Verona Road (US 18/151) Project - 511 WI Projects · 17.05.2012  · Project Area Stage 3 - When...

28
Verona Road (US 18/151) Project Public Informational Meeting May 17, 2012

Transcript of Verona Road (US 18/151) Project - 511 WI Projects · 17.05.2012  · Project Area Stage 3 - When...

  •        

          

    Verona Road (US 18/151) Project

    Public Informational Meeting May 17, 2012

  •      

          

    US 18/151 (Verona Road) Project

    County PD to Seminole Highway Dane County

  •  Project Area

    Stage 2 • Verona Road from County

    PD to Raymond Road • County PD between

    Hardrock Road and Commerce Park Drive

    Raymond Rd

    County PD

    Williamsburg Way

    Beltline

    Stage 1 • Verona Road between

    Raymond Road and Nakoma Road

    • Beltline between Whitney Way and Seminole Highway

    NORTH

  •   

     

     

            

     

          

    Project Area

    Stage 3 - When Needed (2031 or Later) • Freeflow interchange with directional

    ramps to the east • Freeway conversion of US 151 • One-way pair local road system • Freeway will travel within the median

    and below the frontage roads

    Williamsburg Way Grade Separated

    County PD

    Raymond Road

    Frontage Road Associated with Stage 3

    One‐way Pair Local Frontage Roads

    Ramps

    Ramps

  •                          

         

                            

                        

     

                    

     

    Why Improve Verona Road? Congestion: Significant traffic backups and delay on the Beltline and Verona Road occur daily.

    •I 39/90 ‐

    The number of vehicles that want to use the Verona Road interchange is comparable to the highest interchanges in the Madison Area – Even the interstate interchanges.

    The existing interchange was not designed to handle these volumes.

  •                             

                  

                           

         Why Improve Verona Road? Safety

    2005 to 2009 Data The Beltline Section east of Verona Road has: • Total crash rate that is 2.5 to 3.3 times the state average (depending on direction).

    • Injury crash rate of 2.3 to 4.1 times the state average (depending on direction).

  •           

     

     

                    

    Why Improve Verona Road? Pavement and Bridge Needs

    Substandard Height

    Deteriorating Pavement

    • Bridge Constructed in 1957 • Only Bridge on West Beltline Not Reconstructed/Widened

  •               

              

     

     

     

                  

         

    Stage 1 Features Third Lane Westbound Will drop at Gammon Road Exit

    Third Lane Eastbound Will Start at Whitney Way

    Noise Wall

    Noise Walls

    Noise Walls

    New Beltline Bridge 6 feet Higher to Improve Clearance

    Seminole Highway Bridge Replaced with Improved Clearance

  •        

       Single Point Urban Interchange (SPUI)

    NORTH

    SE Noise Wall

    NE Noise Wall to Seminole HighwayNew Pedestrian

    Underpass

    Stage 1 Features

  •           

    Single Point Urban Interchange (SPUI) 3 Major Movements

    NORTH

  •                   

    Single Point Urban Interchange (SPUI) Left Turns From Beltline to Verona Road

    NORTH

  •                   

    Single Point Urban Interchange (SPUI) Left Turns From Verona Road to Beltline

    NORTH

  •             

    Single Point Urban Interchange (SPUI) Verona Road Through Movements

    NORTH

  •        

       

     

       

    Stage 1 Features Single Point Urban Interchange (SPUI)

    Looking East

    EB On‐RampNB Verona Rd.

  •       Stage 1 Features

    Summit Road/Roundabout Jug‐Handle

    NORTH

    Sidewalks (Typ.)

    Bike Lanes (Typ.)

    Verona Road bridges over Roundabout

    Avalon Village

    Walgreens

    U-Haul

    Harbor Freight

    Proposed Storm Water Basin

  •       Stage 1 Features

    Summit Road/Roundabout Jug‐Handle

  •       Stage 1 Features

    Summit Road/Roundabout Jug‐Handle

  •      

       

                

              

      

     

    Stage 1 Features Pedestrian Overpass near Whenona Way

    • Replaces Existing Pedestrian Overpass

    WB Beltline EB Beltline Frontage Road

    14 Feet Structure East of the Interchange

    • Coordinated with Cannonball Trail Crossing of the Beltline

  •    

              

              

                       

              

       

    Stage 2 Features

    • County PD converted to a diamond interchange. US 151 will travel

    over County PD • US 151 expanded to

    three lanes in each direction from County PD to just south of Raymond Road

    Evaluate Intersection Alternatives

  •     

    Stage 2 Features

    County PD

    NORTH

    Possible ped/bike overpass/ underpass

    Existing Trail Connection to Remain

    US 151 Over County PD

    County PD Interchange

  • FEISFEIS

    Option 3

    Jug HandleJug Handle

    Texas UTexas U

            

    Stage 2 Features Williamsburg Way Alternatives

    FEIS

    Option 1

    Option 3Option 3

    Jug Handle

    Option 2

    Texas U

    This imag e canno t currently be displayed.

    Option 4Option 4

    Grade Separated Interchange

  •              

       Stage 3 Features Depressed Freeway

    Note: Stage 1 Single Point instead of Diamond

  •    

              

                      

                  

                   

           

     

     

     

    Eligible Noise Walls

    • 5 Noise Walls Eligible for the Project

    • Decision to implement a noise wall at a location is determined by a vote of support from benefited receptors

    • Benefited receptor receives an 8 decibel reduction in sound level

    • Total of 87 benefited receptors

    32 Receptors

    8 Receptors

    22 Receptors

    22 Receptors

    3 Receptors

  •                                                          

                                       

     

        

    Maintaining Traffic Flow • Traffic Diversion Routes – 8 outlying intersections being reviewed for improvements ‐ High Priority to Success of Project

    • Official Alternate Route established – potentially permanent • Incident Management Plan (Increased Enforcement and Assistance in Work Zone) • ITS features (Digital Message Signs and Interchange Cameras) installed early in

    project to communicate real time information to users • Public Outreach

    Alternate Route

    (Press Releases and Web Site)

  •               

              

                       

                           

                    

                 

                   

                     

                 

                       Alternate

    Route

    Anticipated Diversion Routes To ease congestion during construction, the following intersections will receive improvements in 2013.

    1. County M and County PB: Signal and turn lane extensions proposed.

    2. County M and County D (Fish Hatchery Road): Signal and turn lanes proposed.

    3. County D and Whalen Road: Turn lane and bike accommodations proposed.

    4. Seminole Highway and Lacy Road: Turn lane additions.

    5. County PD and Seminole Highway: Eastbound left turn lane extension.

    6. Seminole Highway and Sentinel Pass: Signal and turn lane extensions.

    7. Whitney Way and Gilbert: Southbound left‐turn lane extension.

    8. Seminole Highway, Yuma and Nakoma Drive: Signal and revised pavement marking.

  •              

           

               

                     

                              

           

        

    Stakeholder Involvement WisDOT Verona Road Team coordination with: Municipalities & Advisory Committees MPO for Madison General Public Property Owners Businesses & Organizations Neighborhood Groups Dane County Stakeholders Group discussing labor opportunities

    Bi‐Weekly Open Houses near corridor for continuous communication with Public

    Extensive Public Communication Plan during construction focusing on: Continuous updates of traffic lane and ramp changes Tourism/Madison Events (Badger Sporting Events) Freight Local Community access Alternate routes

  •                      

         

                         

         

       Anticipated Project Schedule

    Stage 1 (2011 to 2016) Design 2011 to 2013 Right of Way Acquisition 2011 to 2013 Construction 2014 to 2016

    Stage 2 (2013 to 2019) Design 2013 to 2015 Right of Way Acquisition 2015 to 2016 Construction 2017 to 2019

  •         

           

                

        

     

           

         

    Project Contacts Verona Road Project Team

    John Vesperman Mark Vesperman WisDOT Verona Road Project Chief WisDOT Verona Road Project Manager

    (608) 246‐3850 (608) 246‐7548 [email protected] [email protected]

    John Steiner Joe Bunker WisDOT Verona Road Project Supervisor Strand Associates ‐ Design Consultant

    (608) 246‐3862 (608) 251‐4843 [email protected] [email protected]

    Mary Heiser WisDOT Real Estate Specialist

    (608) 242‐8037 [email protected]

    For more project information visit: www.veronaroadproject.wi.gov