Vibration of turbine.pdf
-
Upload
sanjeevchhabra -
Category
Documents
-
view
224 -
download
0
Transcript of Vibration of turbine.pdf
-
7/28/2019 Vibration of turbine.pdf
1/4
SITE: NTPC RAMAGUNDAM UNIT - 3
PROBLEM: VIBRATION OF TURBINE RUB
NTPC Ramagundam units 1 to 3 are Ansaldo Units of rating 200 MW .
The turbine consists of Combined HP IP and LP Modules . The first
stage of the combined HP-IP turbine is Curtis stage .The HP-IP rotor
is of single journal at bearing 1 and LP rotor is supported at bearing 2
and 3. The thrust bearing location is at bearing 1 and pedestals 1 and
2 are sliding type. The generator bearing are end shield mounted .
The unit had undergone capital overhaul during Jan Feb. 07 . HP-IP
rotor was replaced with new rotor from Ansaldo during Overhaul. The
unit was rolled on 20th Feb. early hours after overhaul. The turbine
rotor system is soaked at 1000 rpm for about 1 hour and at 2500 rpm
for 10 minutes during rolling to 3000 rpm.
Vibration monitoring is carried out with permanently mounted shaftrider probes at turbine and generator bearings . Each bearing is
instrumented with one shaft rider probe mounted at approximately 60
degrees to the horizontal . In addition an eccentricity probe is provided
at pedestal 1 .
During the initial rolling at soaking it was observed that the
eccentricity,bearing 2 (LP front ) and bearing 3 (LP rear ) vibrations
were increasing alarmingly at constant speed of 1000 rpm , the shaftvibrations were exceeding 225 microns peak to peak . The unit was
tripped and was kept on barring gear for 4 hours before rolling back to
1000 rpm .Once again the turbine vibrations rose alarmingly high refer
figure 1 , and the unit was tripped . The noise from pedestal 2 was
distinctively different from a machine that coasts down smoothly.
It was decided to open and inspect shaft areas within pedestal 2 .
-
7/28/2019 Vibration of turbine.pdf
2/4
A strong de-colourisation and deep rub grooves were observed at LP
front bearing Oil catcher portion. The fins had rubbed in to the shaft
and were rectified with proper design clearances.
The unit was rolled and all vibrations were normal at 1000 rpm and
2500 rpm soaking speeds. However when rolled to 3000 rpm the
generator front shaft vibrations started increasing to alarm levels.
Refer to figure 2 . The unit was tripped and on inspection of LP rear
pedestal heavy rub marks were observed at LP rear oil catcher. Some
of the fins had come out and had to be re-finned at site.
The unit was rolled back after above corrections . The shaft and
bearing vibration levels were found satisfactory at 3000 rpm and were
steady. The shaft vibrations were less than 100 microns peak to peak
and bearing vibrations were less than 25 microns peak to peak at all
turbine and generator bearings . The unit was synchronized and
vibration levels are well within limits at rated load.
-
7/28/2019 Vibration of turbine.pdf
3/4
Figure 1
Speed : 3000
Gen Front
Gen rear
-
7/28/2019 Vibration of turbine.pdf
4/4
Figure 2
eccentricity
Brg 2
Br 3
Speed :