VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 •...

16
VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III – Capital Programs & Construction – SFMTA Shari Tavafrashti Principal Engineer – SFCTA 1

Transcript of VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 •...

Page 1: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III – Capital Programs & Construction – SFMTA Shari Tavafrashti Principal Engineer – SFCTA

1

Page 2: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

2

Project Purpose and Need

• Improve transit reliability, speed, connectivity and comfort

• Separate autos from transit

• Reduce delays associated with loading and unloading, and traffic signals

• Improve pedestrian comfort, amenities, and safety

• Enhance urban design and identity of Van Ness Avenue

• Accommodate safe multimodal circulation and access within the corridor

Page 3: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

3

Potrero BRT

Geary BRT

Geneva- Harney BRT

Van Ness BRT

3

BRT Network Context

• Rail does not go to north side of city

• BRT network proposed to fill in rail gap…

…and support local “rapid” + regional bus service

Page 4: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

Van Ness Service

4

47 / 49L

47

49L

Van Ness BRT Project

Existing Service: Route 47 / 49 • Route 47: Caltrain – North Beach • Route 49: City College - Fort Mason Proposed BRT: • Routes 47 and 49 serve existing routes, and will operate as BRT in the Van Ness project area. • Route 47 will use new

60 foot articulated hybrid buses.

• Rt. 49 will use new 60 foot trolley coaches.

4

Page 5: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

5

Features of BRT

Dedicated transit lane

Transit signal priority

Traffic signal optimization

1

2

3

All-door boarding and low-floor vehicles

Pedestrian safety enhancements

High-quality Stations

4

5

6

1

2 3

4

5

6

Page 6: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

Benefits of Van Ness BRT Improve transit travel times by up to 32% Improve transit reliability by up to 50% Increase transit boardings by up to 35% Maintain corridor person-throughput while

increasing transit mode share Save up to 30% of daily route operating costs Improve multimodal safety, including for

pedestrians

6

17.5 16.8

12.9

8.8 9.3 8.6

0

2

4

6

8

10

12

14

16

18

20

2007 Existing Alt. 1(No Build)

VN BRT Alts 3 and 4 (with DesignOption B)

Trav

el T

ime

Betw

een

Miss

ion/

Dubo

ce

Offr

amp

and

Clay

Str

eet (

Min

)

Bus (Route 49)

Automobile

8.7 Min Difference

4.3 Min Difference

Page 7: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

What is Important in Developing a BRT?

• Alternatives analysis is outlined in Chapter 10 of Environmental Impact Study / Environmental Impact Report

• 36 indicators grouped into categories based on Project Purpose and Need as well as issues of importance to stakeholders and decision-makers

• Transit Performance

• Passenger Experience

• Access and Pedestrian Safety

• Urban Design/Landscape

• System Performance

• Environmental and Social Effects (includes tree preservation)

• Operations and Maintenance

• Construction and Capital Costs 7

Page 8: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

Station Locations

• Routes 47 and 49 will provide BRT service upon entering the corridor

• Concern Regarding:

• Traffic diversions

• Left turn removals

• Visual effects, including trees and landscaping

• Transit stop consolidation

• Transfers and Route Connectivity

8

Page 9: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

9

Conceptual Visual Simulation Center-Running BRT with Right Side Loading / Center Median and Limited Left Turns

Sutter Street Station

Page 10: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

LPA: Center-Running BRT with Right Side Loading/Center Median and Limited Left Turns

Locally Preferred Alternative (LPA) recommendation selected by the SFMTA board in May 2012 and by the SFCTA board in June 2012 Grove Street to Turk Street (Conceptual: Not to Scale)

Page 11: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

11

LPA: Center-Running BRT with Right Side Loading/Center Median and Limited Left Turns

O’Farrell Street to Post Street (Conceptual: Not to Scale)

Page 12: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

12

o Fire Hydrant o Curb Ramp o Pavement Rehab Sewer Line Relocation o Water Main Reconstruction Other Utilities

Major Elements

Boarding Island Dedicated Bus way Median Landscaping Refuge Curb Bulb Catch Basin

4 1

2 3

5

1

6 8

2 3 4

9

7 8 9

5 10

12 6 11

7

10 11

Page 13: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

Separate but Related Projects • Overhead Contact System / Poles / Lighting • SFGo Traffic Signal System Upgrade / Replacement • Vehicle Procurement • Radio Replacement • Sewer Work • Water and Auxiliary Water Supply System • Other Utilities

13

Page 14: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

14

BRT Fleet Procurement

Page 15: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

BRT Project Cost Summary

15

Estimated Cost $125M

Committed Funding $105-108M

• The estimate does not include the majority of the cost of replacement vehicles (local or federal), electrical overhead lines replacement, new streetlights / poles, and signal priority which are funded separately.

Page 16: VAN NESS AVENUE BUS RAPID TRANSIT · • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival

Project Schedule

Milestones • Feasibility Study Completed Dec. 2006 • DEIS/DEIR initiated Sept. 2007 • FTA Small Starts Approval Dec. 2007 • DEIS/DEIR Scoping Completed April 2008 • DEIS/DEIR public review Nov.-Dec. 2011 • Adoption of Locally Preferred

Alternative (LPA) June 2012 • Caltrans Project Report / Start 30% Design Spring 2013 • Final EIR/EIS – Record of Decision (ROD) Fall 2013 • 30% Design complete Spring 2014 • 100% Design complete Summer 2015 • Arrival of new transit vehicles 2015 - 2016 • Construction period Fall 2015–Winter 2017 • Revenue Service Spring 2018

16