relay setting calculation for two power transformers (2x40MVA)
- Relay setting calculation for bay 22kV
- Preparing the Procedure on cooperation of plant operation
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
53. The 110kV Veam substation project
Assignment Name:
Relay setting calculation for the 110kV
Veam substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Thanh Hoa
Duration of Assignment (months): 04 months
Name of Client: VEngy Total No of Staff-months of the assignment:
Address: N/A Approx. Value of Services provided by your
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 58
firm under the contract (in Current US$): N/A
Start Date: March, 2013
Completion Date: May, 2013
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis
- Relay setting calculation for the bays of breaker no. 631, 673, 675 and 677
- Relay setting calculation for the power transformer (T1 - 16MVA)
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
54. The 110kV Ton Hoa Sen substation project
Assignment Name:
Relay setting calculation for the 110kV Ton
Hoa Sen substation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Nghe An
Duration of Assignment (months): 04 months
Name of Client: A Chau Industrial
Technology Joint Stock Company
Total No of Staff-months of the assignment:
N/A
Address: 4th Floor, 25 Tan Mai Street, Ha
Noi, Viet Nam
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2017
Completion Date: 2017
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Power system analysis:
o Data collection and update
o Energy & power balance studies
o Load flow analysis
o Short circuit studies
- Relay setting calculation for:
o The Power Transformer (T1-63MVA)
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 59
o The 110kV busbar Ton Hoa Sen
o The 110kV line Ton Hoa Sen – Nghi Son & Quynh Luu
- Working with A1 to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 60
55. Technical Assistant project: ERAV Support Information Technology/Database: System Design and Training project
Assignment Name:
ERAV Support Information
Technology/Database: System Design and
Training
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 8 months
Name of Client: Electricity Regulatory
Authority of Vietnam (ERAV)
Total No of Staff-months of the assignment:
27 staff-months
Address: 11 Khuat Duy Tien St., Thanh
Xuan Dist., Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$):
N/A
Start Date: 29th May, 2008
Completion Date: 25th Dec, 2009
No of professional Staff-Months provided by
associated consultants: 18 staff-months
Name of Associated Consultants, If Any:
- Hoang Xuan Dau: IT Specialist
- Tu Minh Phuong: IT Specialist
- Pham Van Cuong: IT Specialist
- Ha Hai Nam: IT Specialist
- Savu Savulescu: International
consultant
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Team leader
- Mai Thanh Tung: Power Management
Narrative Description of Project: Works to be conducted:
- General structure design of database and communication system
- Detailed design of database, communication system, required applications for power
market monitoring, operation status of national power system, dispute resolution,
electricity license…
- System Implementation and Deployment
- User Manual and training for ERAV’s personnel
Description of Actual Services Provided by Your Staff within the assignment:
- General structure design of database and communication system: Tran Anh Thai, Mai
Thanh Tung, Le Van Hoang, Hoang Xuan Dau, Tu Minh Phuong, Pham Van Cuong, Ha
Hai Nam, Savu Savulescu
- Detailed design of database, communication system, required applications for power
market monitoring, operation status of national power system, dispute resolution,
electricity license…: Tran Anh Thai, Mai Thanh Tung, Ha Hai Nam, Le Van Hoang, Do
Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam,
Tran Duc Minh Chau.
- System Implementation and Deployment: Tran Anh Thai, Mai Thanh Tung, Le Van
Hoang, Ha Hai Nam
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 61
- User Manual and training for ERAV’s personnel: Tran Anh Thai, Mai Thanh Tung, Le
Van Hoang, Ha Hai Nam
56. Transmission charges calculation model development, data collection and calculation project
Assignment Name:
Transmission charges calculation model
development, data collection and calculation
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 4 months
Name of Client: Electricity Regulatory
Authority of Vietnam (ERAV)
Total No of Staff-months of the assignment:
28 staff-months
Address: 11 Khuat Duy Tien St., Thanh
Xuan Dist., Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$):
N/A
Start Date: 05th Dec, 2008
Completion Date: 31th Dec, 2009
No of professional Staff-Months provided by
associated consultants: 10 staff-months
Name of Associated Consultants, If Any:
- Tu Minh Phuong: IT Specialist
- Ha Hai Nam: IT Specialist
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Team leader
- Mai Thanh Tung: Power System
Engineer
- Le Van Hoang: Power System Engineer
Narrative Description of Project: Works to be conducted:
- Design database and calculation model, specific technical features and plan for
implementation
- Information collection
- Development of detailed database and computer models
- Transmission charges calculation
- Manuals, training on design and use of model and database
Description of Actual Services Provided by Your Staff within the assignment:
- Design database and calculation model, specific technical features and plan for
implementation: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang, Tu Minh Phuong, Ha
Hai Nam
- Information collection: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang, Do Truong
Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran
Duc Minh Chau
- Development of detailed database and computer models: Le Van Hoang, Do Truong
Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran
Duc Minh Chau
- Transmission charges calculation: Le Van Hoang, Do Truong Giang, Nguyen Anh The,
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 62
Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau
- Manuals, training on design and use of model and database: Le Van Hoang, Do Truong
Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran
Duc Minh Chau
57. Information Infrastructure for the Power Market in Vietnam project
Assignment Name:
Consulting Services on Information
Infrastructure for the Power Market in
Vietnam: Assessment, Design and Migration
Strategy
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 4 months
Name of Client: Vietnam Electricity (EVN) Total No of Staff-months of the assignment:
Address: 18 Tran Nguyen Han, Hanoi Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Jun, 2010
Completion Date: Oct, 2010
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Mr. Savu C. Savulescu
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Local consultant for main consultant (Savu C. Savulescu):
- Support main consultant review and assess overall current Information Infrastructure of
participants in VCGM
o Reviewing and assessing current information infrastructure in ERAV
o Reviewing and assessing current situation of information system, SCADA
system, metering system, Viet-pool system in SMO (A0, A1, A2, A3)
o Reviewing and assessing current situation of information system in MDMSP
o Reviewing and assessing current situation of information system in EPTC
o Reviewing and assessing current situation of information system in NPT and
other transmission company (including PTC1, PTC2, PTC3, PTC4)
o Reviewing and assessing current situation of information system in power
companies
o Reviewing and assessing current situation of information system in, SCADA
system, metering system in power plant
- Support for conceptual overall information architecture for VCGM
o Key solution and implementation criteria
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 63
o Component of, and data interfaces within, the conceptual Overall Information
Architecture (OIA) of VCGM IT infrastructure :
o ERAV information system
o SMO integrated information system
o EPTC information system
o MDMSP metering management system
o NPT operation control center
o SCADA/DMS facilities of PCs
o Distributed control system at generators
- Support for implementation planning of information system for participants synchronous
with OIA
o Generic technical requirements
o Functional requirements at metering position
o Operation requirements
o Ordering and implementing suitable hardware and software
o Acceptance of software and hardware
Description of Actual Services Provided by Your Staff within the assignment: N/A
58. SCADA and metering system for Khanh Hoa power company project
Assignment Name:
Design and implement SCADA and metering
system for Khanh Hoa power company
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Khanh Hoa
Duration of Assignment (months): 3 months
Name of Client: Khanh Hoa Power Joint
Stock Company (KHPC) – EVN CPC
Total No of Staff-months of the assignment:
Address: 11 Ly Thanh Ton Street, Nha
Trang City, Khanh Hoa
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Feb, 2010
Completion Date: Apr, 2010
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Data collection in existing information system of KHPC
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 64
o RTU exploration
o Metering system exploration
o Data collection of existing system
o Exploration and assessment of telecommunication system in KHPC
o ICCP ability survey
o Software and hardware exploration in KHPC
- Designing center hardware system
- Designing database systems (Real-Time Database; System Database; Historian
Database)
- Designing structure of GIS module for SCADA and metering system
- Designing structure of HMI module for SCADA and metering system
- Designing @IMIS Application
- Designing Web-Based interface Application
- Designing HIS Application
Description of Actual Services Provided by Your Staff within the assignment: N/A
59. Mini SCADA for Bac Ninh Power Company project
Assignment Name:
Design and implement Mini SCADA for Bac
Ninh Power Company
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Bac Ninh
Duration of Assignment (months): 6 months
Name of Client: Bac Ninh Power Company
(BNPC) – EVN NPC
Total No of Staff-months of the assignment:
Address: 03 Le Van Thinh Street, Bac Ninh
City
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Dec, 2010
Completion Date: May, 2011
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Data collection in existing information system of KHPC
o RTU exploration
o Metering system exploration
o Data collection of existing system
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 65
o Exploration and assessment of telecommunication system
o ICCP ability survey
o Software and hardware exploration
- Designing center hardware system
- Designing database systems (Real-Time Database; System Database; Historian
Database)
- Designing structure of GIS module for SCADA and metering system
- Designing structure of HMI module for SCADA and metering system
- Designing @IMIS Application
- Designing Web-Based interface Application
- Designing HIS Application
Description of Actual Services Provided by Your Staff within the assignment: N/A
60. SCADA system for NLDC project
Assignment Name:
Design and implement SCADA system for
NLDC
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 5 months
Name of Client: National Load Dispatch
Centre (A0)
Total No of Staff-months of the assignment:
Address: 18 Tran Nguyen Han Street,
Hanoi
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Aug, 2008
Completion Date: Dec, 2008
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Data collection in existing information system
o RTU exploration
o Data collection of existing system
o Exploration and assessment of telecommunication system
o ICCP ability survey
o Software and hardware exploration
- Designing hardware system
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 66
- Designing overall structure of SCADA system
- Designing structure of HMI module for SCADA system
Description of Actual Services Provided by Your Staff within the assignment: N/A
61. SCADA system for SRLDC project
Assignment Name:
Design and implement SCADA system for
SRLDC
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: HCMC
Duration of Assignment (months): 5 months
Name of Client: Southern Regional Load
Dispatch Center (A2)
Total No of Staff-months of the assignment:
Address: 5 Su Thien Chieu Street, HCMC Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Aug, 2010
Completion Date: Dec, 2010
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Data collection in existing information system
o RTU exploration
o Data collection of existing system
o Exploration and assessment of telecommunication system
o ICCP ability survey
o Software and hardware exploration
- Designing hardware system
- Designing overall structure of SCADA system
- Designing structure of HMI module for SCADA system
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 67
62. SCADA system for NPT project
Assignment Name:
Design and implement SCADA system for
NPT
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 2 months
Name of Client: National Power
Transmission Corporation (NPT)
Total No of Staff-months of the assignment:
Address: 15 Cua Bac Street, Hanoi Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Nov, 2010
Completion Date: Dec, 2010
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Data collection in existing information system
o RTU exploration
o Data collection of existing system
o Exploration and assessment of telecommunication system
o ICCP ability survey
o Software and hardware exploration
- Designing hardware system
- Designing overall structure of SCADA system
- Designing structure of HMI module for SCADA system
Description of Actual Services Provided by Your Staff within the assignment: N/A
63. Monitoring Operations of the Pilot and Full VCGM project
Assignment Name:
Support ERAV in Monitoring Operations of
the Pilot and Full VCGM
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi
Duration of Assignment (months): 1 months
Name of Client: Electricity Regulatory
Authority of Vietnam (ERAV)
Total No of Staff-months of the assignment:
Address: 11 Khuat Duy Tien St., Thanh Approx. Value of Services provided by your
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 68
Xuan Dist., Hanoi firm under the contract (in Current US$): N/A
Start Date: Nov, 2011
Completion Date: Dec, 2012
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
IES - Intelligent Energy Systems
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Senior Engineer
- Le Van Hoang: Technical supporter
Narrative Description of Project: local consultant for main consultant (IES - Intelligent Energy
Systems):
- Local contact point
- Making arrangements for translation of documents for project purposes
- Participating as required in the stakeholder workshop
Description of Actual Services Provided by Your Staff within the assignment: N/A
64. Data for Research Power Generation Market in Vietnam project
Assignment Name:
Provide Updated Data for Research Power
Generation Market in Vietnam
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Hanoi, HCMC
Duration of Assignment (months): 1 months
Name of Client: Masan Group Corporation
(Masan Group)
Total No of Staff-months of the assignment:
Address: 8th Floor, Central Plaza, 17 Le
Duan, District 1, Ho Chi Minh City
Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: Nov, 2011
Completion Date: Dec, 2011
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Le Van Hoang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Updating the data of power plants are in operation until 2011
o Updating data about owner, install capacity, number of units, power plant type,
commissioning year, location, contract price, revenue of the year 2008, 2009,
2010.
o Updating data about operation information include historical data of energy
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 69
output and equivalent operating hours.
- Updating the data of power plants are expected to operate up to 2030
o Updating data about investor, install capacity, power plant type, expected
commissioning year, location.
Description of Actual Services Provided by Your Staff within the assignment: N/A
65. EVNNPT Information Technology Roadmap project
Assignment Name:
Supporting Tangible International
Corporation (TIC) to develop the Information
Technology Roadmap for EVNNPT
Approx. Value of the contract (in current
US$): N/A
Country: Vietnam
Location within Country: Ha Noi
Duration of Assignment (months): 05 months
Name of Client: TIC Total No of Staff-months of the assignment:
N/A
Address: N/A Approx. Value of Services provided by your
firm under the contract (in Current US$): N/A
Start Date: 2015-2016
Completion Date: 2016
No of professional Staff-Months provided by
associated consultants: N/A
Name of Associated Consultants, If Any:
Name of Senior Staff Involved and Functions
Performed:
- Tran Anh Thai: Project Manager
- Do Truong Giang: Technical supporter
Narrative Description of Project: Works to be conducted:
- Review and Assess EVNNPT's Current Transmission System and Ongoing and
Planned IT System Projects.
- Develop a 10-year Transmission System IT Roadmap for EVNNPT.
- Develop Integration Strategy, Implementation Plan, and Strategic Roadmap for
Proposed Investments.
- Working with EVNNPT to take approval
Description of Actual Services Provided by Your Staff within the assignment: N/A
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 70
EXPERT CURRICULUM VITAE
Mr. Tran Anh Thai
1. Proposed Position: Team Leader of Local Experts, Power System Engineer and Markets
Expert
2. Name of Firm: Vietnam Power Resource Partners Corporation (PRP)
3. Name of Staff: Tran Anh Thai
4. Date of Birth: 1 July 1964 Nationality: Vietnamese
5. Education:
1985 Hanoi University of Technology, Power System Faculty
Power System Engineering Degree
1994 Hanoi University of Technology, and Tractabel (Belgium)
Diploma, Economic Operation and Maintenance of 500kV network
1995 JICA education centre (Japan)
Management of Local Economic development
6. Membership of Professional Associations: Member of IEEE and CIGRE since 1996
7. Other Training: Teacher Assistant for course on Management in Power Sector, organized
by ASEAN Institute of Economy and Education Centre of Energy Ministry, sponsored by
SIDA, Sweden.
8. Countries of Work Experience:
Vietnam
9. Languages:
Vietnamese, English
10. Employment Record:
2006 – present Vietnam Power Resources Partners Corp. (PRP), General Director
2005 – 2006 Applied Technical Systems, Chief Financial Officer and Technical
Advisor
2004 – 2005 Electricity of Vietnam (EVN), Director of National Load Dispatch
Center
2000 – 2004 Electricity of Vietnam (EVN), Director of Power Network Department
1996 – 2000 Electricity of Vietnam (EVN), Deputy Director of Power Network
Department
1995 – 1996 Electricity of Vietnam (EVN), Senior Engineer in Power Network
Department
1990 – 1995 Power Transmission Company No. 2, Head of Technical
Department
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 71
1987 – 1990 Power Transmission Company No. 3, Senior Engineer in Technical
Department
1985 – 1987 Caudo Thermal Power, Engineer of plant project management board
(Danang)
Professional skills
Project management.
Power System planning and studies.
Operation and Maintenance of Power system facilities
Risk management and reliability in the operation of power plant, transmission and
distribution system.
Specializing in control and protection systems of power systems and power plants.
Specializing in information and data system designed for optimizing the operation of
power system and power plant
Power market design, operation and Power sector restructuring.
Optimizing the operation of power plant and power system
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Developing and building
the 110-220kV Power Network of Central of Vietnam
Year: 1990-1994
Location: Vietnam
Client: EVN
Position held: Head of Technical Department
Activities performed:
Participating in designing, evaluating, supervising construction
process, commissioning tests, checking for acceptance and
taking over for operation and maintenance.
Name of assignment or project: 500kV Network, Line 1
Year: 1993-1994
Location: Vietnam
Client: EVN
Position held: Head of Technical Department
Activities performed:
Participating in designing, evaluating, supervising construction
process, commissioning tests, checking for acceptance and
taking over for operation and maintenance.
Name of assignment or project: 500kV Network, Line 1
Year: 1994-1996
Location: Vietnam
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 72
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Client: EVN
Position held: Senior Engineer
Activities performed:
- Researching, analyzing, and dealing with system errors in
calculation, design and installation
- Organizing the operation and maintenance of the whole
system
Name of assignment or project: Planning, researching and
calculating Vietnam Power System
Year: 1996-2005
Location: Vietnam
Client: EVN
Position held: Senior Engineer
Activities performed:
Studying, Analyzing and researching in Power System
Name of assignment or project: Designing the national
power transmission system.
Year: 1996-2005
Location: Vietnam
Client: EVN
Position held: Senior Engineer
Activities performed:
Preparing technical specification of equipments and on the
whole system coordination
Name of assignment or project: Report on the need of
500kV system, line 2.
Year: 2003
Location: Vietnam
Client: EVN
Position held: Project Manager
Activities performed:
In charge of methodology, input and output analysis,
synthesizing and preparing the final report
Name of assignment or project: Report on system
aqueduct of five years of operation of Vietnam Power
Network (2004-2008).
Year: 2004
Location: Vietnam
Client: EVN
Position held: Project Manager
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 73
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Activities performed:
In charge of methodology, input and output analysis,
synthesizing and preparing the formal proposals
Name of assignment or project: System Security report
and proposal program applied to Vietnam Power Network.
Year: 2004-2005
Location: Vietnam
Client: EVN
Position held: Project Manager
Activities performed:
In charge of methodology, input and output analysis
Name of assignment or project: Vietnam Power Market
Development
Year: 2004-2005
Location: Vietnam
Client: EVN
Position held: General Project Manager
Activities performed:
Market Design, technical specification, staff organizing and
Project Sponsor.
Name of assignment or project: Substation Integration
System Development
Year: 2005-2007
Location: Vietnam
Client: Applied Technical Systems Co. Ltd
Position held: Technical Advisor
Activities performed:
Substation Integration System Development with IEC 61850
compliance.
Name of assignment or project: Thang Long Coal Thermal
Power Plant (600MW Installed Capacity)
Year: 2007
Location: Vietnam
Client: Thang Long JSC.
Position held: Project Manager
Activities performed:
- Grid Impact study for Transmission Access International
Consultant hiring
Name of assignment or project: AES. Mong Duong 2 Coal
Thermal power plant (1200 MW Installed capacity)
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 74
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Year: 2007
Location: Vietnam
Client: AES-VCM Mong Duong Power Company Limited
Position held: Project Manager
Activities performed:
Grid Impact study for Transmission Access
Name of assignment or project: Nhon Trach 2, Gas Fired
Combined Cycle Power Plant
Year: 2007
Location: Vietnam
Client: PV Power Nhon Trach 2 Jsc.
Position held: Project Manager
Activities performed:
Grid Impact study for Transmission Access
Name of assignment or project: Transmission charges
calculation model development, data collection and
calculation.
Year: 2008
Location: Vietnam
Client: ERAV.
Position held: Project Manager
Activities performed:
- Design database and calculation model, specific technical
features and plan for implementation
- Information collection
- Development of detailed database and computer models
- Transmission charges calculation
- Manuals, training on design and use of model and
database
Name of assignment or project: ERAV Support Information
Technology/Database: System Design and Training.
Year: 2008
Location: Vietnam
Client: ERAV.
Position held: Project Manager
Activities performed:
- General structure design of database and communication
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 75
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
system
- Detailed design of database, communication system,
required applications for power market monitoring,
operation status of national power system, dispute
resolution, electricity license
- System Implementation and Deployment
- User Manual and training for ERAV’s personnel
Name of assignment or project: Ta Lang Hydro Power
Plant project (4.5 MW Installed capacity)
Year: 2009
Location: Vietnam
Client: Bac Kan Material Construction Producing Join-stock
Company
Position held: Project Manager
Activities performed:
- Grid impact study for power flow and short-circuit.
- Technical design of SCADA and metering system.
- Consulting for Power Purchase Agreement.
Name of assignment or project: Lower Se San 2 Hydro
power plant project (400 MW Installed capacity)
Year: 2010
Location: Vietnam & Cambodia
Client: EVN International.
Position held: Project Manager
Activities performed:
Verify and review Power Purchase Agreement (PPA), Lease
Agreement (LA), Implementation Agreement (IA)
Name of assignment or project: Guang Lian Steel project
(460 MW Installed capacity)
Year: 2010
Location: Dung Quat, Quang Ngai
Client: GLSC Ltd.
Position held: Project Manager
Activities performed:
- Grid impact study for power flow and short-circuit.
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 76
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
- Technical design of SCADA and metering system.
- Consulting for Power Purchase Agreement (PPA).
- Working with ERAV to get Electricity License and
Generation Electricity License.
- Working with NLDC and RLDC for supplying and operation
Name of assignment or project: Detailed design of
Information and Intelligent Technology Infrastructure for the
electricity market in Vietnam
Year: 2010
Location: Vietnam
Client: Power Engineering Consulting Joint Stock Company
3 – PECC3.
Position held: Senior Expert
Activities performed:
Participating in designing of Information and Intelligent
Technology Infrastructure for the electricity market in
Vietnam.
Name of assignment or project: SCADA and metering
system for Khanh Hoa power company
Year: 2010
Location: Vietnam
Client: Khanh Hoa Power Joint Stock Company (KHPC) –
EVN CPC
Position held: Project Manager
Activities performed:
Participating in designing and implement of SCADA and
metering system for Khanh Hoa power company.
Name of assignment or project: Design and implement Mini
SCADA for Bac Ninh Power Company
Year: 2010, 2011
Location: Vietnam
Client: Bac Ninh Power Company (BNPC) – EVN NPC
Position held: Project Manager
Activities performed:
Participating in designing and implement of SCADA and
metering system for Bac Ninh power company.
Name of assignment or project: Design and implement
SCADA system for NLDC
Year: 2010, 2011
Location: Vietnam
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 77
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Client: National Load Dispatch Centre (A0)
Position held: Project Manager
Activities performed:
Participating in designing and implement of SCADA and
metering system for NLDC
Name of assignment or project: Design and implement
SCADA system for SRLDC
Year: 2010
Location: Vietnam
Client: Southern Regional Load Dispatch Center (A2)
Position held: Project Manager
Activities performed:
Participating in designing and implement of SCADA and
metering system for SRLDC
Name of assignment or project: Design and implement
SCADA system for NPT
Year: 2010
Location: Vietnam
Client: National Power Transmission Corporation (NPT)
Position held: Project Manager
Activities performed:
Participating in designing and implement of SCADA and
metering system for NPT
Name of assignment or project: Support ERAV in
Monitoring Operations of the Pilot and Full VCGM
Year: 2011, 2012
Location: Vietnam
Client: Electricity Regulatory Authority of Vietnam (ERAV)
Position held: Senior Engineer
Activities performed:
Participating as assistant for main consultant
Name of assignment or project: Provide Updated Data for
Research Power Generation Market in Vietnam
Year: 2011
Location: Vietnam
Client: Masan Group Corporation (Masan Group)
Position held: Project Manager
Activities performed:
Participating in updating data for Research Power Generation
Market in Vietnam
Name of assignment or project: Support SAM in the
Financial and Technical Due Diligence of An Khanh 1 Power
Plant (115MW)
Year: 2011, 2012
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 78
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Location: Vietnam
Client: Saigon Asset Management (SAM)
Position held: Project Manager
Activities performed:
Participating in Support SAM in the Financial and Technical
Due Diligence
Name of assignment or project: Grid Impact Study and
Electrical Engineering Consultant Service for Coc San
hydropower plant
Year: 2012-2013
Location: Vietnam
Client: Colben Energy Vietnam JSC.
Position held: Project Manager
Activities performed:
Participating in Consultant Service
Name of assignment or project: Technical design and
assist Doosan Vina in Mong Duong 2 Thermal Power Project
Year: 2011, 2012
Location: Vietnam
Client: Doosan Vina
Position held: Project Manager
Activities performed:
Participating as assistant for Doosan Vina
Name of assignment or project: Relay setting calculation
for Nghi Son 1 Thermal Power Plant (2x300MW)
Year: 2012
Location: Vietnam
Client: Alstom Grid Vietnam
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Bac Song Cam substation (T1)
Year: 2012
Location: Vietnam
Client: Power Construction JSC No. 1
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Nui Phao substation
Year: 2012
Location: Vietnam
Client: Power Construction JSC No. 1
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 79
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for Nam Hong 1 hydropower plant
Year: 2013
Location: Vietnam
Client: Nam Hong Hydropower JSC.
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Veam substation
Year: 2013
Location: Vietnam
Client: VEngy
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Bac Song Cam substation (T2)
Year: 2013
Location: Vietnam
Client: Power Construction JSC No. 1
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for Song Bac hydropower plant
Year: 2013
Location: Vietnam
Client: Song Bac Hydropower JSC.
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for Ngoi Phat hydropower plant
Year: 2014
Location: Vietnam
Client: NEDI 2.
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 80
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Relay setting calculation
for Nam Gion hydropower plant
Year: 2014
Location: Vietnam
Client: Nam Gion Jsc.
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Bridgestone substation (T2)
Year: 2015
Location: Vietnam
Client: Bridgestone Vietnam Ltd, Co
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for Coc San hydropower plant
Year: 2015-2016
Location: Vietnam
Client: LCRE.
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: EVNNPT Information
Technology Roadmap project
Year: 2015-2016
Location: Vietnam
Client: Tangible International Corporation (TIC)
Position held: Project Manager
Activities performed:
Supporting Tangible International Corporation (TIC) to
develop the Information Technology Roadmap for EVNNPT
Name of assignment or project: Relay setting calculation
for Thai Binh 1 Thermal Power Plant (2x300MW)
Year: 2016-2017
Location: Vietnam
Client: TPSC Vietnam & FUJI & Marubeni
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Relay setting calculation
for the 110kV Ton Hoa Sen substation
Year: 2017
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 81
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Location: Nghe An, Vietnam
Client: A Chau Industrial Technology Joint Stock Company
Position held: Project Manager
Activities performed:
Participating in Relay setting calculation
Name of assignment or project: Dam Nai Wind Power
project (40MW)
Year: 2017
Location: Ninh Thuan, Vietnam
Client: Dam Nai Wind Power Joint Stock Company
Position held: Project Manager
Activities performed:
Grid connection impact study of Damnai wind power plant
Name of assignment or project: Hoa Thuan hydropower
plant project (17.4MW)
Year: 2017-2018
Location: Cao Bang, Vietnam
Client: Hoa Thuan Joint Stock Company
Position held: Project Manager
Activities performed:
Technical Consultant services and Relay setting calculation
for Hoa Thuan hydropower plant
Name of assignment or project: CMX RE-SUNSEAP Solar
Power Plant project
Year: 2017-2018
Location: Ninh Thuan, Vietnam
Client: SUNSEAP Group (CMX RE CMX-SUNSEAP Vietnam
Solar Power Joint Stock Company)
Position held: Project Manager
Activities performed:
Feasibility Study and Technical Agreements Consulting
Service for CMX RE Solar Power Plant project
Name of assignment or project: Da Bac Solar Power Plant
project
Year: 2018
Location: Ba Ria, Vietnam
Client: Dong A Joint Stock Company
Position held: Project Manager
Activities performed:
Technical Agreements Consulting Service for Da Bac Solar
Power Plant project
Name of assignment or project: Da Bac 2 Solar Power
Plant project
Year: 2018
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 82
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Location: Ba Ria, Vietnam
Client: Tai Tien Co.,Ltd
Position held: Project Manager
Activities performed:
Technical Agreements Consulting Service for Da Bac 2 Solar
Power Plant project
Name of assignment or project: The 220kV Da Bac
substation of Da Bac and Da Bac 2 Solar Power Plant project
(2x63MVA)
Year: 2018
Location: Ba Ria, Vietnam
Client: Tai Tien Co.,Ltd
Position held: Project Manager
Activities performed:
Feasibility Study (FS) and Basic Design for Consulting
Service for the 220kV Da Bac substation and 220kV
transmission lines of Da Bac and Da Bac 2 Solar Power
Plant project
Name of assignment or project: Phuong Mai 3 Wind Power
Plant project (21MW)
Year: 2018
Location: Binh Dinh, Vietnam
Client: Central Wind-Power Investment & Development Co.
Position held: Project Manager
Activities performed:
Feasibility Study and Basic Design and Technical
Agreements Consulting Service for Phuong Mai 3 Wind
Power Plant project
Name of assignment or project: Xuan Tho 1 Solar Power
Plant project (49MWp)
Year: 2018
Location: Phu Yen, Vietnam
Client: Nam Viet Hung Investment Corp.
Position held: Project Manager
Activities performed:
Feasibility Study and Basic Design and Technical
Agreements Consulting Service for Xuan Tho 1 Solar Power
Plant project
Name of assignment or project: Xuan Tho 2 Solar Power
Plant project (49MWp)
Year: 2018
Location: Phu Yen, Vietnam
Client: Nam Viet Hung Investment Corp.
Position held: Project Manager
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 83
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Activities performed:
Feasibility Study and Basic Design and Technical
Agreements Consulting Service for Xuan Tho 2 Solar Power
Plant project
Name of assignment or project: Rung Xanh Solar Power
Plant project (150MWp)
Year: 2018
Location: Dak Lak, Vietnam
Client: Dak Lak Forestry Co.Ltd
Position held: Project Manager
Activities performed:
Grid Impact Study for Rung Xanh Solar Power Plant project
Name of assignment or project: Nexif Ben Tre 3 Wind
Power Plant project (Phase 1: 30MW and Phase 2: 30MW)
Year: 2018-2019
Location: Ben Tre, Vietnam
Client: NEXIF ENERGY BEN TRE CO., LTD
Position held: Project Manager
Activities performed:
Feasibility Study and Basic Design and Technical
Agreements Consulting Service for Nexif Ben Tre Wind
Power Plant project
Name of assignment or project: My Son Solar Power
Plant project (50MWp)
Year: 2018
Location: Ninh Thuan,
Vietnam
Client: BG Energy Solution
Company Limited
Position held: Project
Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: Ham Kien Solar Power
Plant project (49MWp)
Year: 2018
Location: Binh Thuan,
Vietnam
Client: BG Energy Solution
Company Limited
Position held: Project
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 84
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Manager
Activities performed:
Appraising for Feasibility Study (FS) and Basic Design
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: Phuoc Trung Solar
Power Plant project (50MWp)
Year: 2018
Location: Ninh Thuan,
Vietnam
Client: SAVINA POWER
JSC
Position held: Project
Manager
Activities performed:
Design for 22/220kV – 50MVA substation and double line
of Phuoc Trung Solar power plant.
Grid Impact Study for Phuoc Trung Solar power plant.
Name of assignment or project: BIM2 Solar Power
Plant project (250MWp)
Year: 2018
Location: Ninh Thuan,
Vietnam
Client: ATS JSC
Position held: Project
Manager
Activities performed:
Calculating the capacitor volume.
Preparing the Procedure on cooperation of plant operation
Participating in Relay setting calculation
Grid Impact Study
Advising on Licensing Power Operation
Prepare profile for the official commercial operation date.
Name of assignment or project: Dami floating Solar
Power Plant project (50MWp)
Year: 2018
Location: Binh Thuan,
Vietnam
Client: ATS JSC
Position held: Project
Manager
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 85
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Activities performed:
Calculating the capacitor volume.
Preparing the Procedure on cooperation of plant operation
Participating in Relay setting calculation
Grid Impact Study
Advising on Licensing Power Operation
Prepare profile for the official commercial operation date.
Name of assignment or project: LocNinh5 Solar Power
Plant project (50MWp)
Year: 2018
Location: Binh Thuan,
Vietnam
Client: LocNinh 5 power JSC
Position held: Project
Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: LocNinh4 Solar Power
Plant project (200MWp)
Year: 2018
Location: Binh Thuan,
Vietnam
Client: LocNinh 4 power JSC
Position held: Project
Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: LocNinh3 Solar Power
Plant project (150MWp)
Year: 2018
Location: Binh Thuan, Vietnam
Client: LocNinh 3 power JSC
Position held: Project Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 86
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Support for negotiating EPC contract
Name of assignment or project: LocNinh2 Solar Power
Plant project (200MWp)
Year: 2018
Location: Binh Thuan, Vietnam
Client: LocNinh 2 power JSC
Position held: Project Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: LocNinh1 Solar Power
Plant project (200MWp)
Year: 2018
Location: Binh Thuan, Vietnam
Client: LocNinh 1 power JSC
Position held: Project
Manager
Activities performed:
Feasibility Study (FS) and Basic Design examination
Grid Impact Study for Rung Xanh Solar Power Plant project
Support for negotiating EPC contract
Name of assignment or project: Huong Tan Solar
Power Plant project (48MW)
Year: 2019
Location: Quang Tri, Vietnam
Client: Phu Dien Construction Investment And Trading Joint
Stock Company
Position held: Project Manager
Activities performed:
Preliminary Agreement on Power Purchasing
Grid Impact Study and and Agreement on Grid Connection
Agreement on Tariff Metering System
Agreement on Relay Protection and Automation System
Agreement on SCADA and Telecommunication System
Name of assignment or project: Tan Linh Solar Power
Plant project (48MW)
Year: 2019
Location: Quang Tri, Vietnam
Client: Phu Dien Construction Investment And Trading Joint
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 87
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Stock Company
Position held: Project Manager
Activities performed:
Preliminary Agreement on Power Purchasing
Grid Impact Study and and Agreement on Grid Connection
Agreement on Tariff Metering System
Agreement on Relay Protection and Automation System
Agreement on SCADA and Telecommunication System
Name of assignment or project: Lien Lap Solar Power
Plant project (48MW)
Year: 2019
Location: Quang Tri, Vietnam
Client: Phu Dien Construction Investment And Trading Joint
Stock Company
Position held: Project Manager
Activities performed:
Preliminary Agreement on Power Purchasing
Grid Impact Study and and Agreement on Grid Connection
Agreement on Tariff Metering System
Agreement on Relay Protection and Automation System
Agreement on SCADA and Telecommunication System
Name of assignment or project: Soc Son biomass
thermal power plant project (75MW)
Year: 2019
Location: Ha Noi, Vietnam
Client: Ha Noi Thien Y Environmental Energy Joint Stock
Company
Position held: Project Manager
Activities performed:
Agreement on Tariff Metering System
Agreement on Relay Protection and Automation System
Agreement on SCADA and Telecommunication System
Name of assignment or project: Song Giang
Hydropower plant project (49MW)
Year: 2019
Location: Khanh Hoa, Vietnam
Client: ATS JSC
Position held: Project Manager
Activities performed:
Grid Impact Study
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 88
11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Support contract negotiation
Name of assignment or project: BIM3 Solar Power
project (50MWp)
Year: 2019
Location: Ninh Thuan, Vietnam
Client: BIM RENEWABLE ENERGY JOINT STOCK
COMPANY
Position held: Project Manager
Activities performed:
Load flow calculation.
Contingency calculation.
Short circuit calculation.
Active and Reactive power capability calculation
Fault-Ride-Through.
Frequency Regulation
Harmonic effect from PV project to grid connection
Name of assignment or project: Cat Hiep Solar Power
project (50MWp)
Year: 2019
Location: Binh Dinh, Vietnam
Client: Binh Dinh TTP Energy and high technology., JSC
Position held: Project Manager
Activities performed:
Load flow calculation.
Contingency calculation.
Short circuit calculation.
Active and Reactive power capability calculation
Fault-Ride-Through.
Frequency Regulation
Harmonic effect from PV project to grid connection
13. Certification:
I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly
describes myself, my qualifications, and my experience. I understand that any wilful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam
Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]
VietnamPRP profile Page 89
[Signature of staff member and authorized representative of the firm]
06/03/2019