13/02/12 Thomas Van Alstine, BBA Statement of Qualification

Transcript of Vanalstine Soq 2012

Page 1: Vanalstine Soq 2012

13/02/12

Thomas Van Alstine, BBA

Statement of Qualification

Page 2: Vanalstine Soq 2012

Van Alstine Project Examples

13/02/12

Page 3: Vanalstine Soq 2012

New Innovations – Supported

13/02/12

Carbon Fiber Tower

UAV – Utilized for Microwave Line of Sites

Reduced Weight (Airfreight Done from US to Australia), Green Environmentally Friendly, Simple Erection, fast Manufacture time.

Saved Millions of Dollars in reducing site visit times and requirements for Cranes on Greenfield Sites for LOS activities. Safety - reduced the necessity for tower riggers required to climb and photograph. Site Acquisition - provided Panoramic Site Photos and three-Dimensional Detail on Existing Tower Structures.

Page 4: Vanalstine Soq 2012

LTE - Fixed Broadband

13/02/12

Page 5: Vanalstine Soq 2012

Service Capabilities & Areas of Expertise

•  Project Management

•  Construction Management

•  Survey

•  Site Acquisition

•  Equipment/System Integration

•  Field Technicians & Installers

13/02/12

Page 6: Vanalstine Soq 2012

A Few Companies to which Thomas has a Working History of providing Services.

13/02/12

Page 7: Vanalstine Soq 2012

13/02/12

Thomas Van Alstine Full Range of Knowledge and Experience

Project Management

System Engineering

Site Planning

Installation &

Commissioning

Land –Use Planning

Site and Network Optimization

Turnkey Alternatives

Site Preparation

Site Acquisition

Page 8: Vanalstine Soq 2012

13/02/12

Thomas Van Alstine Project Management Perspective

n  Overall Project objectives and material lists well defined and characterized

n  Basis for Network Rollout established n  SOW for Services clearly delineated n  Customer communication during all phases of

design and implementation n  Scheduling n  Crew Assignments n  Reporting/Tracking

Page 9: Vanalstine Soq 2012

13/02/12

Various Types of BTS Sites

Rooftop Blacktop

Greenfield Co-Locate

Tenant Improvement

Cabinetized BTS

Antennas

Page 10: Vanalstine Soq 2012

Photos

13/02/12

AT&T Build

Page 11: Vanalstine Soq 2012

Photos

13/02/12

Ericsson Mini-link Microwave Install

Page 12: Vanalstine Soq 2012

Photos

13/02/12

Site/Tower Construction

Page 13: Vanalstine Soq 2012

Photos

13/02/12

Civil Construction