Venue Guide
Transcript of Venue Guide
THE BOX THAT ROCKSThe Copper Box Arena, fondly known as the ‘Box that Rocks’ during the 2012 Olympic and Paralympic Games, is the third largest arena in London and the most versatile venue in London’s Queen Elizabeth Olympic Park. It is fast establishing itself as London’s most versatile entertainment and events venue.
Handball, goalball, fencing and modern pentathlon were played at the Copper Box Arena during the Games, and now the venue plays host to other major national and international sport, including basketball, netball, badminton, boxing and martial arts.
Conferences, trade shows, product launches and TV spectaculars have all been accommodated
within the Copper Box Arena to date. Theflexible auditorium design allows the mainseating blocks to be tucked away, providing anopen pillar-free floor area of 2,712m2. Event facilities include staging, mother grid and full blackout, while backstage there is a host of production areas.
London Lions vs Iowa University 2013
Sports configurations• Badminton x 10• Basketball x 3• Handball/futsal x 3• Volleyball x 3• Netball x 3• Total area divisible into
3 halls using sport curtains• Central show court for
Basketball/handball/Futsal
Invictus Games September 2014
NATIONAL & INTERNATIONALSPORTING EVENTS
Key information:Whatever event you may be planning, the Copper Box Arena is superbly well-equipped to host it. Not only is it the venue for numerous international sporting fixtures, it’s also been designed to offer an almost infinite variety of configurations, making it possible to play everything from a single match to a major tournament, one sport or several, all at once.
There are also all the support facilities you would expect, including fully-equipped changing areas, and it can also handle a large number of spectators - up to 7,500, depending on the event. And to make the day even more exciting and memorable, there’s a first class sound system plus modern office/control/production facilities.
• 60m x 40m arena with fixed auditorium seating
• ‘Junckers’ wooden sprung floor• Concourse areas overlooking the arena• 40m x 20m Back of house area for loading/
unloading and production • Roof rigging points for production• Venue mother grid rigging system• LED videoboards
Past sporting eventsSporting InternationalEngland v Malawi – NetballGreat Britain v Spain – BasketballGreat Britain v Iceland Euro 2015 Basketball QualifierGreat Britain v Bosnia Euro 2015 Basketball QualifierBritish Fencing Sabre InternationalInvictus Games
Sporting NationalNetball Super League Final Handball Super League FinalsSurrey Storm v Herfordshire Mavericks – Netball London LiveFutsal National FinalsLegacy Cheer & Dance
CapacityMain Auditorium
Standing and seated 4,500-6,500 Seated 5,500Boxing and mixed martial arts
7,500
Basketball, netball and handball
6,000
Sports configurations• Badminton x 10• Basketball x 3• Handball/futsal x 3• Volleyball x 3• Netball x 3• Total area divisible into 3 halls using
sport curtains• Central show court for Basketball/handball/futsal
• Queuing control barriers outside of the venue• Venue house lighting – Including HD sports
lights• House PA system for announcements• 4 team style changing areas• 2 sport style locker / referee rooms with showers• On site gym• Office space for event production• Power, heating, cooling and water• Dedicated event entrance• Free WiFi 100Mbps inbound and 100Mbps
outbound
CONFERENCES &SPECIAL EVENTS
Key information:For other occasions too, the Copper Box Arena offers all you could want, whatever the size of your event. It’s designed to offer seating for up to 7,500 visitors, but also has the flexibility to cater for up to 1,200 people at a sit-down dinner, or have up to 2,000 people watching performances on the modular stage.
Behind the scenes, the facilities are just as impressive, with preparation/changing areas, a great sound system, extensive office space with free Wi-Fi, and all the production and rigging systems you need to make any kind or size of event a success.
• 60m x 40m arena with fixed auditorium seating
• Concourse areas overlooking the arena for networking
• 40m x 20m back of house area for loading / unloading and production
• Roof rigging points for production
CapacityMain Auditorium
Fully Seated Arena 5,500- 7,500Theatre style 1,500-2,000Class room 1,000Cabaret style 750-1,000Drinks reception 3,500Buffet reception 1,500Sit down dinner 1,200
• Venue mother grid rigging system• LED video boards for brand placement• Modular arena stage 60ft x 40ft x 5ft • Queuing control barriers for immediately
outside of the venue• Venue house lighting – Including HD
broadcast lights• House PA system for announcements• 4 team-style changing areas• 2 sport-style locker / referee rooms with
showers• Office space for event production• Power, heating, cooling and water• Dedicated event entrance• Free WiFi 100Mbps inbound and 100Mbps
outbound
Arena floorDimensions• With seats retracted –
L64.1m x W42.4m (2,717 m2)• With retractable seats fully extended –
L50.95m x W29.73m (1,514 m2)
Floor loadingAppendix I• 2,640lbs/m2 or 197kg/m2
(providing it is evenly spread and the floor is suitably protected)
Floor protectionThe floor system is a ‘Junckers’ wooden sprung floor, which is ideal for high performance sport. It has high shock absorbency and is perfect for international sports. It is vital, therefore, that the floor is suitably protected based on your production requirement.
The venue has a 2mm thick vinyl overlay flooring that can be laid in advance of your load-in tenancy taking place. This protects the floor from light wear and will not sustain any heavy production use.
We can offer advice for suitable alternative floor protection subject to your production, requirement. All floor loadings have to be signed off by the venue technical department.
VENUESPECIFICATIONS
Venue configurationsAppendix A: End stage seated format Appendix B: End stage standing format Appendix C: In the round seating format Appendix D: In the round standing/sport format Appendix E: Maximum theatre style flat floor formatAppendix F: Lower Bowl banqueting format Appendix G: Boxing format Appendix H: Maximum floor format
All configurations are subject to final production submission. Please note, other configurations are available.
Seating/spectators facilities• Dedicated event entrance for managed
and controlled entry• 5,781 seats with the ability for a further
1,700 flat floor seats• 3,302 upper tier seats• 371 concourse seats (Row 9)• 2,112 lower tier seats
Disabled access• 61 positions on the concourse levels
suitable for wheelchairs• Row 10 will be ring fenced by the venue as a
house manifest to satisfy disabled provision (carer goes free) and production reseats.
PowerHouse lighting• Up to 1,500 lux lighting• There are 88 light pipes to enable natural
daylight. Complete blackout valves if required.
Arena power suppliesStage Power A South West Corner• 5 x 16A Single Phase Commando• 1 x 63A 3 Phase Commando• 1 x 250A 3 Phase power lock
Stage Power B South West Corner• 3 x 16A Single Phase commando• 2 x 32A 3 Phase commando• 1 x 125A 3 Phase commando• 1 x 250A 3 Phase power lock
Stage Power C South West Corner• 1 x 400A 3 Phase power lock
North West Corner• 1 x 63A 3 Phase commando• 3 x 16A Single Phase commando
POWERSPECIFICATIONS
South East Corner• 3 x 16A Single Phase commando
North East Corner• 3 x 16A Single Phase commando
South West Bleachers• 2 x 32A Single Phase commando
North Bleachers• 17 x 16A Single Phase commando
WIFI & data points• Public 20Mbps• Production 100Mbps upload/download• 6 x hard wired data points around the
perimeter of the arena and at entrances A&B for box office and ticketing provision.
Little Mix Sport Relief 2014 (top), Frank Warren boxing 2014 (bottom left and right)
RIGGINGSPECIFICATIONS
RiggingPlease see appendices J & K for plans of the arena roof layout and mother grid.
Currently the venue does not have a preferred rigging provider, however all rigging activity that takes place must be signed off by the venue technical department and specialist rigging consultants prior to tenancy.This includes calculating the weight loading on our house beams of the rig to ensure it is structurally safe, with a structural engineer to come out and survey the rig during tenancy.
Roof Height• Clear height of 12.5m to lowest point
Loading• Up to 40 tonnes• Loading spread evenly across the roof
Mother GridThe venue has 3 grid systems running from stage end to centre floor.
Plant equipment or Cherry PickersThe Copper Box Arena can provide forklift trucks for your use at a cost to the organiser. The trucks will have to be driven by a qualified licence holder.
If you are using your own forklift trucks, please note that gas-powered trucks are not permitted inside the venue.
It is vital that the floor is suitably protected based on your production requirement.
Local plant supplier:CW Plant BarkingPhone: 020 8526 8478Email: [email protected]: 0208 526 8479
VENUESPECIFICATIONS
Barrier & cable Stage barrierDepending on your event and format, as well as the risk assessment, a barrier may be advisable.
The venue does not hold in-house barriers but can be ordered at an additional cost to the organiser.
Cable runs Cable runs can be flown from the stage end to the mixer position along the sides of the seating bays with cable hooks provided by the venue, and then across the event floor under cable ramps, to be provided by the organiser.
All cable runs must be approved by the venue manager and the local authority as necessary and in advance.
SoundAs part of the Copper Box Arena transformation to legacy venue, comprehensive enhanced acoustic project works were completed across the arena by Vaguardia.
This is to ensure that the venue is suitably amplified for music performances.
Noise managementOur premises licence states that the venue is permitted to run events where the Music Noise Levels should not exceed 75dB(A) at the agreed nearest noise sensitive premises (NSP). This would be Hackney Wick and East Village, approximately 800 yards away from the venue itself.
VENUESPECIFICATIONS
Banner sites• 1 x 20412: Lower Tier Banners 800 x 14,400mm • 1 x 20413: Lower Tier Banners 800 x 14,320mm • 1 x 20414: Lower Tier Banners 800 x 13,700mm • 1 x 20421: Lower Tier Banners 800 x 12,240mm
• 1 x 20423: Upper Tier Banners 800 x 9,000mm • 1 x 20425: Upper Tier Banners 800 x 6,935mm • 1 x 20426: Upper Tier Banners 800 x 5,080mm • 1 x 20427: Upper Tier Banners 800 x 2,900mm
All templates to be set up by designer with 5mm bleed.
Video screensThe Copper Box Arena has 2 videoboards, both positioned on level 2 concourse. One stage end and one reverse stage end.
• W6,832mm X H2,562 X D150mm• Resolution W896 x H336• Display Area 17.503m²• LED Pitch 7.62mm• LED Assortment 1 x Red, 1 x Blue, 1 x Green• Video interface DVI • Viewing Distance 5m ~ 800m
(Depending on Light Source) • Software Scanlite Editing System
(Windows Compatible)
BBC Sport Relief live broadcast 2014
The Copper Box Arena played the obvious host venue for BBC’s Sport Relief, which saw live celebrity sports challenges and performances from Kylie Minogue, Little Mix and many other big names. The main focus was to transform the Copper Box Arena from a sporting venue into a large scale TV broadcast studio by utilising the infrastructure to create a dynamic backdrop for the live event. With everything going as planned and collaborative support of the venue team, we were able to load in and load out quickly and deliver a really successful event. We very much hope to return in the future
- Jane Atkinson, BBC
“
“
StageThe Copper Box Arena has a roll and set, modular stage system to enable a variety of sizes up to a maximum of 60’ width x 40’ deep, with adjustable heights.
Each module is measured at 8’ x 4’.
We will provide sets of treads and a ramp that are compatible with this stage system.
Any major alterations to our standard stage are at the organisers cost and must be discussed further with your event manager.
The stage must not be drilled, screwed or nailed into or marked in any other way. The stage will be inspected prior to and after the event and any damage found will be repaired by the venue and costs forwarded to the organiser.
STAGINGSPECIFICATIONS
Gfintiy 2014 (top left), stage set-up (top right), Kylie Minogue live at Sport Relief 2014 (bottom)
VENUESPECIFICATIONS
Back of house productionLoading & Service Yard• 2 x service and vehicle entry points at ground
level, each 45m2.• Service yard accessible back of house to allow
vehicle parking. Permits must be displayed.• Vehicles can be displayed inside the venue on
the ground floor. Door dimensions at widest point are 2.15m W x 2.944m H.
• The service yard is capable of taking 5 arctic lorries at any one time.
Service Yard Power (Outside)East- 2 x 125A Single phase commando- 2 x 63A Single phase commando- 4 x 32A Single phase commando- 4 x 16A Single phase commando
West- 2 x 125A Single phase commando- 2 x 63A Single phase commando- 4 x 32A Single phase commando- 4 x 16A Single phase commando
LV Switch Room- 1 x 63A Single Phase commando
Appendix L From top to bottom: BBC Sport Relief 2014, Invictus Games 2014, Launch of Fiat 500 X 2015, Teen Tech 2014
VENUESPECIFICATIONS
Dressing Rooms & FurnishingsThere are a total of 4 dressing rooms with en-suite shower facilities and WiFi available in each. Any alcohol served in the dressing rooms must be provided by BH Live.
StoragePlease note that there is limited storage space available on site during your tenancy, which can be discussed with your event manager. Storing equipment outside of the contracted venue hire period is not permitted.
Media & BroadcastThere is space within the loading bay (South East) for your outside broadcast trucks to park and there will be various patch boards around the venue to avoid the need for long cable runs.
Crew CateringYou may provide your own crew catering at the Copper Box Arena. The use of LPG gas is permitted in the service yard, at a dedicated point, providing it is housed on board the catering unit in a fire-resistant cylinder cabinet. A waste water bowser will be required at the organisers expense. A temporary fresh drinking water tap can be supplied from just inside backstage to run a hose to the catering unit in the service yard.
Parking FacilitiesThere are 14 dedicated blue badge parking bays outside the front of the Copper Box Arena.
Multi-story car park tariff:0-1 hour Free1-2 hours £1.502-3 hours £3.003-5 hours £5.005-8 hours £8.008-24 hours £15
Emergency proceduresEmergency instructions will be issued to you in advance and on the day of the event. As the organiser you will play a vital role in the venue’s emergency procedures so you must familiarise yourself with these documents and include them in any staff briefings.
Show stop proceduresThe Event Manager will get a message from the Operations Control Room that there is an incident in the arena. After investigating the incident, the Event Manager will decide whether to stand down and continue as normal or evacuate the arena.
If the latter is decided, then they will inform the organiser either by mobile phone, radio or face to face to discuss the need to evacuate the building. The organiser will then need to inform the production manager to stop the show immediately and inform all crew to evacuate. The backstage security supervisor will assist in
VENUESPECIFICATIONS
taking people in the backstage area to a place of safety. The Duty Manager will then make a live announcement and the security supervisors and stewards will commence evacuation of the front of house areas.
Medical provisionsOur recommended partner is Paramedico. All staff are fully trained and qualified. Paramedics can offer first aid services through to ambulance, paramedic and doctor.
Security & PolicingEntrance PolicySecurity spot checks and bag searches may be carried out on patrons entering the main entrance of the venue. Prohibited items include, but are not limited to: glass, tools, fireworks, darts, scissors, blades, knives, air horns, alcohol, flag poles, banners, radios, bottles, cans, fire arms, narcotics and any other item that security deem unsafe and a potential danger.
Front of House Stewarding & SecurityOur recommended partner is Wise Security Services, one of the UK’s most trusted and professional suppliers of stewards and security staff. All staff are trained and experienced in handling all types of security operations, and take a pro-active approach to providing the best security solution for you. You would be responsible for paying for event security; your Event Manager can introduce you directly to obtain a quote specific to your event.
Artiste personal securityAny artiste security officer that is working at the venue must have the appropriate SIA-approved qualifications. Their SIA licence must be made available to the Event Manager upon request.
Backstage passesThis area will be managed as a private area with passes agreed with the organiser as accreditation.
The venue management team will require 15 house passes for accredited event staff, allocated by our appointed Event manager.
CurfewsLive music can be played from 08.00 to 23.00 Monday to Saturday and 08.00 to 22.30 on a Sunday. The venue can apply for an extension until 02.00 Premises licence.
The premises licence operates from 07.00 – 23.00 and alcohol can be served from 07.00 – 00.00. Extensions can be applied for which will allow the licence to operate until 02.00.
VENUESPECIFICATIONS
The venue offers versatility both front and back of house, as it comes as a blank canvas and this gave us the opportunity to be creative and bring to life the Fiat 500X within the space. Using the existing facilities within the venue we could build on what was already present and ensure that we maximised all the budget.- Jason Worsley, Lodestar Events
“ “
Industry StandardsThe Copper Box Arena uses the events industry E & A Guides to ensure best practice, standards of service and a safe environment.
This also ensures consistent standards that will improve organisers’ experiences when using our venue.
The A Guide provides guidance for production-type events. It defines consistent health, safety and operational standards for event planning and management. It also represents compliance with UK Law.
Planning meetingsYour Event Manager will be appointed to you when the contracts have been signed and returned. Your Event Manager will contact you to start the planning process, which works to the following timelines:
• 8 weeks prior – client provides event management plan
• 6 weeks prior – safety and operations meeting• 4 weeks prior – final production planning
meeting• 4 weeks prior – venue circulates internal
general instruction
Check & ChallengeThe organiser is responsible for providing all paper work relating to their event no later than 4 weeks prior to tenancy:
• Public Liability Insurance Certificate minimum cover £10million
• Public Liability Schedule• Employee Liability Insurance Certificate
minimum cover £10million• Employee Liability Schedule• Event Risk Assessment
Booking ProceduresAll enquiries for the Copper Box Arena are subject to completion of a full event profile form. The following information will be required:• Nature of the event• Artist (if applicable)• Audience profile• Comparison to other events• Applicants previous event experience and
capabilities (trade references will be required)
• Run schedule and timings• Sample ticket (access control) In addition we will also require the following information from all contractors:
Public Liability Insurance Certificate minimum cover £10millionPublic Liability ScheduleEmployee Liability Insurance cover £10millionEmployee Liability ScheduleRisk AssessmentMethod Statements/RAMSBuild schedule
VENUE POLICIES& MANAGEMENT
Past eventsSporting InternationalEngland v Malawi NetballGreat Britain v Spain BasketballGreat Britain v Iceland Euro 2015 – Basketball QualifierGreat Britain v Bosnia Euro 2015 – Basketball QualifierBritish Fencing Sabre InternationalInvictus Games
Sporting NationalNetball Super League FinalHandball Super League FinalsSurrey Storm v Hertfordshire Mavericks – Netball London LiveFutsal National Finals
Entertainment Pret-a-Manger Conference and Awards DinnerHighways Agency Conference and Awards DinnerToni & Guy Fashion Show Gfinity European Gaming ChampionshipsInvictus Games LaunchCommonwealth Games Torch RelayCruz Beckham’s 8th Birthday PartyWeetabix Ultimate Sports day with Mo Farah Launch of Fiat 500 X with Magician Dynamo
PAST EVENTS APPENDICESAppendix AFlat floor seating with lower bowl seating extended
APPENDICES APPENDICESAppendix DSports format
Appendix EFlat floor seating layout with lower bowl rear seats extended
APPENDICES APPENDICESAppendix GFlat floor seating layout – boxing/MMA configuration
Appendix HAll standing layout
Appendix IFloor loading limits
Appendix IPower layout
FOP South West Corner
Stage Power A (250A supply)• 5x 16A single phase commando• 1x 63A three phase commando• 1x 250A three phase power lock
Stage Power B (250A supply)• 3x 16A single phase commando• 2x 32A single phase commando• 1x 125A three phase commando• 1x 250A three phase power lock
Stage Power C (400A supply)• 1x 400A three phase power lock
FOP North West Corner• 1x 63A three phase commando• 1x 63A three phase commando
FOP South East Corner• 3x 16A single phase commando
FOP North East Corner• 3x 16A single phase commando
South West Bleachers• 2x 32A single phase commando
APPENDICES APPENDICESNorth Bleachers• 17x 16A single phase commando
Back Carpark (outside)East (250A supply)• 2x 125A single phase commando• 2x 63A single phase commando• 4x 32A single phase commando• 4x 16A single phase commando
West (250A supply)• 2x 125A single phase commando• 2x 63A single phase commando• 4x 32A single phase commando• 4x 16A single phase commando
LV Switch Room• 1x 63A three phase commando
Appendix IPower layout
APPENDICESAppendix J, K, LRigging layout & Truss configuration
APPENDICES
This drawing/document is COPYRIGHT and property ofStar Events Group Ltd. It must not be copied (in whole or in part),used for manufacture or otherwise disclosed without the writtenconsent of the company.Any copies of this drawing/document made by any method mustinclude this legend.
DO NOT SCALE this drawing.
General Notes
All dimensions mm unless indicated otherwise.All critical dimensions should be checked on site.
All loads indicated are NOT factored.
Loads shown = kg
The following information has been used in thepreparation of this drawing :-...
If in doubt, ASK!
eventsSTAR
group
1 2 3 4 5 6
A
B
C
D Milton RoadThurleigh
Bedford MK44 2DFTel: +44 (0)1234 772233Fax: +44 (0)1234 772272
www.StarEventsGroup.com
STARrigging
13-8991-01a
DescriptionRev
a Updated suspension details
-
-
-
-
Date
20-03-13
By
MNC
-
-
-
-
368 26
6
266
C21
C24
B73
B65
C21
C21
C25C25
C20C20
C21
C21
C21
C21
C21
C21
C21
C21
B74
B68
B66
B66
B68
B68
B68
B74
B74
B71
B66 B
82
B78
B78
B78
B78
B78
B78
B78
B78
B82
B82
B66
C22
B83
B83
B83
B83
B83
B83
B83
B83
B65
B65
B65
B65
B65
B65
B86B72B72B72
B72 B72
B85 B85 B85
B85 B85 B85
B85
B85B85
B85
B85
B85
B85
B85
B85
B72 B72 B72
B72 B72 B72
B72 B72 B72
B82
B66
B66
B85 B85
B75
B75
B75 B75
B75 B75 B75
B85
B75
B70B70 B70B70 B70B70
B70B70 B70B70 B70B70
B76
B76
B76
B76
B76
B76
B76
B76
B76
B76
B70B70
B70B70
B70B70
B70 B70
B65
B65
B65B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B86
B86
B86
B86
B75
B75
C26
C26
B75 B75B75B75
B87
B87
B87
B75
B87
C26C26
B75
B75C26
7595
B65 B65
B65
B67
B67B65B65
B65B65
B65 B65
B65B65
B82 B82
B72B72B72B72 B72C22C22
B71B74B71 B74
C21C21
B73
B73
B73 B73
B73
B73
B73
B73
B66B66B66
B69B69
B69
B69B69
B72B72
B72
B72B72
B73
B66B66B66
B73
C21C21C21C21
C21 C21 C21 C21 C21 C21 C21 C21
C23 C24 C24 C24 C24 C23
41601 2 13
B
A
1412111098765432022 659058106940900090009000900090006940416058104040
5610
B3
B75 C26
B75
B87
B75
B87
B75
B87
B87
B75B75
C26
B68
C26
B75
B75
B65
B65
B65
B65
B65
B67
B65
B65
B65
B65
B65
B65
B65B65B65
B65B65
B65B65
B65B65
B70 B70
B70B70
B70B70
B70B70
B76
B76
B76
B76
B76
B76
B76
B76
B76
B76
B70 B70B70 B70
B70 B70B70 B70
B75
B85
B75
B85
B75B75 B75
B75
B66
B74
B74 B71
B82
B82
B82
B72B72
B72B72
B72B72
B85
B85
B85
B85
B85
B85
B85 B85
B85B85
B72 B72
B72 B72
B72
B78
B72
B65
B65
B65
B65
B65
B65
B65
B83
B83
B83
B83
B83
B83
B83
B83
C22
B74
B66
B66
B68
B68
B78
B78
B66
B78
B78
B78
B78
B66
B82
B82
B66
C21
C21
C21
C21
B68
C21
C21
C21
B66B66B66
B82
B69B69
B73
B73
B73
B73
B72B72
C24 C23
C21C21C21C21C21
C25
C20
C20
C25
B65 B65
B65
B67
B82C21
B69B69B69
B73
B73
B73
B73
B73
B72B72B72B66B66B66
C23 C24 C24
C21
C21C21C21C21C21
M
1925
7590
C
H
D
J
L
K
G
F
E
4360
5090
9000
9000
9000
5090
4360
5610
A1 A5
A2 A6
A3 A7
A4 A8
represents steel beam to support 10kN CPL.
represents steel beam to support 10kN CPL.
Appendix J, K, LRigging layout & Truss configuration
Appendix J, K, LRigging layout & Truss configuration
APPENDICES APPENDICES
This drawing/document is COPYRIGHT and property ofStar Events Group Ltd. It must not be copied (in whole or in part),used for manufacture or otherwise disclosed without the writtenconsent of the company.Any copies of this drawing/document made by any method mustinclude this legend.
DO NOT SCALE this drawing.
General Notes
All dimensions mm unless indicated otherwise.All critical dimensions should be checked on site.
All loads indicated are NOT factored.
Loads shown = kg
The following information has been used in thepreparation of this drawing :-...
If in doubt, ASK!
eventsSTAR
group
1 2 3 4 5 6
A
B
C
D Milton RoadThurleigh
Bedford MK44 2DFTel: +44 (0)1234 772233Fax: +44 (0)1234 772272
www.StarEventsGroup.com
STARrigging
13-8991-02
DescriptionRev
-
-
-
-
DateBy
-
-
-
-
368 26
6
266
C21
C24
B73
B65
C21
C21
C25C25
C20C20
C21
C21
C21
C21
C21
C21
C21
C21
B74
B68
B66
B66
B68
B68
B68
B74
B74
B71
B66 B
82
B78
B78
B78
B78
B78
B78
B78
B78
B82
B82
B66
C22
B83
B83
B83
B83
B83
B83
B83
B83
B65
B65
B65
B65
B65
B65
B86B72B72B72
B72 B72
B85 B85 B85
B85 B85 B85
B85
B85B85
B85
B85
B85
B85
B85
B85
B72 B72 B72
B72 B72 B72
B72 B72 B72
B82
B66
B66
B85 B85
B75
B75
B75 B75
B75 B75 B75
B85
B75
B70B70 B70B70 B70B70
B70B70 B70B70 B70B70
B76
B76
B76
B76
B76
B76
B76
B76
B76
B76
B70B70
B70B70
B70B70
B70 B70
B65
B65
B65B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B65
B86
B86
B86
B86
B75
B75
C26
C26
B75 B75B75B75
B87
B87
B87
B75
B87
C26C26
B75
B75C26
7595
B65 B65
B65
B67
B67B65B65
B65B65
B65 B65
B65B65
B82 B82
B72B72B72B72 B72C22C22
B71B74B71 B74
C21C21
B73
B73
B73 B73
B73
B73
B73
B73
B66B66B66
B69B69
B69
B69B69
B72B72
B72
B72B72
B73
B66B66B66
B73
C21C21C21C21
C21 C21 C21 C21 C21 C21 C21 C21
C23 C24 C24 C24 C24 C23
41601 2 13
B
A
1412111098765432022 659058106940900090009000900090006940416058104040
5610
B3
B75 C26B
75
B87
B75
B87
B75
B87
B87
B75B75
C26
B68
C26
B75
B75
B65
B65
B65
B65
B65
B67
B65
B65
B65
B65
B65
B65
B65B65B65
B65B65
B65B65
B65B65
B70 B70
B70B70
B70B70
B70B70
B76
B76
B76
B76
B76
B76
B76
B76
B76
B76
B70 B70B70 B70
B70 B70B70 B70
B75
B85
B75
B85
B75B75 B75
B75
B66
B74
B74 B71
B82
B82
B82
B72B72
B72B72
B72B72
B85
B85
B85
B85
B85
B85
B85 B85
B85B85
B72 B72
B72 B72
B72
B78
B72
B65
B65
B65
B65
B65
B65
B65
B83
B83
B83
B83
B83
B83
B83
B83
C22
B74
B66
B66
B68
B68
B78
B78
B66
B78
B78
B78
B78
B66
B82
B82
B66
C21
C21
C21
C21
B68
C21
C21
C21
B66B66B66
B82
B69B69
B73
B73
B73
B73
B72B72
C24 C23
C21C21C21C21C21
C25
C20
C20
C25
B65 B65
B65
B67
B82C21
B69B69B69
B73
B73
B73
B73
B73
B72B72B72B66B66B66
C23 C24 C24
C21
C21C21C21C21C21
M
1925
7590
C
H
D
J
L
K
G
F
E
4360
5090
9000
9000
9000
5090
4360
5610
represents steel beam to support10kN CPL by others.
represents steel beam to support10kN CPL by others.
represents steel beam to support 3 No.10kN PL, by others.
These location of these 4 points is indicative andsubject to movement during finalised design
A1 A5
A2 A6
A3 A7
A4 A8
B1 B5
B2 B6
B3 B7
B4 B8
C1 C5
C2 C6
C3 C7
C4 C8
D1
D2
D3
D4
A1 A5
A2 A6
A3 A7
A4 A8
B1 B5
B2 B6
B3 B7
B4 B8
C1 C5
C2 C6
C3 C7
C4 C8
D1
D2
D3
D4
A1 A5
A2 A6
A3 A7
A4 A8
B1 B5
B2 B6
B3 B7
B4 B8
C1 C5
C2 C6
C3 C7
C4 C8
D1
D2
D3
D4
HOW TO FIND USAppendix NDressing rooms
APPENDICES
090123_Legacy_Ground floor plan.dgn 2/9/2009 2:39:55 PM Make Limited 2007
For more information about the copper box arena, including travel, please visit our website www.better.org.uk
Queen Elizabeth Olympic Park has some of the best transport links in London:
• Nine tube and train links• Numerous bus and coach routes• Less than 40 minutes to all of London’s major
railway stations• Seven minutes to St Pancras International• 30 minutes to the M25• Less than an hour to all London international
airports from Stratford station
Public transport is the best and easiest way to get to and from the Park – by train, underground, bus or bicycle.
HotelsHotels in Stratford:5 minutes to the Copper Box Arena• 5 hotels• 850 rooms• 162 apartments
Name No. of rooms Star rating
Holiday Inn London - Stratford City 188 4 star
Marlin Stratford 162 4 star
Staybridge Suites 111 4 star
The Westbridge Hotel 80 4 star
Premier Inn Stratford 267 3 star
Holiday Inn Express - Stratford 153 3 star
For non sporting event enquiries, contact:
Jennie DoubleCommercial Events Director, Copper Box Arena & London Aquatics CentreT: 020 8221 4925M: 07580 [email protected]
For all sporting event enquiries, contact:
Russ BarnesGeneral Manager, Copper Box ArenaT: 020 8221 4902M: 07772 223251
www.better.org.uk/leisure/copper-box-arena/venue_hire