Valley South Subtransmission Project · Valley South Subtransmission Project Powering the Region...

2
Valley South Subtransmission Project Powering the Region for the 21st Century 2244 Walnut Grove Avenue c/o Public Involvement & Education GO 1, Quad 4C, 474B Rosemead, CA 91770 SEPTEMBER 2014 PROJECT UPDATE The Approval Process SCE will need to submit an application for project approval to the California Public Utilities Commission (CPUC), which is the state regulatory agency that sets electricity rates and authorizes the construction of certain electrical facilities. SCE’s application will include a Proponent’s Environmental Assessment, which will evaluate the environmental impacts of the project. Project review and approvals may be needed from other agencies. Project Timeline Late 2014/Early 2015: Anticipated date we will submit our Permission to Construct (PTC) Application to the CPUC. Late 2017: Anticipated start of construction. Late 2019: Anticipated project completion date. Project Contact Information For more information about the project, please call the project hotline at 1-866-785-7057 or visit www.sce.com/valleysouth. If you have questions or comments about the project, please contact your local SCE public affairs representative: For Riverside County: Louis Davis [email protected] or 951-249-8468 For Menifee: Ray Hicks [email protected] or 951-928-8238 For Murrieta and Temecula: Jeremy Goldman [email protected] or 951-249-8466 View of the existing condition as seen from Suzi Lane, east of Shree Road, looking north. <<OWNER NAME>> <<MAILING ADDRESS>> <<MAILING CITY>>, <<State>> <<Zip>>

Transcript of Valley South Subtransmission Project · Valley South Subtransmission Project Powering the Region...

Page 1: Valley South Subtransmission Project · Valley South Subtransmission Project Powering the Region for the 21st Century 2244 Walnut Grove Avenue c/o Public Involvement & Education GO

Valley South Subtransmission ProjectPowering the Region for the 21st Century

2244

Wal

nut G

rove

Ave

nue

c/o

Publ

ic In

volv

emen

t & E

duca

tion

GO 1

, Qua

d 4C

, 474

BRo

sem

ead,

CA

9177

0

SEPTEMBER 2014 PROJECT UPDATE

The Approval ProcessSCE will need to submit an application for project approval to the California Public Utilities

Commission (CPUC), which is the state regulatory agency that sets electricity rates and

authorizes the construction of certain electrical facilities. SCE’s application will include a

Proponent’s Environmental Assessment, which will evaluate the environmental impacts of the

project. Project review and approvals may be needed from other agencies.

Project Timeline• Late 2014/Early 2015: Anticipated date we will submit our Permission to Construct (PTC)

Application to the CPUC.

• Late 2017: Anticipated start of construction.

• Late 2019: Anticipated project completion date.

Project Contact InformationFor more information about the project, please call the project hotline at 1-866-785-7057 or visit www.sce.com/valleysouth. If you have questions or comments about the project, please contact your local SCE public affairs representative:

For Riverside County: Louis Davis [email protected] or 951-249-8468

For Menifee: Ray Hicks [email protected] or 951-928-8238

For Murrieta and Temecula: Jeremy Goldman [email protected] or 951-249-8466

View of the existing condition as seen from Suzi Lane, east of Shree Road, looking north.

<<

OW

NE

R N

AM

E>

><

<M

AIL

ING

AD

DR

ES

S>

><

<M

AIL

ING

CIT

Y>

>, <

<S

tate

>>

<<

Zip

>>

Page 2: Valley South Subtransmission Project · Valley South Subtransmission Project Powering the Region for the 21st Century 2244 Walnut Grove Avenue c/o Public Involvement & Education GO

Valley South Subtransmission ProjectThe Valley South Subtransmission Project is Southern California Edison’s proposal to upgrade

the region’s existing electrical infrastructure and improve overall electrical reliability in the

cities of Menifee, Murrieta, Temecula, Wildomar and portions of southwestern Riverside

County including French Valley and Winchester.

Project NeedPortions of SCE’s existing electrical infrastructure serving the area are near or at their operating

limits. Much of the electrical infrastructure that serves our communities today was built decades

ago, when the typical household’s electrical needs were very different. The proposed project

addresses increasing electrical usage by residents and businesses in the area. The proposed

project is necessary for SCE to continue safely providing reliable power to our customers.

Project Description• The proposed project will be approximately 15 miles in length

• Construction of a new 115 kilovolt (kV) subtransmission line from our existing Valley Substation in Menifee and ending east of our existing Auld Substation in Murrieta

• Reconducter (install new conductor wires) on approximately 3.4 miles of an existing 115 kV line from east of our existing Auld Substation in Murrieta to west of our existing Triton Substation in Temecula

• Install communication equipment inside mechanical buildings at existing area substations to support the proposed Valley South Subtransmission Project

• Equipment modifications at Valley Substation in Menifee

AULDSUBSTATION

TRITONSUBSTATION

SG

GI RB

MCLAUGHLIN

EEFINE

M

CLINTON KEITH

VALLEYSUBSTATION

MATTHEWS ETATS

NOYL

MAYBERRY

CLINTON KEITHPALOMAR

EEFINE

M

FLORIDA

SCOTT

MURRIETA HOT SPRINGS

LOS AL

AMOS

BUNDYCANYON

WIN

CHES

TER

NEWPORT

KALMIA

SIMPSON

STETSON

DROF

NATS

BENTO

N

ATEIRRU

M

ETHANAC

DOMENIGONI

9TH

CENTR

AL

GLENOAKS

CHERRY HILLS

IVY

LEMON

GRAND

PINACATE

OAKLAND

RIVER

ALDERGATE

WASHINGTON

NICOLASJEFFERSON

MARGARITA

JACKSON

RAILROADCANYON

NUTMEG

ANZA

MLAP

OSO ORO

BUCK

GOETZ

RANCHOCALIF

ORNIA

MUSTANG

BENTON

NORMANDY

SAN

JACI

NTO

NERRAW

SG

GIRB

NOEL

NOEL

VACATION

BRADLEY

BEARCREEK

NOSRE

DNAS

NORTE

DE

PORTO

LA

WAS

HIN

GTO

N

HANCOCKBOREL

SAGEGIBBEL

£¤215

·|}74

·|}79

RIVERSIDECOUNTYCITY OF

LAKEELSINORE

CITY OFWILDOMAR

CITY OFCANYON LAKE

CITY OFMURRIETA

CITY OFPERRIS

CITY OFMENIFEE

CITY OFTEMECULA

CITY OFHEMET

CITY OFSAN JACINTO

LEGEND

Proposed ProjectProposed 115kV Subtransmission Line

Common to Both

Alternative ProjectAlternative 115kV Subtransmission Line

Existing FacilitiesTerminal TSP

Substation

Valley South Study Area

215

15

215

15

Map is not drawn to scale.

The purpose of this map is to show only relevant routes and substations.

Not all SCE facilities are included.

The Project in Your AreaMenifeeNear Valley Substation: Install

new 115 kV subtransmission

line and equipment

modifications at the Valley

Substation.

Near Scott Road: This area is

part of the alternative route. If

the alternative route is selected

instead of the preferred route,

then we would install new 115

kV subtransmission line.

MurrietaThis area is part of the

alternative route. If the

alternative route is selected

instead of the preferred route,

then we would install new 115

kV subtransmission line.

Riverside CountyNorth of Benton Road: Install

new

115 kV subtransmission line.

South of Benton Road:

Reconducter (install new

conductor wires) on an existing

115 kV line.

TemeculaReconducter (install new

conductor wires) on an existing

115 kV line.

Simulated view of the proposed project from a neighborhood trail along Old Leon Road, looking southwest.

N