7/23/2019 Venki Kalipalayam 37 40 http://slidepdf.com/reader/full/venki-kalipalayam-37-40 1/76 Metal Lead Km 6/10- 7/700 Metal Lead Inplains Cart Track 0/0 - 0/2 0.20 Km Kamanaichenpalayam - Annur 16/6 - 13/2 3.40 Km NH 319/0 - 31/4 1.60 Km Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km &enkittapuram - Kalipalayam !$a% 9/0 - /00 1.30 Km '$rkin# (aila#e Km 6/10 - /00 0.3) Km  TOTAL 11.04Km (or) 11.00Km BitumenLeadtoMidPoint Km 6/10- 7/700 BitumenLeadtoMidPoint Inplains *r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km ATC 99/6 - 40/0 )9.60 Km Kamanaichenpalayam - Annur 0/0 - 13/2 13.20 Km NH 319/0 - 31/4 1.60 Km Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km &enkittapuram - Kalipalayam !$a% 9/0 - /00 1.30 Km '$rkin# (aila#e Km 6/10 - /00 0.3) Km  TOTALA 226.99Km (or) 227.00Km BitumentoCMPLead Km 6/10- 7/700 BitumentoCMPLead Inplains *r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km ATC 99/6 - 2/4 1.20 Km alla%am $ur !$a% t$ &a%u#apalayam 0/ 0 - 0/6 0.60 Km alla%am Aina"hi ulliampatti 0/0 - /0 .00 Km CT t$ C( ite 0.20 Km  TOTAL 226.75Km (or) 227.00Km CMPtoSiteLead Km 6/10- 7/700 CMPtoSiteLead Inplains Cart Track 0/0 - 0/2 0.20 Km Km 19/6 $ aina"hi c$chin r$a% t$ &alaith$ttathu Ayyank$il 6/4 - 9/ 3.40 Km alla%am - $$malur !$a% 11/0 - /0 9.00 Km Km 2/0 - $ alla%am $$malur r$a% t$ Kalielampatti 1.60 Km 2.60 Km &enkittapuram - Kalipalayam !$a% /0 0.00 Km '$rkin# (aila#e Km 6/10 - /00 0.3) Km  TOTALA 17.15Km Km 310/4 $ Nai#ai C$$%al$re- (y"$re !$a% t$ emmipalayam ia5 Kalielampatti Km 1/6 - 4/2

Transcript of Venki Kalipalayam 37 40

Page 1: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 1/76

Metal Lead

Km 6/10 - 7/700

Metal Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Kamanaichenpalayam - Annur 16/6 - 13/2 3.40 Km

NH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /00 1.30 Km'$rkin# (aila#e Km 6/10 - /00 0.3) Km

 TOTAL 11.04 Km

(or) 11.00 Km

Bitumen Lead to Mid PointKm 6/10 - 7/700

Bitumen Lead to Mid Point In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km

ATC 99/6 - 40/0 )9.60 Km

Kamanaichenpalayam - Annur 0/0 - 13/2 13.20 KmNH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /00 1.30 Km

'$rkin# (aila#e Km 6/10 - /00 0.3) Km

 TOTAL A 226.99 Km

(or) 227.00 Km

Bitumen to CMP LeadKm 6/10 - 7/700

Bitumen to CMP Lead In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) KmATC 99/6 - 2/4 1.20 Km

alla%am $ur !$a% t$ &a%u#apalayam 0/ 0 - 0/6 0.60 Km

alla%am Aina"hi ulliampatti 0/0 - /0 .00 Km

CT t$ C( ite 0.20 Km

 TOTAL 226.75 Km

(or) 227.00 Km

CMP to Site LeadKm 6/10 - 7/700

CMP to Site Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Km 19/6 $ aina"hi c$chin r$a% t$ &alaith$ttathu Ayyank$il 6/4 - 9/ 3.40 Km

alla%am - $$malur !$a% 11/0 - /0 9.00 Km

Km 2/0 - $ alla%am $$malur r$a% t$ Kalielampatti 1.60 Km

2.60 Km

&enkittapuram - Kalipalayam !$a% /0 0.00 Km

'$rkin# (aila#e Km 6/10 - /00 0.3) Km

 TOTAL A 17.15 Km

Km 310/4 $ Nai#ai C$$%al$re- (y"$re !$a% t$ emmipalayam ia5Kalielampatti Km 1/6 - 4/2

Page 2: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 2/76

(or) 17.00 Km

Page 3: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 3/76

Emulsion Lead (Irungattukottai)

Km 6/10 - 7/700 In plains

ipc$t !$a% Km 0/0 - 2/0 2.00 Km

rrunkattuk$ttai t$ !anipettai r$a% km 112/4 - 34/ .60 Km

Kri"hna#iri !anipettai !$a% Km 14)/4 - 49/2 96.20 Km

alem Thiruppattur - &aniyam,a%i r$a% Km 124/ - 0/0 124.0 Km

alem 7lun%erpet !$a% km /4 - )/6 2.0 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 KmNH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.40 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

'$rkin# (aila#e Km 6/10 - /00 0.3) Km

 TOTAL 452.50 Km(or) 453.00 Km

Bitumen Lead (Manali)

Km 6/10 - 7/700 In plains

 T !$a% 2/6 - 1/6 1.00 Km

(anali t$ (athur !$a% 0/0 - )/ ).0 Km

(a%haaram hill" !$a% 0/0 - 4/6 4.60 Km

NH ) Km 11/0 - 11/) 0.)0 Km

Chennai yepa"" km 0/0 - 32/2 32.20 Km

ulal t$ Tham,aram T$tal ;i"tance 44.00 Km

Chennai ye pa"" !$a% $int" at Km 2/0 $ :T !$a% NH 4)5

NH 4) Km 2/0 - 19/4 169.40 Km

NH 6 Km 134/2 - )/6 12.60 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 Km

NH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.60 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

'$rkin# (aila#e Km 6/10 - /00 0.3) Km

 TOTAL 491.30 Km

(or) 491.00 Km

3.00

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Page 4: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 4/76

Metal Lead

Km 7/700 - 8/2

Metal Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Kamanaichenpalayam - Annur 16/6 - 13/2 3.40 Km

NH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /2 0.0 Km'$rkin# (aila#e Km /00 - /2 0.2) Km

 TOTAL 10.44 Km

(or) 10.00 Km

Bitumen Lead to Mid PointKm 7/700 - 8/2

Bitumen Lead to Mid Point In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km

ATC 99/6 - 40/0 )9.60 Km

Kamanaichenpalayam - Annur 0/0 - 13/2 13.20 KmNH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /2 0.0 Km

'$rkin# (aila#e Km /00 - /2 0.2) Km

 TOTAL A 226.39 Km

(or) 226.00 Km

Bitumen to CMP LeadKm 7/700 - 8/2

Bitumen to CMP Lead In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) KmATC 99/6 - 2/4 1.20 Km

alla%am $ur !$a% t$ &a%u#apalayam 0/ 0 - 0/6 0.60 Km

alla%am Aina"hi ulliampatti 0/0 - /0 .00 Km

CT t$ C( ite 0.20 Km

 TOTAL 226.75 Km

(or) 227.00 Km

CMP to Site LeadKm 7/700 - 8/2

CMP to Site Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Km 19/6 $ aina"hi c$chin r$a% t$ &alaith$ttathu Ayyank$il 6/4 - 9/ 3.40 Km

alla%am - $$malur !$a% 11/0 - /0 9.00 Km

Km 2/0 - $ alla%am $$malur r$a% t$ Kalielampatti 1.60 Km

2.60 Km

&enkittapuram - Kalipalayam !$a% /0 - /00 0.0 Km

'$rkin# (aila#e Km /00 - /2 0.2) Km

 TOTAL A 17.75 Km

Km 310/4 $ Nai#ai C$$%al$re- (y"$re !$a% t$ emmipalayam ia5Kalielampatti Km 1/6 - 4/2

Page 5: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 5/76

(or) 18.00 Km

Page 6: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 6/76

Emulsion Lead (Irungattukottai)

Km 7/700 - 8/2 In plains

ipc$t !$a% Km 0/0 - 2/0 2.00 Km

rrunkattuk$ttai t$ !anipettai r$a% km 112/4 - 34/ .60 Km

Kri"hna#iri !anipettai !$a% Km 14)/4 - 49/2 96.20 Km

alem Thiruppattur - &aniyam,a%i r$a% Km 124/ - 0/0 124.0 Km

alem 7lun%erpet !$a% km /4 - )/6 2.0 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 KmNH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.40 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /00 0.0 Km

'$rkin# (aila#e Km /00 - /2 0.2) Km TOTAL 453.10 Km

(or) 453.00 Km

Bitumen Lead (Manali)

Km 7/700 - 8/2 In plains

 T !$a% 2/6 - 1/6 1.00 Km

(anali t$ (athur !$a% 0/0 - )/ ).0 Km

(a%haaram hill" !$a% 0/0 - 4/6 4.60 Km

NH ) Km 11/0 - 11/) 0.)0 Km

Chennai yepa"" km 0/0 - 32/2 32.20 Km

ulal t$ Tham,aram T$tal ;i"tance 44.00 Km

Chennai ye pa"" !$a% $int" at Km 2/0 $ :T !$a% NH 4)5

NH 4) Km 2/0 - 19/4 169.40 Km

NH 6 Km 134/2 - )/6 12.60 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 Km

NH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.60 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /00 0.0 Km

'$rkin# (aila#e Km /00 - /2 0.2) Km

 TOTAL 491.90 Km

(or) 492.00 Km

39.00

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Page 7: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 7/76

Metal Lead

Km 8/2 - 8/4

Metal Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Kamanaichenpalayam - Annur 16/6 - 13/2 3.40 Km

NH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /4 0.60 Km'$rkin# (aila#e Km /2 - /4 0.10 Km

 TOTAL 10.09 Km

(or) 10.00 Km

Bitumen Lead to Mid PointKm 8/2 - 8/4

Bitumen Lead to Mid Point In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km

ATC 99/6 - 40/0 )9.60 Km

Kamanaichenpalayam - Annur 0/0 - 13/2 13.20 KmNH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 - /4 0.60 Km

'$rkin# (aila#e Km /2 - /4 0.10 Km

 TOTAL A 226.04 Km

(or) 226.00 Km

Bitumen to CMP LeadKm 8/2 - 8/4

Bitumen to CMP Lead In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) KmATC 99/6 - 2/4 1.20 Km

alla%am $ur !$a% t$ &a%u#apalayam 0/ 0 - 0/6 0.60 Km

alla%am Aina"hi ulliampatti 0/0 - /0 .00 Km

CT t$ C( ite 0.20 Km

 TOTAL 226.75 Km

(or) 227.00 Km

CMP to Site LeadKm 8/2 - 8/4

CMP to Site Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Km 19/6 $ aina"hi c$chin r$a% t$ &alaith$ttathu Ayyank$il 6/4 - 9/ 3.40 Km

alla%am - $$malur !$a% 11/0 - /0 9.00 Km

Km 2/0 - $ alla%am $$malur r$a% t$ Kalielampatti 1.60 Km

2.60 Km

&enkittapuram - Kalipalayam !$a% /0 - /2 1.20 Km

'$rkin# (aila#e Km /2 - /4 0.10 Km

 TOTAL A 18.10 Km

Km 310/4 $ Nai#ai C$$%al$re- (y"$re !$a% t$ emmipalayam ia5Kalielampatti Km 1/6 - 4/2

Page 8: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 8/76

(or) 18.00 Km

Page 9: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 9/76

Emulsion Lead (Irungattukottai)

Km 8/2 - 8/4 In plains

ipc$t !$a% Km 0/0 - 2/0 2.00 Km

rrunkattuk$ttai t$ !anipettai r$a% km 112/4 - 34/ .60 Km

Kri"hna#iri !anipettai !$a% Km 14)/4 - 49/2 96.20 Km

alem Thiruppattur - &aniyam,a%i r$a% Km 124/ - 0/0 124.0 Km

alem 7lun%erpet !$a% km /4 - )/6 2.0 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 KmNH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.40 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /2 1.20 Km

'$rkin# (aila#e Km /2 - /4 0.10 Km TOTAL 453.45 Km

(or) 453.00 Km

Bitumen Lead (Manali)

Km 8/2 - 8/4 In plains

 T !$a% 2/6 - 1/6 1.00 Km

(anali t$ (athur !$a% 0/0 - )/ ).0 Km

(a%haaram hill" !$a% 0/0 - 4/6 4.60 Km

NH ) Km 11/0 - 11/) 0.)0 Km

Chennai yepa"" km 0/0 - 32/2 32.20 Km

ulal t$ Tham,aram T$tal ;i"tance 44.00 Km

Chennai ye pa"" !$a% $int" at Km 2/0 $ :T !$a% NH 4)5

NH 4) Km 2/0 - 19/4 169.40 Km

NH 6 Km 134/2 - )/6 12.60 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 Km

NH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.60 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /2 1.20 Km

'$rkin# (aila#e Km /2 - /4 0.10 Km

 TOTAL 492.25 Km

(or) 492.00 Km

39.00

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Page 10: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 10/76

Metal Lead

Km 8/4 - 9/0

Metal Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Kamanaichenpalayam - Annur 16/6 - 13/2 3.40 Km

NH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 0.00 Km'$rkin# (aila#e Km /4 - 9/0 0.30 Km

 TOTAL 9.69 Km

(or) 10.00 Km

Bitumen Lead to Mid PointKm 8/4 - 9/0

Bitumen Lead to Mid Point In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) Km

ATC 99/6 - 40/0 )9.60 Km

Kamanaichenpalayam - Annur 0/0 - 13/2 13.20 KmNH 319/0 - 31/4 1.60 Km

Karanampattai - !a"a#$un%enpalayam !$a% 0/0 - 4/190 4.19 Km

&enkittapuram - Kalipalayam !$a% 9/0 0.00 Km

'$rkin# (aila#e Km /4 - 9/0 0.30 Km

 TOTAL A 225.64 Km

(or) 226.00 Km

Bitumen to CMP LeadKm 8/4 - 9/0

Bitumen to CMP Lead In plains

*r$m !e+nery t$ Tamil na%u ,$r%er 146.) KmATC 99/6 - 2/4 1.20 Km

alla%am $ur !$a% t$ &a%u#apalayam 0/ 0 - 0/6 0.60 Km

alla%am Aina"hi ulliampatti 0/0 - /0 .00 Km

CT t$ C( ite 0.20 Km

 TOTAL 226.75 Km

(or) 227.00 Km

CMP to Site LeadKm 8/4 - 9/0

CMP to Site Lead In plains

Cart Track 0/0 - 0/2 0.20 Km

Km 19/6 $ aina"hi c$chin r$a% t$ &alaith$ttathu Ayyank$il 6/4 - 9/ 3.40 Km

alla%am - $$malur !$a% 11/0 - /0 9.00 Km

Km 2/0 - $ alla%am $$malur r$a% t$ Kalielampatti 1.60 Km

2.60 Km

&enkittapuram - Kalipalayam !$a% /0 - /4 1.40 Km

'$rkin# (aila#e Km /4 - 9/0 0.30 Km

 TOTAL A 18.50 Km

Km 310/4 $ Nai#ai C$$%al$re- (y"$re !$a% t$ emmipalayam ia5Kalielampatti Km 1/6 - 4/2

Page 11: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 11/76

(or) 19.00 Km

Page 12: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 12/76

Emulsion Lead (Irungattukottai)

Km 8/4 - 9/0 In plains

ipc$t !$a% Km 0/0 - 2/0 2.00 Km

rrunkattuk$ttai t$ !anipettai r$a% km 112/4 - 34/ .60 Km

Kri"hna#iri !anipettai !$a% Km 14)/4 - 49/2 96.20 Km

alem Thiruppattur - &aniyam,a%i r$a% Km 124/ - 0/0 124.0 Km

alem 7lun%erpet !$a% km /4 - )/6 2.0 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 KmNH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.40 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /4 1.40 Km

'$rkin# (aila#e Km /4 - 9/0 0.30 Km TOTAL 453.85 Km

(or) 454.00 Km

Bitumen Lead (Manali)

Km 8/4 - 9/0 In plains

 T !$a% 2/6 - 1/6 1.00 Km

(anali t$ (athur !$a% 0/0 - )/ ).0 Km

(a%haaram hill" !$a% 0/0 - 4/6 4.60 Km

NH ) Km 11/0 - 11/) 0.)0 Km

Chennai yepa"" km 0/0 - 32/2 32.20 Km

ulal t$ Tham,aram T$tal ;i"tance 44.00 Km

Chennai ye pa"" !$a% $int" at Km 2/0 $ :T !$a% NH 4)5

NH 4) Km 2/0 - 19/4 169.40 Km

NH 6 Km 134/2 - )/6 12.60 Km

eelanayakkanpatti ye pa"" NH ye pa""5 Km 0/0 - /2 .20 Km

alem - (a%urai !$a% 20/6 - 20)/2 2.40 Km

NH 4 Km 0/0 - /0 .00 Km

erun%urai T$8n r$a% K( 0/0 -/1 H 71115 .10 Km

NH 4 Km 4/6 - 90/ 6.20 Km

 Tirupur-&iayaman#alam !$a% 0/0 - 24/4H-19A5 24.60 Km

1).10 Km

Na#ai - :u%alur - (y"$re 306/2)0 - 310/4 4.1) Km

Km 310/4 $ N:( emmipalayam ia5 Kalielampatti 0/0 - 4/2 4.20 Km

&enkittapuram - Kalipalayam !$a% /0 - /4 1.40 Km

'$rkin# (aila#e Km /4 - 9/0 0.30 Km

 TOTAL 492.65 Km

(or) 493.00 Km

39.00

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Aina"hi-Tirupur-alla%am-$llachi-C$chinia5 (eenkarai r$a% km 12/2-2/300

Page 13: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 13/76

Estim

Description No.

1

Km 7/0 - 9/0 1 x 1 685.00 2.00

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 2.00

2

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

3

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM

(ODR)

SI.

No.

Length

(m)

 Width

(m)

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.

Gravel Filling including cost and conveyance including labour ch

 watering tamping under opumum moisture content to get the maxi

charges etc., complete With a lead of 1Km

Granular Sub-base with Graded Material (Table:- 400-1) -Plant Mix

granular sub-base by providing close graded Material, mixing in a mec

carriage of mixed Material to work site, spreading in uniform laye

prepared surface and compacting with vibratory power roller to ac

complete as per clause 401 of MORTH Specification- for grading- V Ma

Page 14: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 14/76

4

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

5

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

6

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

7

Km 7/600 - 7/700 1 x 1 100.00 2.00

8

 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and

aggregate to wet mix macadam specification including premixing the M

in mechanical mix plant carriage of mixed Material by tipper to site, lay

paver in sub- base / base course on well prepared surface and compact

achieve the desired density, Complete as per clause 406 of MORTH Spe

Prime coatProviding and applying primer coat with bitumen emulsio

surface of granular Base including clearing of road surface and spra

0.70 kg/sqm using mechanical means as per clause 502 of MORTH Sp  

 Tack coat- Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.25 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification-over granular surfaces treated with primer

 Tack coat - Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.20 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification -over bituminous surfaces

Providing and Laying50mm thick Bituminous Macadam using co

 bitumen which shall consist of construction in a single course base/bi

the specfication on a previously prepared base.(using Mini Hot Mix

including cost of material, labour charges, rentals for machinery, fuecharges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place

Page 15: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 15/76

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 1.75

Page 16: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 16/76

9

Road Crossing at 7/300 (i) 1 x 1 25.00 2.00

Road Crossing at 7/300 (ii) 1 x 1 20.00 2.00

Km 7/600 - 7/700 1 x 1 100.00 3.75

10

Km 7/600 - 7/700 1 x 1 100.00 1.50

Bituminous Concrete (Table 500-17) Providing and laying bitumino

plant using crushed aggregates of specified grading, premixed with bit

Grade-30) at percentage specified by Job Mix Formula of mix and fille

to work site, laying with a hydrostatic paver finisher to the r

alignment,rolled as per clause 501.6 and 501.7 to achieve the desired

No. 507 of MORTH Specification complete in all respects -Grading II

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification. Formation of embankm

including Compaction by power roller

Page 17: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 17/76

11

Km 6/10 1 x 1 85.00 2.00

Km 7/0 - 7/6 1 x 1 600.00 2.00

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification. Formation of embankme

Compaction by power roller

 Assista

Pall<

 Assistant Divisional Engineer, (H)

Palladam Sub Division<

Palladam

Page 18: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 18/76

ate Amount:Rs.4,50,400

Quantity

0.30 411.00

0.90 45.00

0.90 36.00

0.90 180.00

672.00

0.50 25.00

0.50 20.00

0.50 87.50

132.50

0.20 10.00

0.20 8.00

0.20 35.00

53.00

 ROAD KM 6/10 - 7/700

Depth

(m)

and satisfactory disposal

s in accordance with the

awings or as indicated by

arges for filling inlayers,

um density all incidental

MethodConstruction of

anical mix plant at OMC,

s with motor grader on

ieve the desired density,

erial

Page 19: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 19/76

0.15 7.50

0.15 6.00

0.15 26.25

39.75

50.00

40.00

175.00

265.00

50.00

40.00

175.00

265.00

200.00

200.00

  compacting graded stone

aterial with water at OMC

ing in uniform layers with

ng with vibratory roller to

ification.

n (SS-I type)on prepared

ing primer at the rate of

ecification over WMM

  lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

rse aggregate and VG30

nder course confirming to

Plant and Power Roller)

l and all other incidentalethod)

Page 20: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 20/76

0.05 2.50

0.05 2.00

0.05 8.75

13.25

Page 21: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 21/76

0.03 1.50

0.03 1.20

0.03 11.25

13.95

0.15 22.50

22.50

s concrete with hot mix

minous binder (Viscosity

, transporting the hot mix

quired grade, level and

compaction as per clause

and satisfactory disposal

s in accordance with the

awings or as indicated by

nt using Box cut earth

Page 22: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 22/76

0.30 51.00

0.30 360.00

411.00

and satisfactory disposal

s in accordance with the

awings or as indicated by

t using Gravel including

t Engineer, (H)

dam Section

alladam

Page 23: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 23/76

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

 ABSTRACT ESTIMATE

Description of Work Quantity

1

672.00 m3

2

132.50 m3

3

53.00 m3

SI.

No

Excavation for Roadway and drainage

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.

Gravel Filling including cost and conveyance

including labour charges for filling inlayers,

 watering tamping under opumum moisture

content to get the maximum density all incidentalcharges etc., With a lead of 1 Km

Granular Sub-base with Graded Material (Table:-

400-1) - Plant Mix Method Construction of

granular sub-base by providing close graded

Material, mixing in a mechanical mix plant at

OMC, carriage of mixed Material to work site,spreading in uniform layers with motor grader on

prepared surface and compacting with vibratory

power roller to achieve the desired density,

complete as per clause 401 of MORTH

Specification-for grading- V Material

Page 24: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 24/76

Description of Work QuantitySI.

No

4

39.75 m3

5

265.00 m2

6

265.00 m2

7

200.00 m2

 Wet Mix Macadam (Table 400-13) Providing,

laying, spreading and compacting graded stone

aggregate to wet mix macadam specification

including premixing the Material with water at

OMC in mechanical mix plant carriage of mixed

Material by tipper to site, laying in uniform layers

 with paver in sub- base / base course on well

prepared surface and compacting with vibratory

roller to achieve the desired density, Complete as

per clause 406 of MORTH Specification.

Prime coat Providing and applying primer coat

 with bitumen emulsion (SS-I type) on prepared

surface of granular Base including clearing of road

surface and spraying primer at the rate of0.70

kg/sqm using mechanical means as per clause

502 of MORTH Specificationover WMM

 Tack coat - Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.25 kg per

sqm on the prepared bituminous/granular

surface cleaned with mechanical broom as per

clause 503 of MORTH Specification- over

granular surfaces treated with primer

 Tack coat- Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.20 kg per

sqm on the prepared bituminous/granular surface

cleaned with mechanical broom as per clause 503

of MORTH Specification - over bituminous

surfaces

Page 25: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 25/76

Description of Work QuantitySI.

No

8

13.25 m3

9

13.95 m3

Providing and Laying50mm thick BituminousMacadam using course aggregate and VG30

 bitumen which shall consist of construction in a

single course base/binder course confirming to

the specfication on a previously prepared base.

(using Mini Hot Mix Plant and Power Roller) 

including cost of material, labour charges, rentals

for machinery, fuel and all other incidental

charges etc., complete as per clause 504 MORTH

Rev-5(Mix-in-place method)

Bituminous Concrete (Table 500-17) Providing

and laying bituminous concrete with hot mix

plant using crushed aggregates of specified

grading, premixed with bituminous binder

( Viscosity Grade-30)at percentage specified by

 Job Mix Formula of mix and filler, transporting

the hot mix to work site, laying with a hydrostatic

paver finisher to the required grade, level and

alignment,rolled as per clause 501.6 and 501.7 to

achieve the desired compaction as per clause No.

507 of MORTH Specification complete in all

respects - Grading II

Page 26: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 26/76

Description of Work QuantitySI.

No

11

22.50 m3

12

411.00 m3

 Total

13 Provision for Labour Welfare Fund 1%

14

Contingencies

GRAN

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification. Formation of embankment using

Box cut earth including Compaction by power

roller

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.Formation of embankment usingGravel including Compaction by power roller

 with a lead of 1km

Provision for Quality Control Charges and centage

Charges

Page 27: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 27/76

 ROAD KM 6/10 - 7/700 (ODR)

Estimate Amount:Rs.4,50,400

Rate Amount

50.60/m3 34003

205.05/m3 27169

1155.35/m3 61234

Page 28: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 28/76

Rate Amount

1353.32/m3 53794

61.67/m3 16343

11.93/m3 3161

14.52/m3 2904

Page 29: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 29/76

Rate Amount

4911.30/m3 65075

6673.78/m3 93099

Page 30: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 30/76

Rate Amount

12.85/m3 289

205.05/m3 84276

441347

4504

4413

136

 TOTAL 450400

Page 31: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 31/76

Estimat

Description No.

1

Km 7/700 - 7/900 1 x 1 200.00 2.00

Km 7/900 - 8/100 1 x 1 200.00 2.00

Km 8/100 - 8/2 1 x 1 100.00 2.00

2

Km 7/900 - 8/100 1 x 1 200.00 2.50Km 8/100 - 8/2 1 x 1 100.00 1.50

3

Km 7/900 - 8/100 1 x 1 200.00 2.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

4

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

(ODR)

SI.

No.

Length

(m)

 Width

(m)

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.

Gravel Filling including cost and conveyance including labour ch

 watering tamping under opumum moisture content to get the maxi

charges etc., complete With a lead of 1Km

Granular Sub-base with Graded Material (Table:- 400-1) -Plant Mix

granular sub-base by providing close graded Material, mixing in a mec

carriage of mixed Material to work site, spreading in uniform laye

prepared surface and compacting with vibratory power roller to ac

complete as per clause 401 of MORTH Specification- for grading- V Ma

 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and

aggregate to wet mix macadam specification including premixing the M

in mechanical mix plant carriage of mixed Material by tipper to site, lay

paver in sub- base / base course on well prepared surface and compact

achieve the desired density, Complete as per clause 406 of MORTH Spe

Page 32: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 32/76

Km 7/900 - 8/100 1 x 1 200.00 2.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

5

Km 7/900 - 8/100 1 x 1 200.00 2.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

6

Km 7/900 - 8/100 1 x 1 200.00 2.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

7

Km 7/900 - 8/100 1 x 1 200.00 1.25

Km 8/100 - 8/2 1 x 1 100.00 2.25

8

Km 7/900 - 8/100 1 x 1 200.00 2.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

Prime coatProviding and applying primer coat with bitumen emulsio

surface of granular Base including clearing of road surface and spra

0.70 kg/sqm using mechanical means as per clause 502 of MORTH Sp  

 Tack coat- Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.25 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification-over granular surfaces treated with primer

 Tack coat - Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.20 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification -over bituminous surfaces

Providing and Laying50mm thick Bituminous Macadam using co

 bitumen which shall consist of construction in a single course base/bi

the specfication on a previously prepared base.(using Mini Hot Mix

including cost of material, labour charges, rentals for machinery, fue

charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place

Page 33: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 33/76

9

Km 7/900 - 8/100 1 x 1 200.00 3.75

Km 8/100 - 8/2 1 x 1 100.00 3.75

10

Km 7/900 - 8/100 1 x 1 200.00 1.50

Km 8/100 - 8/2 1 x 1 100.00 1.50

Bituminous Concrete (Table 500-17) Providing and laying bitumino

plant using crushed aggregates of specified grading, premixed with bit

Grade-30) at percentage specified by Job Mix Formula of mix and fille

to work site, laying with a hydrostatic paver finisher to the r

alignment,rolled as per clause 501.6 and 501.7 to achieve the desired

No. 507 of MORTH Specification complete in all respects -Grading II

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.Formation of embankm

including Compaction by power roller

Page 34: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 34/76

11

Km 7/700 - 7/900 1 x 1 200.00 2.00

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.Formation of embankmen

Compaction by power roller with a lead of 1 Km

 Assista

Pall<

 Assistant Divisional Engineer, (H)

Palladam Sub Division<

Palladam

Page 35: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 35/76

 Amount: Rs.8,62,500/-

Quantity

0.30 120.00

0.90 360.00

0.90 180.00

660.00

0.50 250.000.50 75.00

325.00

0.20 100.00

0.20 30.00

130.00

 ROAD KM 7/700 - 8/2

Depth

(m)

and satisfactory disposal

s in accordance with the

awings or as indicated by

arges for filling inlayers,

um density all incidental

MethodConstruction of

anical mix plant at OMC,

s with motor grader on

ieve the desired density,

erial

  compacting graded stone

aterial with water at OMC

ing in uniform layers with

ng with vibratory roller to

ification.

Page 36: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 36/76

0.15 75.00

0.15 22.50

97.50

500.00

150.00

650.00

500.00

150.00

650.00

250.00

225.00

475.00

0.05 25.00

0.05 7.50

32.50

n (SS-I type)on prepared

ing primer at the rate of

ecification over WMM

  lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

rse aggregate and VG30

nder course confirming to

Plant and Power Roller)

l and all other incidental

ethod)

Page 37: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 37/76

0.03 22.50

0.03 11.25

33.75

0.15 45.00

0.15 22.50

67.50

s concrete with hot mix

minous binder (Viscosity

, transporting the hot mix

quired grade, level and

compaction as per clause

and satisfactory disposal

s in accordance with the

awings or as indicated by

nt using Box cut earth

Page 38: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 38/76

0.30 120.00

120.00

and satisfactory disposal

s in accordance with the

awings or as indicated by

t using Gravel including

t Engineer, (H)

dam Section

alladam

Page 39: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 39/76

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

 ABSTRACT ESTIMATE

Description of Work Quantity

1

660.00 m3

2

325.00 m3

3

130.00 m3

SI.

No

Excavation for Roadway and drainage

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.

Gravel Filling including cost and conveyance

including labour charges for filling inlayers,

 watering tamping under opumum moisture

content to get the maximum density all incidentalcharges etc., With a lead of 1 Km

Granular Sub-base with Graded Material (Table:-

400-1) - Plant Mix Method Construction of

granular sub-base by providing close graded

Material, mixing in a mechanical mix plant at

OMC, carriage of mixed Material to work site,spreading in uniform layers with motor grader on

prepared surface and compacting with vibratory

power roller to achieve the desired density,

complete as per clause 401 of MORTH

Specification-for grading- V Material

Page 40: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 40/76

Description of Work QuantitySI.

No

4

97.50 m3

5

650.00 m2

6

650.00 m2

7

475.00 m2

 Wet Mix Macadam (Table 400-13) Providing,

laying, spreading and compacting graded stone

aggregate to wet mix macadam specification

including premixing the Material with water at

OMC in mechanical mix plant carriage of mixed

Material by tipper to site, laying in uniform layers

 with paver in sub- base / base course on well

prepared surface and compacting with vibratory

roller to achieve the desired density, Complete as

per clause 406 of MORTH Specification.

Prime coat Providing and applying primer coat

 with bitumen emulsion (SS-I type) on prepared

surface of granular Base including clearing of road

surface and spraying primer at the rate of0.70

kg/sqm using mechanical means as per clause

502 of MORTH Specificationover WMM

 Tack coat - Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.25 kg per

sqm on the prepared bituminous/granular

surface cleaned with mechanical broom as per

clause 503 of MORTH Specification- over

granular surfaces treated with primer

 Tack coat- Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.20 kg per

sqm on the prepared bituminous/granular surface

cleaned with mechanical broom as per clause 503

of MORTH Specification - over bituminous

surfaces

Page 41: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 41/76

Description of Work QuantitySI.

No

8

32.50 m3

9

33.75 m3

Providing and Laying50mm thick BituminousMacadam using course aggregate and VG30

 bitumen which shall consist of construction in a

single course base/binder course confirming to

the specfication on a previously prepared base.

(using Mini Hot Mix Plant and Power Roller) 

including cost of material, labour charges, rentals

for machinery, fuel and all other incidental

charges etc., complete as per clause 504 MORTH

Rev-5(Mix-in-place method)

Bituminous Concrete (Table 500-17) Providing

and laying bituminous concrete with hot mix

plant using crushed aggregates of specified

grading, premixed with bituminous binder

( Viscosity Grade-30)at percentage specified by

 Job Mix Formula of mix and filler, transporting

the hot mix to work site, laying with a hydrostatic

paver finisher to the required grade, level and

alignment,rolled as per clause 501.6 and 501.7 to

achieve the desired compaction as per clause No.

507 of MORTH Specification complete in all

respects - Grading II

Page 42: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 42/76

Description of Work QuantitySI.

No

11

67.50 m3

12

120.00 m3

 Total

13 Provision for Labour Welfare Fund 1%

14

Contingencies

GRAN

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification. Formation of embankment using

Box cut earth including Compaction by power

roller

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.Formation of embankment usingGravel including Compaction by power roller

 with a lead of 1km

Provision for Quality Control Charges and Centage

Charges

Page 43: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 43/76

 ROAD KM 7/700 - 8/2 (ODR)

Estimate Amount: Rs.8,62,500/-

Rate Amount

50.60/m3 33396

205.05/m3 66641

1159.75/m3 150768

Page 44: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 44/76

Rate Amount

1353.32/m3 131949

61.67/m3 40086

11.93/m3 7755

14.52/m3 6897

Page 45: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 45/76

Rate Amount

4900.54/m3 159268

6673.78/m3 225240

Page 46: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 46/76

Rate Amount

12.85/m3 867

205.05/m3 24606

847473

8625

6275

127

 TOTAL 862500

Page 47: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 47/76

Estimat

Description No.

1

Km 8/2 - 8/300 1 x 1 100.00 2.00

Km 8/300 - 8/4 1 x 1 100.00 2.00

2

Km 8/2 - 8/300 1 x 1 100.00 1.30

Km 8/300 - 8/4 1 x 1 100.00 1.30

3

Km 8/2 - 8/300 1 x 1 100.00 1.30Km 8/300 - 8/4 1 x 1 100.00 1.30

4

Km 8/2 - 8/300 1 x 1 100.00 1.30

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

(ODR)

SI.

No.

Length

(m)

 Width

(m)

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.

Gravel Filling including cost and conveyance including labour ch

 watering tamping under opumum moisture content to get the maxi

charges etc., complete With a lead of 1Km

Granular Sub-base with Graded Material (Table:- 400-1) -Plant Mix

granular sub-base by providing close graded Material, mixing in a mec

carriage of mixed Material to work site, spreading in uniform laye

prepared surface and compacting with vibratory power roller to ac

complete as per clause 401 of MORTH Specification- for grading- V Ma

 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and

aggregate to wet mix macadam specification including premixing the M

in mechanical mix plant carriage of mixed Material by tipper to site, lay

paver in sub- base / base course on well prepared surface and compact

achieve the desired density, Complete as per clause 406 of MORTH Spe

Page 48: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 48/76

Km 8/300 - 8/4 1 x 1 100.00 1.30

5

Km 8/2 - 8/300 1 x 1 100.00 1.30

Km 8/300 - 8/4 1 x 1 100.00 1.30

6

Km 8/2 - 8/300 1 x 1 100.00 1.30

Km 8/300 - 8/4 1 x 1 100.00 1.30

7

Km 8/2 - 8/300 1 x 1 100.00 2.45Km 8/300 - 8/4 1 x 1 100.00 2.45

8

Km 8/2 - 8/300 1 x 1 100.00 1.30

Km 8/300 - 8/4 1 x 1 100.00 1.30

Prime coatProviding and applying primer coat with bitumen emulsio

surface of granular Base including clearing of road surface and spra

0.70 kg/sqm using mechanical means as per clause 502 of MORTH Sp  

 Tack coat- Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.25 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification-over granular surfaces treated with primer

 Tack coat - Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.20 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification -over bituminous surfaces

Providing and Laying50mm thick Bituminous Macadam using co

 bitumen which shall consist of construction in a single course base/bi

the specfication on a previously prepared base.(using Mini Hot Mix

including cost of material, labour charges, rentals for machinery, fue

charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place

Page 49: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 49/76

9

Km 8/2 - 8/300 1 x 1 100.00 3.75

Km 8/300 - 8/4 1 x 1 100.00 3.75

10

Km 8/2 - 8/300 1 x 1 100.00 1.50

Km 8/300 - 8/4 1 x 1 100.00 1.50

Bituminous Concrete (Table 500-17) Providing and laying bitumino

plant using crushed aggregates of specified grading, premixed with bit

Grade-30) at percentage specified by Job Mix Formula of mix and fille

to work site, laying with a hydrostatic paver finisher to the r

alignment,rolled as per clause 501.6 and 501.7 to achieve the desired

No. 507 of MORTH Specification complete in all respects -Grading II

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification. Formation of embankm

including Compaction by power roller

 Assistant

Pallad<

Pa

 Assistant Divisional Engineer, (H)

Palladam Sub Division<

Palladam

Page 50: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 50/76

 Amount: Rs.4,05,500/-

Quantity

0.90 180.00

0.90 180.00

360.00

0.50 65.00

0.50 65.00

130.00

0.20 26.000.20 26.00

52.00

0.15 19.50

M ROAD KM 8/2 - 8/4

Depth

(m)

and satisfactory disposal

s in accordance with the

awings or as indicated by

arges for filling inlayers,

um density all incidental

MethodConstruction of

anical mix plant at OMC,

s with motor grader on

ieve the desired density,

erial

  compacting graded stone

aterial with water at OMC

ing in uniform layers with

ng with vibratory roller to

ification.

Page 51: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 51/76

0.15 19.50

39.00

130.00

130.00

260.00

130.00

130.00

260.00

245.00245.00

490.00

0.05 6.50

0.05 6.50

13.00

n (SS-I type)on prepared

ing primer at the rate of

ecification over WMM

  lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

rse aggregate and VG30

nder course confirming to

Plant and Power Roller)

l and all other incidental

ethod)

Page 52: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 52/76

0.03 11.25

0.03 11.25

22.50

0.15 22.50

0.15 22.50

45.00

s concrete with hot mix

minous binder (Viscosity

, transporting the hot mix

quired grade, level and

compaction as per clause

and satisfactory disposal

s in accordance with the

awings or as indicated by

nt using Box cut earth

Engineer, (H)

am Section

lladam

Page 53: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 53/76

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

 ABSTRACT ESTIMATE

Description of Work Quantity

1

360.00 m3

2

130.00 m3

3

52.00 m3

SI.

No

Excavation for Roadway and drainage

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.

Gravel Filling including cost and conveyance

including labour charges for filling inlayers,

 watering tamping under opumum moisture

content to get the maximum density all incidentalcharges etc., With a lead of 1 Km

Granular Sub-base with Graded Material (Table:-

400-1) - Plant Mix Method Construction of

granular sub-base by providing close graded

Material, mixing in a mechanical mix plant at

OMC, carriage of mixed Material to work site,spreading in uniform layers with motor grader on

prepared surface and compacting with vibratory

power roller to achieve the desired density,

complete as per clause 401 of MORTH

Specification-for grading- V Material

Page 54: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 54/76

Description of Work QuantitySI.

No

4

39.00 m3

5

260.00 m2

6

260.00 m2

7

490.00 m2

 Wet Mix Macadam (Table 400-13) Providing,

laying, spreading and compacting graded stone

aggregate to wet mix macadam specification

including premixing the Material with water at

OMC in mechanical mix plant carriage of mixed

Material by tipper to site, laying in uniform layers

 with paver in sub- base / base course on well

prepared surface and compacting with vibratory

roller to achieve the desired density, Complete as

per clause 406 of MORTH Specification.

Prime coat Providing and applying primer coat

 with bitumen emulsion (SS-I type) on prepared

surface of granular Base including clearing of road

surface and spraying primer at the rate of0.70

kg/sqm using mechanical means as per clause

502 of MORTH Specificationover WMM

 Tack coat - Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.25 kg per

sqm on the prepared bituminous/granular

surface cleaned with mechanical broom as per

clause 503 of MORTH Specification- over

granular surfaces treated with primer

 Tack coat- Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.20 kg per

sqm on the prepared bituminous/granular surface

cleaned with mechanical broom as per clause 503

of MORTH Specification - over bituminous

surfaces

Page 55: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 55/76

Description of Work QuantitySI.

No

8

13.00 m3

9

22.50 m3

Providing and Laying50mm thick BituminousMacadam using course aggregate and VG30

 bitumen which shall consist of construction in a

single course base/binder course confirming to

the specfication on a previously prepared base.

(using Mini Hot Mix Plant and Power Roller) 

including cost of material, labour charges, rentals

for machinery, fuel and all other incidental

charges etc., complete as per clause 504 MORTH

Rev-5(Mix-in-place method)

Bituminous Concrete (Table 500-17) Providing

and laying bituminous concrete with hot mix

plant using crushed aggregates of specified

grading, premixed with bituminous binder

( Viscosity Grade-30)at percentage specified by

 Job Mix Formula of mix and filler, transporting

the hot mix to work site, laying with a hydrostatic

paver finisher to the required grade, level and

alignment,rolled as per clause 501.6 and 501.7 to

achieve the desired compaction as per clause No.

507 of MORTH Specification complete in all

respects - Grading II

Page 56: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 56/76

Description of Work QuantitySI.

No

11

45.00 m3

 Total

13 Provision for Labour Welfare Fund 1%

14

Contingencies

GRAN

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification. Formation of embankment using

Box cut earth including Compaction by power

roller

Provision for Quality Control Charges and Centage

Charges

Page 57: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 57/76

 ROAD KM 8/2 - 8/4 (ODR)

Estimate Amount: Rs.4,05,500/-

Rate Amount

50.60/m3 18216

205.05/m3 26657

1159.75/m3 60307

Page 58: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 58/76

Rate Amount

1353.32/m3 52779

61.67/m3 16034

11.93/m3 3102

14.52/m3 7115

Page 59: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 59/76

Rate Amount

4900.54/m3 63707

6673.78/m3 150160

Page 60: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 60/76

Rate Amount

12.85/m3 578

398655

4055

2737

53

 TOTAL 405500

Page 61: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 61/76

Estimat

Description No.

1

Km 8/4 - 8/750 1 x 1 340.00 2.00

Km 8/750 - 9/0 1 x 1 260.00 2.00

2

Km 8/750 - 9/0 1 x 1 260.00 2.00

3

Km 8/750 - 9/0 1 x 1 260.00 2.00

4

Km 8/750 - 9/0 1 x 1 260.00 2.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

(ODR)

SI.

No.

Length

(m)

 Width

(m)

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.

Gravel Filling including cost and conveyance including labour ch

 watering tamping under opumum moisture content to get the maxi

charges etc., complete With a lead of 1Km

Granular Sub-base with Graded Material (Table:- 400-1) -Plant Mix

granular sub-base by providing close graded Material, mixing in a mec

carriage of mixed Material to work site, spreading in uniform laye

prepared surface and compacting with vibratory power roller to ac

complete as per clause 401 of MORTH Specification- for grading- V Ma

 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and

aggregate to wet mix macadam specification including premixing the M

in mechanical mix plant carriage of mixed Material by tipper to site, lay

paver in sub- base / base course on well prepared surface and compact

achieve the desired density, Complete as per clause 406 of MORTH Spe

Page 62: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 62/76

5

Km 8/750 - 9/0 1 x 1 260.00 2.00

6

Km 8/750 - 9/0 1 x 1 260.00 2.00

7

Km 8/750 - 9/0 1 x 1 260.00 1.75

8

Km 8/750 - 9/0 1 x 1 260.00 2.00

Prime coatProviding and applying primer coat with bitumen emulsio

surface of granular Base including clearing of road surface and spra

0.70 kg/sqm using mechanical means as per clause 502 of MORTH Sp  

 Tack coat- Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.25 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification-over granular surfaces treated with primer

 Tack coat - Providing and applying tack coat with bitumen em

emulsion pressure distributor at the rate of 0.20 kg per

 bituminous/granular surface cleaned with mechanical broom as p

Specification -over bituminous surfaces

Providing and Laying50mm thick Bituminous Macadam using co

 bitumen which shall consist of construction in a single course base/bi

the specfication on a previously prepared base.(using Mini Hot Mix

including cost of material, labour charges, rentals for machinery, fue

charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place

Page 63: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 63/76

9

Km 8/750 - 9/0 1 x 1 260.00 3.75

10

Km 8/750 - 9/0 1 x 1 260.00 1.50

Bituminous Concrete (Table 500-17) Providing and laying bitumino

plant using crushed aggregates of specified grading, premixed with bit

Grade-30) at percentage specified by Job Mix Formula of mix and fille

to work site, laying with a hydrostatic paver finisher to the r

alignment,rolled as per clause 501.6 and 501.7 to achieve the desired

No. 507 of MORTH Specification complete in all respects -Grading II

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification. Formation of embankm

including Compaction by power roller

Page 64: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 64/76

11

Km 8/4 - 8/750 1 x 1 340.00 2.00

Excavation for Roadway and drainage Excavation including removal

of all materias necessary for the construction of roadway and side drai

specifications and the lines, grades and cross sections shown in the d

the Engineer, as per MORTH Specification.Formation of embankmen

Compaction by power roller

 Assista

Palla<

P

 Assistant Divisional Engineer, (H)

Palladam Sub Division<

Palladam

Page 65: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 65/76

 Amount: Rs.7,41,700/-

Quantity

0.30 204.00

0.90 468.00

672.00

0.50 260.00

260.00

0.20 104.00

104.00

0.15 78.00

78.00

M ROAD KM 8/2 - 8/4

Depth

(m)

and satisfactory disposal

s in accordance with the

awings or as indicated by

arges for filling inlayers,

um density all incidental

MethodConstruction of

anical mix plant at OMC,

s with motor grader on

ieve the desired density,

erial

  compacting graded stone

aterial with water at OMC

ing in uniform layers with

ng with vibratory roller to

ification.

Page 66: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 66/76

520.00520.00

520.00

520.00

455.00

455.00

0.05 26.00

26.00

n (SS-I type)on prepared

ing primer at the rate of

ecification over WMM

  lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

lsion (RS-I type) using

sqm on the prepared

r clause 503 of MORTH

rse aggregate and VG30

nder course confirming to

Plant and Power Roller)

l and all other incidental

ethod)

Page 67: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 67/76

0.03 29.25

29.25

0.15 58.50

58.50

s concrete with hot mix

minous binder (Viscosity

, transporting the hot mix

quired grade, level and

compaction as per clause

and satisfactory disposal

s in accordance with the

awings or as indicated by

nt using Box cut earth

Page 68: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 68/76

0.30 204.00

204.00

and satisfactory disposal

s in accordance with the

awings or as indicated by

t using Gravel including

t Engineer, (H)

dam Section

alladam

Page 69: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 69/76

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYA

 ABSTRACT ESTIMATE

Description of Work Quantity

1

672.00 m3

2

260.00 m3

3

104.00 m3

SI.

No

Excavation for Roadway and drainage

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.

Gravel Filling including cost and conveyance

including labour charges for filling inlayers,

 watering tamping under opumum moisture

content to get the maximum density all incidentalcharges etc., With a lead of 1 Km

Granular Sub-base with Graded Material (Table:-

400-1) - Plant Mix Method Construction of

granular sub-base by providing close graded

Material, mixing in a mechanical mix plant at

OMC, carriage of mixed Material to work site,spreading in uniform layers with motor grader on

prepared surface and compacting with vibratory

power roller to achieve the desired density,

complete as per clause 401 of MORTH

Specification-for grading- V Material

Page 70: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 70/76

Description of Work QuantitySI.

No

4

78.00 m3

5

520.00 m2

6

520.00 m2

7

455.00 m2

 Wet Mix Macadam (Table 400-13) Providing,

laying, spreading and compacting graded stone

aggregate to wet mix macadam specification

including premixing the Material with water at

OMC in mechanical mix plant carriage of mixed

Material by tipper to site, laying in uniform layers

 with paver in sub- base / base course on well

prepared surface and compacting with vibratory

roller to achieve the desired density, Complete as

per clause 406 of MORTH Specification.

Prime coat Providing and applying primer coat

 with bitumen emulsion (SS-I type) on prepared

surface of granular Base including clearing of road

surface and spraying primer at the rate of0.70

kg/sqm using mechanical means as per clause

502 of MORTH Specificationover WMM

 Tack coat - Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.25 kg per

sqm on the prepared bituminous/granular

surface cleaned with mechanical broom as per

clause 503 of MORTH Specification- over

granular surfaces treated with primer

 Tack coat- Providing and applying tack coat with

 bitumen emulsion (RS-I type) using emulsion

pressure distributor at the rate of0.20 kg per

sqm on the prepared bituminous/granular surface

cleaned with mechanical broom as per clause 503

of MORTH Specification - over bituminous

surfaces

Page 71: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 71/76

Description of Work QuantitySI.

No

8

26.00 m3

9

29.25 m3

Providing and Laying50mm thick BituminousMacadam using course aggregate and VG30

 bitumen which shall consist of construction in a

single course base/binder course confirming to

the specfication on a previously prepared base.

(using Mini Hot Mix Plant and Power Roller) 

including cost of material, labour charges, rentals

for machinery, fuel and all other incidental

charges etc., complete as per clause 504 MORTH

Rev-5(Mix-in-place method)

Bituminous Concrete (Table 500-17) Providing

and laying bituminous concrete with hot mix

plant using crushed aggregates of specified

grading, premixed with bituminous binder

( Viscosity Grade-30)at percentage specified by

 Job Mix Formula of mix and filler, transporting

the hot mix to work site, laying with a hydrostatic

paver finisher to the required grade, level and

alignment,rolled as per clause 501.6 and 501.7 to

achieve the desired compaction as per clause No.

507 of MORTH Specification complete in all

respects - Grading II

Page 72: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 72/76

Description of Work QuantitySI.

No

11

58.50 m3

12

204.00 m3

 Total

13 Provision for Labour Welfare Fund 1%

14

Contingencies

GRAN

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification. Formation of embankment using

Box cut earth including Compaction by power

roller

Excavation for Roadway and drainage 

Excavation including removal and satisfactory

disposal of all materias necessary for the

construction of roadway and side drains in

accordance with the specifications and the lines,

grades and cross sections shown in the drawings

or as indicated by the Engineer, as per MORTH

Specification.Formation of embankment usingGravel including Compaction by power roller

 with a lead of 1km

Provision for Quality Control Charges and Centage

Charges

Page 73: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 73/76

 ROAD KM 8/2 - 8/4 (ODR)

Estimate Amount: Rs.7,41,700/-

Rate Amount

50.60/m3 34003

205.05/m3 53313

1164.15/m3 121072

Page 74: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 74/76

Rate Amount

1353.32/m3 105559

61.67/m3 32068

11.93/m3 6204

14.52/m3 6607

Page 75: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 75/76

Rate Amount

4900.54/m3 127414

6673.78/m3 195208

Page 76: Venki Kalipalayam 37 40

7/23/2019 Venki Kalipalayam 37 40

http://slidepdf.com/reader/full/venki-kalipalayam-37-40 76/76

Rate Amount

12.85/m3 752

205.05/m3 41830

724030

7417

10040

213