Rolls-Royce Energy Systems Inc. ERP Implementation Vendor Communication / Training Pack ©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies.

Transcript of Vendor Communication / Training Pack

Page 1: Vendor Communication / Training Pack

Rolls-Royce Energy Systems Inc.

ERP Implementation

Vendor Communication / Training Pack

©2003 Rolls-Royce plc

The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose

other than that for which it is supplied without the express written consent of Rolls-Royce plc.

This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given

concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of

its subsidiary or associated companies.

Page 2: Vendor Communication / Training Pack

IntroductionRolls-Royce is moving towards a Global Organisation and therefore we have

created this training pack to guide you and your team through the opportunities

and changes associated with the Rolls-Royce introduction of Enterprise Resource

Planning (ERP) into Energy Systems Inc. and the computer system designed to

support it ……SAP

Our new working practices are described in the following document in a format

suitable for presenting to members of your team.

We would also like to offer you the opportunity to participate in a webmeeting,

where we will walk through this documentation. All participants will be able to

ask questions which will be answered by our specialists.

Not all of the described processes / documents are necessarily relevant for your

business (e.g. Delivery Schedules for indirect suppliers) however, we have

created one training pack for all suppliers. Suppliers, with the help of their Rolls-

Royce representative, will be able to determine the future format of their purchase

documentation from Energy Systems Inc.

Page 3: Vendor Communication / Training Pack

Contents

1. New Organization

2. New Roles – Rolls-Royce terminologies

3. Purchasing Documents and Schedule Management

4. What to expect at Go-Live (5th August 2005)

5. Quality Documents

6. Delivery Documents – SABRe Label requirements, i.e. Bar Coding

7. Invoicing Requirements

8. Processes – C Class Parts, Operation Offload

9. Implementation Sequence

10. What Next ? - Further Training for Suppliers (Webinars)

11. Summary of Essentials

12. FAQs

13. Foreign Trade Data

Page 4: Vendor Communication / Training Pack

1. New Organization

Company Code

Rolls-Royce is separated into a number of ‘Company Codes’, e.g. Airlines,

Defence, Energy, RRD and Operation’s. Each company code operates with a

degree of independence. As a Vendor, you may supply the same part number

to more than one company code and therefore you may receive more than one

purchasing document.

Plant

A plant is a subdivision of a company code and is a unit where manufacture or

storage takes place. You will be required to deliver to individual plants and

storage locations within them. If you supply the same part number to more

than one plant, you will receive purchasing documents with multiple line items.

Page 5: Vendor Communication / Training Pack

2. New Roles

With the New Organisation comes new roles for Rolls-Royce:

Operational Buyer

The Buyer will be responsible for all of the commercial aspects of procuring components.

MRP Controller (MRPC)

The MRP Controller will be responsible for all of the logistical aspects of procuring components and is the prime point of contact for commitment acceptance for running parts. i.e. Agreeing a ‘doable schedule’ Changes to the delivery schedule are made by agreement between you, the Vendor and MRP Controller.

Product Technical Controller (PTC)

The PTC will be responsible for all of the quality aspects of procured components.

The above Rolls-Royce team working with you will be responsible for the commitment acceptance process.

Page 6: Vendor Communication / Training Pack

3. Examples of Rolls-Royce Output Documents

Below are the documents you will be expected to understand. These have been

separated into the likely departments or functions within your business that will deal with

them.

Please use the following hyperlink to preview our purchasing documents:

www.suppliermanager-online.com

Procurement

• Request for

Quotation

(RFQ)

• Request for

Information

(RFI)

• Schedule

Agreements

• Delivery

Schedules

• Purchase

Orders

• Contracts

Sales Order

Processing

• Delivery

Schedules

• Commitment

Acceptance

• Return Notes

Quality

• First Article

Inspection

Requirement

s (FAIR)

• Concessions

• Reject /

Debit Note

• Return Note

• Problem

Improvement

Request

Accounts

• Invoices

• Reject /

Debit Notes

Despatch

•Delivery Note

•Advice Note

(Packing Slip)

•Barcoding

Page 7: Vendor Communication / Training Pack

3. Commercial Paperwork

Requests For Quotation (RFQs)

An RFQ is a request for the Vendor to quote against Rolls-Royce requirements.

The document contains the quantity of the material number required, an estimated

requirement date, unit of measure and any other details as required, such as technical

specification details, packaging requirements etc.

Within your quotation, you should provide an accurate Planned Delivery Time which

should cover the ‘first make’ lead-time (including any time required for tooling

manufacture). We will regard this lead-time as your commitment to deliver.

Requests for Information (RFIs)

An RFI is a request for information from the Vendor.

The document contains the same information as an RFQ, e.g. material number,

requirement date, but can also be used to request information using free text.

e.g. request for packaging details etc.

Page 8: Vendor Communication / Training Pack

3. Commercial Paperwork

Schedule Agreements

A Schedule Agreement is used primarily to buy MRP materials, (e.g. production

components)

The document defines that the demand for a material will be sourced on a Vendor for a

period of time (e.g. 2 years)

It includes contractual information including the agreed price, commercial terms and

technical requirements. The Schedule Agreement does not authorise delivery.

You will need to acknowledge schedule agreements.

Delivery call-off is defined by the Delivery Schedule (effectively the part 2 of the SA).

Delivery Schedules

The delivery schedule is an instruction to deliver against the schedule agreement. It

defines the quantity, required delivery date into Rolls-Royce and delivery address.

The delivery schedule will reflect both the ‘doable schedule’ negotiated by you and the

Rolls-Royce Procurement team and the planned delivery time you quoted for the first

delivery. Any future changes to this schedule will be negotiated first with the vendor and

then reflected onto the delivery schedule.

Page 9: Vendor Communication / Training Pack

3. Commercial PaperworkFramework Orders

A framework order can be used with service providers for the purchase of utilities, such as gas

or electricity, where that commodity can be called off directly by the customer, without the

need to use SAP purchase requisitions.

Contracts

These take on a similar format to schedule agreements. However, they are not used for

standard MRP parts and are not called off using delivery schedules. Instead, a purchase

order is used to communicate requirement dates and quantities, referring back to the contract.

Contracts will be used for C class parts and Operation Offload. C Class is defined as

Consigned Material for Rolls-Royce Energy Systems Inc. Operation Offload is defined as

outsourced manufacturing processes.

Purchase Orders

A Purchase Order in SAP is used primarily to buy non-MRP goods or services, (e.g. special to

product tooling) It may also be used to call-off requirements on contracts (e.g. Operation

Offload).

It includes all information including agreed price, delivery date required, delivery terms, and so

forth.

Page 10: Vendor Communication / Training Pack

3. New Information Flow

Schedule Agreements and Delivery Schedules will be the main SAP documents used

to communicate our requests for production requirements.

In general there will be one part number (material) per Schedule Agreement / Delivery

Schedule.

The total requirement for that part number may be split on two or more schedule lines,

these are called “Line items”. Line items flow from Plants. So if you see more than

one line item on a Schedule Agreement, it means that you will need to deliver the

same part number to more that one Plant (i.e. there may be more than one delivery

address).

This means that you will pack each line item separately, label it separately and where

necessary deliver each item to a different address!

Page 11: Vendor Communication / Training Pack

3. SAP Purchasing Documents & Number Ranges

The following table identifies the number ranges (pre-fixes) of the purchasing documents detailed

on the previous pages. Vendors should be aware that our Purchasing document references are up

to 10 characters in length. You will also need to reference our Item Number which is 4 characters.

Request for Information

Request for Quotations

Contract

Framework Order

Standard Purchase Order

Schedule Agreements

Document

70********

60********

46********

45********

50********

55********

SAP Number Range Prefixes

(10 Characters)

0001

0001

0001

0001

0001

0001

Item Number

(4 Characters)

Page 12: Vendor Communication / Training Pack

3. Schedule Management

Lead-times in SAP are known as Planned Delivery Times (PDT).

When quoting for Rolls-Royce requirements, the Vendor is asked to provide a

PDT which will represent the time from despatch of the Rolls-Royce purchase

order to delivery.

PDT is the lead-time at which you are able to manage schedule change.

When MRP is run it plans all new requirements at lead-time (PDT). Where

requirements fall outside lead-time the schedule is considered doable. The

PDT is used for creating delivery schedule lines and is your reaction time.

Delivery schedules will be subject to lot sizing rules. A lot size is the delivery

quantity as called-off by Rolls-Royce. It effectively regulates the frequency of

deliveries according to the unit cost of the material.

Deliveries made up to 7 days earlier than the required date will not impact

vendor evaluation, late deliveries will have an adverse effect on evaluation.

Page 13: Vendor Communication / Training Pack

3. Schedule Management

= Demand

E.g. Vendor’s Lead Time (PDT) = 4 WeeksE.g. Vendor’s Lead Time (PDT) = 4 Weeks

MRP will always place demand at 20 weeks (‘outside’ of

lead-time) If the Rolls-Royce requirement is earlier than 4

weeks, the MRP Controller and Vendor will negotiate to bring

the delivery forward, this is called ‘Commitment Acceptance’

Planned Delivery Time (PDT)

PDT - 20 Wks

TodayToday

(1 Aug 05)(1 Aug 05)1 Sept 051 Sept 0515 Aug 0515 Aug 05

Page 14: Vendor Communication / Training Pack

3. Commitment AcceptanceCommitment acceptance starts when MRP uses the Planned Delivery Time (PDT) to plan the demand and create or change the schedule.

Automatic Commitment Acceptance

It would be impossible to handle all commitment acceptance manually, so a large proportion of this activity is carried out automatically at PDT. You own PDT and the Rolls-Royce Procurement team manage it.

Manual Commitment Acceptance

By exception, where the Rolls-Royce Procurement team request changes within PDT, this will need to be accepted as a commitment by you and will be reflected by a change to the order.

By exception, where, outside PDT, you consider an automatically proposed commitment tobe unachievable, we expect you to contact the Rolls-Royce Procurement team to negotiate a revised commitment. When this is agreed, it will be reflected by a change to the order.

Renegotiating Commitments

If due to exceptional circumstances, you recognise within PDT that you are unable to meet a previously committed date, you must inform the Rolls-Royce Procurement team of the problem and agree new delivery dates immediately. When this is agreed, it will be reflected by a change to the order. This will be regarded as a failure of commitment.

Page 15: Vendor Communication / Training Pack

4. What to expect at Go-Live (5th August 05)

Purchasing Changes

When SAP goes live, Schedule Agreements will be created which will replace the

current purchase order format for all production materials. To enable an effective

cross over to the new documents we will reference your old CICS purchase order

number on each schedule agreement in the Item text.

A new Purchase Order format will be used for all indirect, repair and expense type

orders.

Current buyer to vendor assignments may change.

Rolls-Royce require all orders to be acknowledged, please complete the Schedule

Agreement and/or acknowlegement and return to the address provided in a timely

manner.

Delivery Requirements

We expect that the first delivery schedules generated in SAP will be very similar to the

current ones. We only expect minor changes in terms of moving a delivery a couple of

days forward or backward, based on our assembly schedule.

Page 16: Vendor Communication / Training Pack

4. What to expect at Go-Live (5th August 05)

Delivery Schedule Distribution

We will be using Faxination to issue our delivery schedules which allows our demand

to be sent directly out of SAP to our Vendors via fax. Therefore it is important to make

sure that your contact information is up to date.

If you are a current supplier to Rolls-Royce plc and are using Exostar to receive your

Delivery Schedules, this will continue after go-live.

Vendor Reference

When Vendors are created in SAP they will be allocated a 6 digit Vendor Code which

will be visible on all purchase documents you receive from Rolls-Royce.

Goods Receiving

Our goods receiving department will have a cross reference table in order to match the

old CICS order numbers with the new SAP order numbers. As from 1st September

onwards, we will not accept any deliveries which do not state the correct purchasing

document information. Such deliveries will be returned at your cost.

Page 17: Vendor Communication / Training Pack

4. What to expect at Go-Live (5th August 05)

SABRe Label / Bar Coding Requirements

Optional from June 15th 2005

Mandatory for all deliveries after August 1st 2005.

Page 18: Vendor Communication / Training Pack

4. Rolls Royce Energy Ship to locationsMt Vernon

Rolls-Royce Energy Systems Inc.

607 West Chestnut St

Mount Vernon OH., 43050

North Norton Street

Mount Vernon OH., 43050

Marion Warehouse

Rolls-Royce Energy Systems Inc.

1207 Cheney Avenue

Marion, OH 43302

Singapore

Rolls-Royce PTE LTD.

#03-09 16 International Business Park

Singapore, 609929

Liverpool

Rolls-Royce Power Engineering PLC

Atlantic Industrial Complex-Dunnings

Bridge Road

Bootle, Merseyside L30 4UZ UK

Houston

Rolls-Royce Energy Systems Inc.

Engineered Solutions

10255 Richmond Ave.

Houston, TX, 77042

Page 19: Vendor Communication / Training Pack

5. Quality Paperwork

First Article Inspection Reports

First Article Inspection is required on the 1st delivery of every new material, thereafter, inspection reports requirements are as defined by purchasing documents

Quality Notifications

SAP Quality notifications (QNs) are used to record and investigate all non-conformance. There are seven main types of QNs:

Concessions, Complaints, Inspection Rejects, Investigations, Audit and Re-issue Concessions, PIR (3 in 1)

Concession Application

Rolls-Royce expects all products to be delivered to meet Rolls-Royce specifications.In the rare instance when a manufacturing process yields a component that is functionally acceptable but not meeting specifications, the Vendor may request a concession from the PTC. Rolls-Royce will evaluate the Vendor request and if the part is deemed usable, a concession will be granted and the part will be accepted.If the concession is not acceptable the Vendor will be expected to supply product that meets requirements.

Page 20: Vendor Communication / Training Pack

5. Quality Paperwork continued ..Returns Note

This document will be used when the non-conformance has been caused by Rolls-Royce. We will only pay for correcting non-conformance at defined rates.

Rejection / Debit Note

This document will be used to reject vendor non-conforming material.

The second part of this document is the debit note, which will advise you of the amount by which your account has been automatically debited. This cost will be shown on the debit part of the reject/debit note.

Problem Improvement Request (3 in 1)

For both Procurement and Internal Manufacturing a new QN type is used, with themain 3 in 1 process being held inside this QN process.

The 48hr containment check sheet and level 1&2 forms can be emailed directly to theVendor to update and email directly back to Rolls-Royce.

In all instances refer to SABRe for further information, using the link SABRe

Page 21: Vendor Communication / Training Pack

6. Release Notes / Delivery / Advice Notes

and Bar-coded receipting label

All delivery documentation submitted after August 15th 2005 must now include:

Delivery / Release / Advice note number

Material part number

Plant

Storage location

Purchase document number

Purchase document Item number

The quantity

Serial Number (S) (if applicable)

Refer to SABRe for further information

Page 22: Vendor Communication / Training Pack

6. Deliveries to RR

For all information concerning deliveries to Rolls-Royce, please open the following

hyperlink in the Internet:

http://www.suppliermanager-online.com/sabre

Rolls-Royce frequently updates this information, please ensure that your company always

has the latest information available. The next slide gives you a brief overview of what we

expect from our suppliers. However this information shall only illustrate the main topics. It

is vital for a smooth process that you implement all requirements stated in SABRe.

Any mismatches in the barcode format or the information provided on the delivery tag may

result in a delay of goods receipt or in a complete rejection of the delivery. Without having

received a delivery into our systems no payment transactions will be triggered.

You will be required to produce a test-label according to the specifications in SABRe. Based

on the expierience with other suppliers, we see this exercise as very important to avoid any

problems after go-live. Details are provided on the next page.

Page 23: Vendor Communication / Training Pack

6 The Perfect Delivery for one Batch into Rolls-Royce

Release Note No: A123456

Deliver to:

1203 ENGD

PSC

Gate 8

Wilmore road

Derby

DE24 8BJ

Documents Enclosed

12kg

Release Note No: A123456

Part LK7654321

Quantity 4

Deliver to: 1203 ENGD

PSC

Gate 8, Wilmore road

Derby

DE24 8BJ

Documents Enclosed

Part Identification Label

The only acceptable Qty on this

label is 1

Therefore it must be attached to

the part (or box for Qty 1)

C

O

L

O

U

R

C

O

D

E

Weight

Each Batch should be detailed

with it’s overall weight to prevent

handling injuries.

The heaviest side should also be

noted if this is applicable

The Release Note

It Should:

Have a unique reference number

Contain details of conformity

Have a bar-coded receipting label

attached to the reverse

Be placed in a clear document wallet on

the outside of the batch

And, if possible:

Make the Release Note Number and

Invoice Number identical

Avoid special characters in the reference

number (e.g. /,*, leading zeros or ‘I’s)

Note: All

information

must match

The Bar coded Receipting

Label

One copy must be attached to the

reverse of the release note.

Another identical copy must be attached

in a prominent scanable position on the

outside of the batch

Serialised Parts

All parts requiring serial number

traceability must have a bar

coded label fixed to their inner

packaging

In addition they must also have

the serial number on the Part

Identification label

Consolidation

For effectiveness of transportation an external

container may be used to consolidate a number

of parts – though it is not a preferred method of

delivery.

All suppliers must provide detail on the outer

box how many items are contained within.

Something like “This outer contains X batches”

All batches within the outer must still have all R-

R paperwork presented as shown above

For full details

please refer to SABRe

Page 24: Vendor Communication / Training Pack

7. InvoicesAfter August 4th 2005, Invoice payment will be managed by the Rolls-Royce

plc Finance Service Centre in the United Kingdom (with the exception of Rolls-

Royce Pte Limited in Singapore)

The Invoicing address is shown on all Purchasing documents:

FAO Accounts Payable

Rolls-Royce plc

P O Box 31

Derby

DE24 8BJ

United Kingdom

Where Vendors have the ability to send scanned images of their invoices / credit notes, they may use the following FSC email address: [email protected]

The email address should only be used to send invoices or credit notes.

Invoices / credit notes need to be sent in a PDF format.

Any invoices / credit notes sent through this route must not also be sent via the post.

Any other emails received through this address will be deleted and not responded to.

Page 25: Vendor Communication / Training Pack

7. Invoices

Where Purchasing documents are created by Rolls-Royce Pte Limited in Singapore,

these invoices must be sent to:

FAO Accounts Payable

Rolls-Royce Pte Limited

16 International Business Park

#03-09 Singapore 609929

Rolls-Royce in Singapore will log these Invoices and forward details to the Finance Service Centre in the UK for payment.

Please be aware that the FSC email address to receive scanned invoices / credit notes should not be used by Vendors to Singapore.

Page 26: Vendor Communication / Training Pack

7. Invoices

To enable invoice verification (automated payment) to be successful,

the following must be included on the invoice:

Invoice number (preferably the same as the Release note number)

Invoice date

Purchase Document number

Purchase Document item number

Delivery / Release / Advice note as quoted on delivery paperwork thataccompanied the goods

Quantity as per the delivery paperwork

Same unit of measure as the purchase document

Same currency as the purchase document

Same value as shown on the purchase document

Correct VAT calculations

Final invoice total

Page 27: Vendor Communication / Training Pack

8. Processes – C Class Parts

C Class Parts were previously defined as Consignment Stock.

These are parts where Rolls-Royce has an agreement with a Service Provider

/ and or manufacturer to maintain stock at Rolls-Royce location. The

commercial and technical terms as well as the price are maintained with the

Rolls-Royce vendor by the buyer responsible for this vendor as today. The

Service Provider / manufacturer will deliver and replenish Rolls-Royce “shop

floor” bins.

There will be no schedule agreements issued for these parts.

Contracts are raised on the manufacturing vendor to record pricing and

commercial / technical requirements for the components.

You will receive one contract per Rolls-Royce company code.

Page 28: Vendor Communication / Training Pack

8. Processes - Operation Offload

Operation Offload is defined as the outsourcing of manufacturing

operations.

A SAP Contract will be issued to Vendors defining the length of the Contract,

the number of units covered by the Contract and any Commercial and

Technical requirements.

When an offload batch is ready to be despatched to the Vendor, a Purchase

Order will be raised automatically and the order number will be referenced

on the despatch paperwork issued to the supplier (there is no separate issue

of PO).

The vendor will then deliver completed parts against delivery paperwork

ensuring the purchase order number is quoted. Invoices must also quote

the purchase order number.

Page 29: Vendor Communication / Training Pack

9. Implementation Sequence

July 15th

This is the final day on which we will book received goods into CICS before

closing it down. Therefore, Vendors should deliver all orders before July

15th.

August 2005

During the second half of August, Rolls-Royce will start sending out the

new Schedule Agreements and the latest delivery schedules. Commencing

September 2005, you will receive delivery schedules on a weekly basis.

Page 30: Vendor Communication / Training Pack

10. What Next ? - Webmeetings

Rolls-Royce Energy Systems Inc. offers you the opportunity to participate in a meeting via the Internet where we will guide you through this document. To participate in such a meeting you will need a PC and an Internet Browser. A Webmeeting will enable all participants to view the same document via Internet and all participants will be connected via telephone in order to communicate.

Your participation is not compulsary. However we recommend that you workthrough this document with the relevant department mangagers in order to understand our requirements and the actions you have to undertake to achieve them.

If you have questions concerning a specific topic you should contact yourcurrent Rolls-Royce Buyer.

Page 31: Vendor Communication / Training Pack

10. What Next ? - Webmeetings

If you have a general problem in understanding the new processes / ourrequirements then we strongly recommend that you will participate in one of the following sessions:

June 17th

June 23rd & 24th

June 27th & 30th

July 7th

July 11th

During the session we will go through this documentation page by page.Each participant can raise questions and our specialists will answer them.

Please confirm your attendence to [email protected]

Rolls-Royce expects you to meet all of our requirements in a timely manner.Please ensure your team fully understands the importance of these newrequirements.

Page 32: Vendor Communication / Training Pack

11. Summary of Essentials

1. Ensure everyone in your company is ‘aware’ of SAP and the changes that will affect

them.

2. Within SAP you are the ‘owner’ of your data and must inform Rolls-Royce of any

data changes as and when required.

3. Be ready to enter SAP data into your system when available.

4. Understand the implementation sequence as it affects your cut-offs / deliveries etc.

5. We can only accept deliveries in SAP if you quote line item numbers, plants and

storage location on your labels and delivery paperwork.

6. We can only pay you when your invoice quotes item numbers!

7. Prepare for commitment acceptance – you must play your part in “manual

commitment acceptance”, and you must keep the commitments you make.

8. To understand the implication, if any, of ‘C’ class parts on your company.

9. Ensure that your working practices are aligned to SABRe.

10. All deliveries after August 1st must include the SABRe compliant receiving label.

Page 33: Vendor Communication / Training Pack

12. Frequently Asked Questions

What is the difference between ERP and SAP?

Enterprise Resource Planning is about two things, namely providing an

integrated set of working practices along with supporting these with an

integrated set of information systems. In other words ERP is the cultural change

which the company is undergoing, whilst SAP is the supporting tool to help it do

so.

Should tooling & Raw Material lead-time be included in the Planning Delivery Time for

first make scenarios?

Yes, the PDT can then be progressively reduced.

How many characters are SAP Purchasing Documents and Item Numbers?

Purchase Order No is 10 characters

Item No is 4 characters

Page 34: Vendor Communication / Training Pack

12. Frequently Asked Questions

Will the CICS Purchase Order numbers be transferred into SAP?

No, SAP will generate a new purchase order number. However, you will find

the CICS purchase order number as a reference printed on the new schedule

agreements

How much visibility will Vendors see on SAP Delivery Schedule?

Between 6 and 24 months (including forecasts)

Can a Vendor suggest alternative quantities if they consider the Lot Size matrix not

to be the most economical?

Yes, but they must negotiate with their Rolls-Royce contact

Page 35: Vendor Communication / Training Pack

12. Frequently Asked Questions

Will my Rolls-Royce Vendor Number be transferred to SAP?

No, each Vendor will be allocated a new unique numerical code

Will there by any affect on Payments to Vendors?

If we have accurate data in the system, single unit prices and accurate documentation this should help to reduce the level of Invoice Query Notes and improve payment to Vendors

Remember: All invoices should be sent to Accounts Payable in the UK.

If raw material has a long lead-time, will Rolls-Royce accept a Planned Delivery Time of up to a year even on running parts?

Although one must have realistic, achievable lead times, we expect the Vendors to manage their business to agree shorter PDTs, given that they have WIP, Raw Material stock and pipe lines on running parts

Page 36: Vendor Communication / Training Pack

12. Frequently Asked Questions

How do we handle Rework material in SAP?

There is a Rework procedure in SAP for handling these parts on separate POs

Will Rolls-Royce schedule demands within the planned delivery time?

No, not without your agreement.

Will the Purchasing Documents call up a Drawing Issue Number?

No

How will conflicting requirements of the same material to different locations be prioritised if short deliveries need to be made?

Advise Rolls-Royce contact of such short delivery who will make the allocation decision in conjunction with the relevant MRP Controllers.

Page 37: Vendor Communication / Training Pack

12. Frequently Asked Questions

How will delivery performance be evaluated in SAP ?

Material is considered ‘on-time’ when delivered 5 working days early and zero days late to delivery date.

When will we be given the details of Vendor Evaluation?

Vendor Evaluation via scorecards will continue and be expanded from its current

position to include all Vendors

When SAP is implemented what will happen to arrears carried forward from CICS, i.e. will it be commitment accepted?

Ideally all orders will be satisfied within CICS, where this does not happen it will

be the MRP Controllers job to re-commitment accept.

Page 38: Vendor Communication / Training Pack

12. Frequently Asked QuestionsWhat if I want to change my Vendor or Material data in your system?

Discuss with your Rolls-Royce contact.

We have dealt with Rolls-Royce for many years, why should we believe anything will

be different?

The need to change behaviour is more important than the software. We have a

new internal organisation, introducing new roles to accommodate the necessary

change. We have commitment from the top down to encompass the required

behaviour and we have significantly invested in training programmes for all roles

specifically on behaviours.

How often will I receive updates of Purchasing Documents?

Delivery Schedules will be faxed every week following an MRP driven change. Where

required this can be overridden and printed locally by the Buyer/Parts Controller. All

other output documents will be printed locally and issued as and when required.

Page 39: Vendor Communication / Training Pack

12. Frequently Asked QuestionsHow does SAP handle Lot Sizing?

SAP allows Rolls-Royce to order exactly what they want. Where current demand

is 101 pieces, which are delivered in batches of 10, SAP will ensure that for the

final delivery, this is a quantity of 1.

Can anyone at Rolls-Royce agree to an additional charge without changing the

purchase order documents ?

No, the invoice received by Rolls-Royce must match the SAP purchase

document. The buyer is the only person authorised to modify the purchase

document.

Will Rolls-Royce stop continuously expediting me?

Yes, if you adopt the new behaviours in order that everything will happen on time, in accordance with your data. Exceptions should be highlighted to the MRP Controllers at the earliest opportunity, therefore late deliveries / expediting becomes the exception not the norm.

Page 40: Vendor Communication / Training Pack

13. Foreign Trade Import Data

Rolls-Royce require the Country of Origin, US content, Harmonized

Tariff code and Schedule B number to be disclosed for every item used

in our products.

This will be required on all quoted items in the future.