Victoria Square/Pinfold Street Facade Including Post ...€¦ · Victoria Square/Pinfold Street...
Transcript of Victoria Square/Pinfold Street Facade Including Post ...€¦ · Victoria Square/Pinfold Street...
H
i
l
l
S
t
r
e
e
t
S
u
f
f
o
l
k
S
t
r
e
e
t
Q
u
e
e
n
s
w
a
y
B
r
u
n
e
l
S
t
r
e
e
t
P
i
n
f
o
l
d
S
t
r
e
e
t
Ste
phenson S
treet
H
o
l
l
i
d
a
y
S
t
r
e
e
t
Signalised junction
S
w
a
l
l
o
w
S
t
r
e
e
t
Victoria
Square
Town
Hall
Hall of
Memory
New Street Station
Victoria
Square
House
B
r
o
a
d
S
t
r
e
e
t
N
ew
S
treet
New bridge
strcuture
Retaining wall, approximate
maximum height 1.2mRetaining wall,
approximate
height 1.2m
Steps
Swallow Street to be
closed
H
i
l
l
S
t
r
e
e
t
Access to Paradise Circus
Redevelopment
N
a
v
i
g
a
t
i
o
n
S
t
r
e
e
t
Centenary Square Tram Stop
New Street Station Tram Stop.
Signalised junction (Paradise
Street to Broad Street).
Arena Central
Development
Victoria Square Tram Stop.
P
a
r
a
d
i
s
e
C
i
r
c
u
s
Q
u
e
e
n
s
w
a
y
Service road for access to
Paradise Circus Redevelopment
C
ontinuation from
B
C
C
E
C
o
n
tin
u
a
tio
n
to
C
S
Q
Intervisibilty splay
Level difference
across Swallow
Street approximately
1.1m above existing
levels which requires
Swallow Street to be
closed
Paradise Circus
Redevelopment
0.0
00
10
.0
00
20
.0
00
30
.0
00
40
.0
00
50
.0
00
60
.0
00
70
.0
00
80
.0
00
90
.0
00
10
0.0
00
11
0.0
00
12
0.0
00
13
0.0
00
14
0.0
00
15
0.0
00
16
0.0
00
17
0.0
00
18
0.0
00
19
0.0
00
20
0.0
00
21
0.0
00
22
0.0
00
23
0.0
00
24
0.0
00
25
0.0
00
26
0.0
00
27
0.0
00
28
0.0
00
29
0.0
00
30
0.0
00
0.0
00
0.0
00
12
5.3
88
12
5.4
15
12
5.3
89
12
5.2
78
12
5.3
20
12
5.3
14
12
5.4
94
12
5.1
61
12
4.9
63
12
4.8
64
12
4.7
62
12
4.7
76
12
4.8
02
12
4.7
06
12
4.6
46
12
4.6
04
12
4.5
25
12
4.4
94
12
4.4
38
12
4.3
24
12
4.4
39
12
4.6
07
12
5.0
57
12
5.7
48
12
6.3
45
12
6.9
42
12
7.5
39
12
8.1
35
12
8.7
31
12
9.3
28
12
9.9
09
12
5.1
37
12
5.1
71
12
5.2
05
12
5.2
40
12
5.2
74
12
5.3
05
12
5.2
84
12
5.1
99
12
5.0
94
12
4.9
89
12
4.8
84
12
4.7
79
12
4.6
86
12
4.6
32
12
4.5
96
12
4.5
60
12
4.5
24
12
4.4
89
12
4.5
01
12
4.6
11
12
4.8
19
12
5.1
25
12
5.5
29
12
5.9
97
12
6.4
79
12
7.0
65
12
7.7
77
12
8.5
86
12
9.4
01
13
0.2
16
13
1.0
31
12
5.1
37
12
5.1
37
D=46.792
R=-25.000 L=21.000
D=8.382 CL=8.000
R=82.000
L=8.330
CL=8.000 D=69.598 CL=15.001
R=25.000 L=21.528
CL=15.000 D=55.504 CL=15.000
R=157.000
L=15.169
P=0.342% L=46.790
R=-1507.538 L=21.001
P=-1.051% L=44.395
R=2500.000 L=17.317
P=-0.358% L=40.599
R=1020.356 L=51.529P=4.692% L=13.954
R=800.000 L=27.679 P=8.152% L=59.038
30
0.0
00
31
0.0
00
32
0.0
00
33
0.0
00
34
0.0
00
35
0.0
00
36
0.0
00
37
0.0
00
38
0.0
00
39
0.0
00
40
0.0
00
41
0.0
00
42
0.0
00
43
0.0
00
44
0.0
00
45
0.0
00
46
0.0
00
47
0.0
00
48
0.0
00
49
0.0
00
50
0.0
00
51
0.0
00
52
0.0
00
52
3.0
39
52
3.0
39
52
3.0
39
12
9.9
09
13
0.4
22
13
1.0
62
13
1.9
82
13
2.9
92
13
3.8
47
13
4.7
99
13
5.5
67
13
5.9
78
13
6.1
84
13
6.1
23
13
6.1
51
13
6.1
83
13
6.3
67
13
6.3
62
13
6.3
01
13
6.4
58
13
6.5
10
13
6.7
00
13
6.8
47
13
7.0
68
13
7.3
30
13
7.5
76
13
7.6
70
13
1.0
31
13
1.8
46
13
2.6
62
13
3.4
47
13
4.1
34
13
4.7
20
13
5.2
06
13
5.5
90
13
5.8
74
13
6.0
57
13
6.1
51
13
6.2
06
13
6.2
59
13
6.3
12
13
6.3
65
13
6.4
18
13
6.4
76
13
6.5
87
13
6.7
63
13
7.0
04
13
7.3
01
13
7.6
04
13
7.9
08
13
8.0
00
13
8.0
00
13
8.0
00
R=157.000
L=15.169
CL=15.000 D=15.791 CL=11.000
R=-25.000 L=28.829
CL=15.000 D=55.090 CL=8.000
R=60.000
L=11.312
CL=8.000 CL=8.000
R=-155.000
L=11.113
CL=8.000 D=20.602
P=8.152% L=59.038
R=-991.500 L=70.620R=-2000.000
L=10.000
P=0.529% L=53.185 R=1533.280 L=38.419 P=3.035% L=28.512
Key to symbols
RevStatus
Drawing Number
Scale at A1
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Notes
Client
Reference drawings
App’dCh’k’dDescriptionDrawnDateRev
Crown Copyright Licence No. 01100019543. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or Civil Proceedings
Reproduced from the Ordnance Survey base map with permission of the Controller of Her Majesty's Stationery Office,
TFW
©
The Midland Metro
(Birmingham City Centre Extension
Land Aquisition and Variation) Order
Objector 11 Alternative Alignment
Option A Plan & Long Section
Centro
Centro House
16 Summer Lane
Birmingham
B19 3SD
-
A. Brown
M. Paterson
M. Grazette
M. Grazette
G. Last
As Shown PRE
MMD-300207-CE03-DRA-0000-0011
P1
1st/2nd Floors
35 Newhall Street
Birmingham
B3 3PU
United Kingdom
+44 (0) 121 234 1500
+44 (0)121 200 3295
www.mottmac.com
Mott MacDonald Ltd
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
1. Do not scale from this drawing.
2. All dimensions are in metres unless otherwise stated.
3. This layout is based upon initial concept design using O.S. mapping and
topographical survey where available.
P1 16.10.14 AJB Public Inquiry Issue MBG GJL
Objector 11 Alternative Alignment Option A
Centenary Square Bound Track Centreline Long Section
Chainage: 0 to 300
Scale - H = 1:1000, V = 1:500
Objector 11 Alternative Alignment Option A
Centenary Square Bound Track Centreline Long Section
Chainage: 300 to 520
Scale - H = 1:1000, V = 1:500
Objector 11 Alternative
Alignment Option A Plan
Scale1:1000
Hill Street /
Navigation Street Junction
Swallow Street
Top of existing wall to
One Victoria Square
Victoria Square Tram Stop
1:1000
0 100m50m
1:500
0 50m25m
Navigation Street /
Stephenson Street Junction
Navigation Street /
Pinfold Street Junction
Victoria Square /
Hill Street Junction
Swallow Street
New Street Station Tram Stop
Town Hall
Track Centreline
Kerbline
Track DKE
Tram Stop
Horizontal Tangent Point
Vertical Tangent Point
Key for Long Sections
Key for Option B Plan
Paradise Circus and Arena Central Developments
Intervisibility Splay
Exhibits Page 63