Vault 9 Project Update9th September 2009
Paul Pointon – Site Project Delivery Manager
LLW Repository Ltd
![Page 2: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/2.jpg)
Date: 11/03/2009 2
Overview of Presentation
• Vault 9 Design• Current Status
![Page 3: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/3.jpg)
Date: 11/03/2009 3
Vault 9Vault 9 Design
![Page 4: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/4.jpg)
Date: 11/03/2009 4
Plan Overview Scheme
ANDY – Can you insert the base site plan that you are using to show the new material facility plan – Showing the Current infrastructure
![Page 5: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/5.jpg)
Date: 11/03/2009 5
Proposed Development
![Page 6: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/6.jpg)
Vault 9 Liner Details
![Page 7: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/7.jpg)
Date: 11/03/2009 7
Vault 9Current Status
![Page 8: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/8.jpg)
Date: 11/03/2009 8
Bulk Excavation – 100% Complete
![Page 9: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/9.jpg)
Date: 11/03/2009 9
Rail Deliveries – Aggregate, Reinforcement & Ancillaries
![Page 10: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/10.jpg)
Date: 11/03/2009 10
Rail Deliveries – Port of Workington
![Page 11: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/11.jpg)
Date: 11/03/2009 11
Rail Deliveries – Millom Main Line Loading
![Page 12: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/12.jpg)
Date: 11/03/2009 12
West Outer Wall Construction - 95% Complete
![Page 13: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/13.jpg)
Date: 11/03/2009 13
Secant Pile Wall – 100% Complete
![Page 14: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/14.jpg)
Date: 11/03/2009 14
BES Bottom Layer - 80% Complete
![Page 15: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/15.jpg)
Date: 11/03/2009 15
Geomembrane, Geotextile & Drainage Layer – 45% Complete
![Page 16: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/16.jpg)
Date: 11/03/2009 16
Vault 9 Floor Slab - 22% Complete
![Page 17: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/17.jpg)
Date: 11/03/2009 17
West Inner Wall - 60% Complete
![Page 18: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/18.jpg)
Date: 11/03/2009 18
Partial Handover – 21st July 2009
![Page 19: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/19.jpg)
Date: 11/03/2009 19
Delivery Schedule
• Partial Turnover to Operations – July 2009
• Operational Safety Case Approved
• First HHISO –July 2009• Contract Completion –
January 2010
![Page 20: Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551bc3e9550346be588b4c68/html5/thumbnails/20.jpg)
Date: 11/03/2009 20
Vault 9Questions