EDER MANOSALVA PAREDES
EV VALOR GANADO
AC COSTO ACTUAL
CV VARIACION DE COSTO
PV VALOR PLANEADO
SV VARIACION DEL CRONOGRAMA
PREGUNTA N°01
COSTO
EV= 20
AC = 30
CV = -10
CPI (IRC) = 0.67
CRONOGRAMA
PV = 40
SV = -20
SPI (IRP) = 0.5
3 UD, ES PMP
MONTO TOTAL = 300,000.00
TOTAL EN MESES 18.00
MES PV
1 16,666.67 16,666.67
2 16,666.67 33,333.33
3 16,666.67 50,000.00
4 16,666.67 66,666.67
5 16,666.67 83,333.33
6 16,666.67 100,000.00
AVANCE
PROGRAMADOACUMULADO
-
8/19/2019 VALOR GANADO EDER MANOSALVA
2/6
7 16,666.67 116,666.67
8 16,666.67 133,333.33
16,666.67 150,000.00
10 16,666.67 166,666.67
11 16,666.67 183,333.33
12 16,666.67 200,000.00
13 16,666.67 216,666.6714 16,666.67 233,333.33
15 16,666.67 250,000.00
16 16,666.67 266,666.67
17 16,666.67 283,333.33
18 16,666.67 300,000.00
4 !UE TAREA SE ENCUENTRA TERMINADAS
ACTIVIDAD PV AC EV CPIE"CAVACION 500 2000 45 0.25
#ASE 2000 3500 15 0.57
ENCO$RADO 3000 2000 3000 1.50
CONCRETO 1500 1200 500 0.42
$RAGUADO 1000 600 500 0.83
5 DATOS
AC = 10,000.00
EV = 8,500.00
CV= -1,500.00
6 DURANTE LA ACTUALI%ACION
AC TOTAL = 40,000.00
AC = 10,000.00
PV = 20,000.00
EV = 15,000.00
CV = 5,000.00
CPI = 1.50
SV = -5,000.00
SPI = 0.75
-
8/19/2019 VALOR GANADO EDER MANOSALVA
3/6
166,666.67
-
8/19/2019 VALOR GANADO EDER MANOSALVA
4/6
SPI0.0
0.8
1.000 RPTA
0.333
0.500
-