Valsir References

7
P.O. Box: 48432, Abu Dhabi, United Arab Emirates, Tel: +971 (0)2 667 0622 Fax: +971 (0)2 667 0621 Email: [email protected] References Catalog Sustainable Engineering Solutions

Transcript of Valsir References

Page 1: Valsir References

P.O. Box: 48432, Abu Dhabi, United Arab Emirates, Tel: +971 (0)2 667 0622 Fax: +971 (0)2 667 0621 Email: [email protected]

References Catalog

Sustainable Engineering Solutions

Page 2: Valsir References

Sustainable Engineering Solutions

Marina Hotel

2008

Yas Island – Abu Dhabi

HDPE and TRIPLUS pipes and fittings

Sets the standard for exceptional service

throughout its 499 impeccable rooms and

suites, 12 innovative dining venues and

lounges. Formula 1 track built to pass

through the hotel, Watch high-speed races

and practices from the hotel daily.

Alloft Hotel

2009

ADNEC – Abu Dhabi

PP & TRIPLUS Pipes and Fittings

408 spacious loft-inspired rooms &

suites.

Crown Plaza Hotel

2008

Yas Island – Abu Dhabi

HDPE Pipes and Fittings

428 stylish guest rooms and

suites

AL Raha Beach Development-Al

Muneera Project

2009

AL Raha Beach - Abu Dhabi

TRIPLUS Pipes and Fittings & PP Pipes

and Fittings

A neighborhood offering a mix of

luxury living in magnificent villas with

waterfront views, as well as

distinctively designed multi-storey

apartment buildings

Some of our Landmark Projects

Page 3: Valsir References

Sustainable Engineering Solutions

Abu Dhabi Investment Council

2010

Abu Dhabi

HDPE Pipes and Fittings

An innovative honeycomb structure

was designed following the analysis

of high-efficient load paths.

Nation Towers

2009

Abu Dhabi

TRIPLUS Pipes and Fittings

Tower 1 will be made up of 64 stories, and

Tower 2 will feature 51 stories, with each

tower offering its own unique blend of

luxurious facilities. The loft apartments will

be located in Tower 1, offering 360

residential units.

Dubai University Hospital

2009

Dubai

HDPE Pipes and Fittings

Providing a range of services for a 400-

bed tertiary care teaching hospital

development in Dubai

Central Market Tower T2 & T3

2010

Abu Dhabi

Tallest building in Abu Dhabi –

88 storey

HDPE Pipes and Fittings

Some of our Landmark Projects

Page 4: Valsir References

Sustainable Engineering Solutions

Presidential Palace

2011

Abu Dhabi

Multilayer, HDPE & Silere Pipes and

Fittings

Made up of a main building and four

wings

The main palace itself will be 160,000

square meters

Arzanah Medical Complex

2010

Abu Dhabi

HDPE Pipes and Fittings

The Complex house three specialist

healthcare facilities: Wordily Spine

Centre, the Abu Dhabi Knee and Sports

Medicine Centre and a wellness and

diagnostic center

Abu Dhabi Court House Complex

2011

Abu Dhabi

PP & TRIPLUS Pipes and Fittings

The 40,000 sm (430,600 sf) 7-story

complex is a programmatically complex

facility, containing 37 courtrooms and

housing 16 major functional components

Capital Gate Hotel

2009

Abu Dhabi

TRIPLUS & SILERE Pipes and Fittings

167 guestroom and 22 suites, Guinness

Book of World Records certified Capital

Gate as the "World’s furthest leaning

man-made tower."

Some of our Landmark Projects

Page 5: Valsir References

Sustainable Engineering Solutions

Al Ain Oasis Hospital

2010

Abu Dhabi

HDPE Pipes and Fittings

1st private hospital accredited in

the emirate of Abu Dhabi joint

commission international

Muscat International Airport project -

MC-1, Mc-3, & Mc-5

2011

Muscat - Oman

HDPE & PP Pipes and Fittings

The new terminal at Muscat

International Airport would be

completed by 2014 and will have the

capacity to handle 12 million

passengers annually.

Dubai International Airport C3

2011

Dubai

HDPE Pipes and Fittings

Expanded airport’s overall

capacity of 60 million passengers

City of lights plot

2010

Abu Dhabi

TRIPLUS Pipes and Fittings

Located on Al Reem Island, 600 meters

off the coast of Abu Dhabi, the City of

Lights shines as a new residential,

commercial and business district

Some of our Landmark Projects

Page 6: Valsir References

Sustainable Engineering Solutions

Project Date Location Product

Burj Al Salam Mixed Used Development 2011 Dubai-UAE HDPE Pipes and Fittings

Latifa Tower 2011 Sharjah-UAE HDPE Pipes and Fittings

Guardian Tower 2010 Abu Dhabi-UAE TRIPLUS Pipes and Fittings

Island City 2009 Abu Dhabi-UAE HDPE Pipes and Fittings

Al Gurair City Expansion Ph.2 2011 Dubai-UAE HDPE Pipes and Fittings

Fujairah Commercial Complex 2011 Fujairah-UAE HDPE Pipes and Fittings

Al Ruwais Housing Complex 2010 Abu Dhabi-UAE HDPE Pipes and Fittings

Royal Car Parking Building 2011 Abu Dhabi-UAE PP and Pex Pipes & fittings

Emirates National Schools 2011 Abu Dhabi-UAE PP Pipes and Fittings

Sofitel Hotel Staff Accomodations 2011 Dubai-UAE PP Pipes and Fittings

6 Villas for Shk. Al Qasimi 2011 Sharjah-UAE TRIPLUS Pipes and Fittings

Habtoor Grand Resort & Spa 2011 Dubai - UAE PP Pipes and Fittings

Deerfield Square Center 2011 Abu Dhabi-UAE PP Pipes and Fittings

Bloom Central Hotel 2012 Abu Dhabi-UAE PP Pipes and Fittings

Centro Hotel-Capital Center

2010

Abu Dhabi

PP & TRIPLUS Pipes and Fittings

Hotel building comprising 4 basement

levels, 2 podium levels, a ground floor

and 26 additional floors that will offer

400 rooms

More References

Some of our Landmark Projects

Aviation Club Hotel

2011

Dubai

PEXAL Pipes and Fittings

291 Rooms

The 1st Under floor cooling

project

Page 7: Valsir References

Sustainable Engineering Solutions

Contacts

P.O. Box 48432, Abu Dhabi UAE

Telephone: +971 2 6811023

Telephone: +971 4 8847433

Fax: +971 2 6811238

Fax: +971 4 8847432

Website: www.richmondses.com