Rhode Island Convention Center • Providence, Rhode Island Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang LaSalle August 10, 2016

Transcript of value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits...

Page 1: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Rhode Island Convention Center • Providence, Rhode Island

Driving value through integrated energy retrofits

Session: Operation Strategies

Crissy Haley, LEED EB:O&MVice President

Jones Lang LaSalleAugust 10, 2016

Page 2: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

Integrated Energy Retrofit

2

The best way to

improve the  energy efficiencyof a building is by taking a holistic approachto energy projects and financial measures 

to achieve an optimal result.

Page 3: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade3

Steps to Success

Page 4: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Benchmarking• Set up Energy Star Portfolio Manager account

• Capital Budget Review• Review current capital projects• Review timing and priorities• Sort projects by energy impact potential

• Energy Study• Engage qualified engineer to review all aspects of building energy 

consumption

• Baseline Energy Model• When considering multiple projects at once, create energy model 

(eQUEST, Trane Trace, etc.) against which potential projects can be compared

4

Identify Opportunities

Page 5: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Develop Scope of Work• Interview potential vendors• Conduct a site walkthrough• Request preliminary proposal

• Quantify Potential Savings• Energy Model‐ if evaluating multiple ECMs, model will help create optimal packages. 

• Energy Analysis‐ if evaluating one measure, it may not be worth it to pay for a model.  Alternatively, work closely with vendor to determine how savings were derived.  

5

Evaluate Savings

Page 6: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Develop Turnkey Pricing• Identify potential installers who will work with manufacturer

• Request proposal, level bids and interview bidders

• Confirm Warranties• Labor and material

• Verify Incentives • Assume the minimum.  Some incentives are difficult to capture as they require coordination between different groups (CRES, accounting, etc.)

6

Evaluate Costs

Page 7: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Balance Financial Return and Energy Savings

• Building Valuation Calculator

• ECM Cash Flow Calculator

• Financing• Power Purchase Agreement (PPA)• Operating Lease• Energy Performance Contract• Cash Purchase

7

Develop Business Case

Page 8: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade8

Develop Business Case

Page 9: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade9

Develop Business Case

Page 10: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade10

Real Estate Financial Analysis

Direct Capitalization for Valuation

V = NOI1 / R0

V is valueNOI1 is the projected income over the next 12 monthsR0 is the capitalization rate.

Page 11: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Create drawings and specifications• Finalize budget• Establish schedule• Award• Oversee installations, process changes, training and project commissioning

11

Implement

Page 12: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Measure and Verify• Benchmarking• Annual Model Reconciliation• IPMVP

12

Measure Success

Page 13: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

• Engagement at landlord tenant  occupant levels

• Start with a general awareness campaign establishing goals and priorities

• Develop a Green Council• Highlight Success Stories

13

Stakeholder Engagement

Page 14: value through integrated energy retrofits€¦ · Driving value through integrated energy retrofits Session: Operation Strategies Crissy Haley, LEED EB:O&M Vice President Jones Lang

Energy Exchange: Federal Sustainability for the Next Decade

Thank you

Crissy HaleyVice PresidentJones Lang [email protected]

14

Final Notes