Transcript of Variable Capacity Heat Pump RTF Sub-Committee June 12 , 2014
Slide 1
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Variable Capacity Heat Pump RTF Sub-CommitteeJune 12, 2014
Mira Vowles, P.E., CEM Emerging Technology Project ManagerBPA Energy Efficiency
Slide 2
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Meeting Topics
1. VC HP Overview (Mira)
2. VC HP Load Based Testing (Ron)
3. VC HP Field Test Results (Tianzhen)
Plus if time allows:
• School VRF energy-savings (Mira)
• Other VRF research projects (all)
• Suggestions for future meetings (all)
Slide 3
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Variable Capacity Heat Pumps (VC HP = VRF + DHP)
+
Ductless Heat Pumps
Variable Refrigerant FlowHeat Pump System
Slide 4
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Variable Refrigerant Flow (VRF) Systems
VRF systems, either heat-pump or heat-recovery models, provide heating and air-conditioning, with:
1. Inverter driven outdoor-unit compressors and condenser fans, providing improved part-load and low-ambient performance,
2. Multiple indoor-units with multi-speed fans, electronic expansion valves and integrated thermostats,
3. Refrigerant piping network for heat transfer,
4. Integrated control system, and
5. Ventilation provided by VRF system, natural ventilation or a dedicated outside air system (DOAS).
Slide 5
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
VC HP Sub-Committee
1. Sub-Committee of the Regional Technical Forum (RTF)
2. Purpose: develop and recommend VC HP measures with
a) high consensus methodology to estimate and verify electrical savings
b) specification for cost effective installations that ensures persistent savings
3. Minutes and presentations are posted at: http://www.nwcouncil.org/energy/rtf/subcommittees/vchp/Default.htm
Slide 6
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
VC HP Load Based Testing
Ron Domitrovic, with EPRI
Slide 7
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
VC HP Field Test Results
Tianzhen Hong, with LBNL
Slide 8
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Next Meeting 7/23/14 at 9 am
Suggestions for agenda items?
Slide 9
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Pre HVAC Retrofit (June 2006 - June 2009)
Post HVAC Retrofit (February 2010 - February 2013)
Post HVAC VRF Schedule Adjustments (March 2013 - May 2014)
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
389,608 334,147 294,245
55,461
39902
55461
Washington Elementary School Weather Normalized Annual Electricity Usage and Savings (kWh)
from HVAC Upgrade and Schedule Adjustments
kWh Annual Usage kWh savings from HVAC retrofit kWh savings from schedule adjust
Wea
ther
Nor
mal
ized
Annu
al k
Wh
Usag
e 14.2% 26.2%