3rd meeting on GTK electro-mechanical
integration
![Page 2: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/2.jpg)
3rd meeting on electro-mechanical integration M.Morel
2
OUTLINE• Vessel dimensions• GTK assembly carrier• Electrical connections• Cooling pipes integration• Vessel alignment with the beam • Next steps• Conclusion
3/10/2010
![Page 3: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/3.jpg)
3rd meeting on electro-mechanical integration M.Morel
3
Vacuum Vessel
3/10/2010
![Page 4: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/4.jpg)
3rd meeting on electro-mechanical integration M.Morel
4
Vacuum Vessel
Vessel 3D (GTK 1+2) drawing .
3/10/2010
![Page 5: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/5.jpg)
3rd meeting on electro-mechanical integration M.Morel
5
GTK assembly carrier
3/10/2010
![Page 6: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/6.jpg)
3rd meeting on electro-mechanical integration M.Morel
6
Integration of 10 Readout chips + Sensor with the Cooling Wafer
Cooling Wafer
SensorReadoutchip
First bond pad of 2 Readout chip could be used as references to precisely glue the sensor assembly on the cooling wafer.
Reference #1
Reference #2
3/10/2010
![Page 7: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/7.jpg)
3rd meeting on electro-mechanical integration M.Morel
7
Sensor
Readout chip
Gluing Readout chips on the cooling Wafer
Cooling Wafer
Special attention has to be taken to avoid an overflowing of glue to the readout chips pad and bump bonds.
3/10/2010
![Page 8: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/8.jpg)
3rd meeting on electro-mechanical integration M.Morel
8
GTK assembly carrier
Top view
Bottom view
3/10/2010
![Page 9: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/9.jpg)
3rd meeting on electro-mechanical integration M.Morel
93/10/2010
![Page 10: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/10.jpg)
3rd meeting on electro-mechanical integration M.Morel
10
Vessel & Carrier board outside View
3/10/2010
![Page 11: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/11.jpg)
3rd meeting on electro-mechanical integration M.Morel
11
O-ring emplacement
The aluminium support will be glued on the carrier board.Vacuum tightness will be assure with an o-ring joint.
CARRIER BOARD SUPPORT
3/10/2010
![Page 12: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/12.jpg)
3rd meeting on electro-mechanical integration M.Morel
12
Mechanical guides used duringGTK carrier insertion in the Vessel.
3/10/2010
![Page 13: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/13.jpg)
3rd meeting on electro-mechanical integration M.Morel
13
Mechanical guides
2 other rails will guide the GTK carrier inside the vessel.
3/10/2010
![Page 14: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/14.jpg)
3rd meeting on electro-mechanical integration M.Morel
14
Electrical connections to the GTK carrier
3/10/2010
![Page 15: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/15.jpg)
3rd meeting on electro-mechanical integration M.Morel
15
!! High frequency lines between The readout chips and optical transmitter modules.
µ via technology board is foreseen.
High current in the power supplies (25A)
GTK carrier specifications
3/10/2010
![Page 16: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/16.jpg)
3rd meeting on electro-mechanical integration M.Morel
16
Cross section representation
3/10/2010
![Page 17: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/17.jpg)
3rd meeting on electro-mechanical integration M.Morel
17
GND
1V2
2V5
Signals Layer
2V5A
Bonding representation between GTK carrier and a Readout chip
Fist possibility:This staircase carrier allows full planes for the power supplies.
3/10/2010
![Page 18: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/18.jpg)
3rd meeting on electro-mechanical integration M.Morel
18
Bonding representation between GTK carrier and a Readout chip
Second possibility:Pin to pin bonding
3/10/2010
![Page 19: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/19.jpg)
3rd meeting on electro-mechanical integration M.Morel
19
Bonding representation between GTK carrier and a Readout chip
Third possibility:Power supplies on bus
GND
1V22V5
Signals
3/10/2010
![Page 20: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/20.jpg)
3rd meeting on electro-mechanical integration M.Morel
20
Cooling pipe integration
3/10/2010
![Page 21: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/21.jpg)
3rd meeting on electro-mechanical integration M.Morel
21
Nano port
First possibility: Integration of the cooling pipe in the GTK carrier board
Cooling Wafer
Cooling pipe input connector
3/10/2010
![Page 22: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/22.jpg)
3rd meeting on electro-mechanical integration M.Morel
22
Second possibility: using the Aluminium support with a pressure-tight connector
Cooling pipe input connector
3/10/2010
![Page 23: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/23.jpg)
3rd meeting on electro-mechanical integration M.Morel
23
GTK Vessel&
BeamPositioning
3/10/2010
![Page 24: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/24.jpg)
3rd meeting on electro-mechanical integration M.Morel
24
GTK Vessel and XZ table
Connections with the beam pipe could be made using a bellows (Tombac) to insure enough length and low stress.
3/10/2010
![Page 25: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/25.jpg)
3rd meeting on electro-mechanical integration M.Morel
25
• Design & construct vessel prototype• Study, design & construction of assembly carrier prototype (PCB)
• Mechanical dimensions• Signal integrity (6 Gbit/s per chip)• Signal length• Routing density• Wire bonding optimization
• Straight wire bonds•Vacuum tightness
• Start study to make design compatible with vessel cooling option
Next steps
3/10/2010
![Page 26: Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697c02b1a28abf838cd8b06/html5/thumbnails/26.jpg)
3rd meeting on electro-mechanical integration M.Morel
26
Conclusion• Definition of specification started
• GTK3 needs more definition• Integration proposal worked out• Prototyping research & design can start
3/10/2010