Valley Electric APPLICANT SLCAIP HYDRpQWER POST 2024 ...
Transcript of Valley Electric APPLICANT SLCAIP HYDRpQWER POST 2024 ...
Colorado River Commission of NevadaApplication for Allocation of Salt Lake City Area Integrated Projects Power
Tins form was created in ?viicrosoft Word and a digital copr is auaiiable on (lie Colorado Rue, ‘o,n,nissio,, of Nevada’s(CRCN!’J website: www.crc-nv.eow. If the form is opened in MicrvsoJ HorS, responses ‘nor be entered directly into the textboxes which ivill atpandas needed to accept the text entered. Alter,ialiveij additional pagesfor lonr recponses ma) be attachedb; (lie App!icant. Applicants are requested to clear/i’ identifi’ on oar attachments the Applicant’s ‘wine and (lie related numbereditem on (lie for,,,,
ALL lI’I’LIC’A TIONS AND INUORMA TIONSUIfMITI’ED TO JilL CRCN!’ IV ILLBE CONSIDERED PUBLIC RECORDS SURfECT TO PUBLiC D1SCLOSIJRE UPON REQUEST.PLEASE SEE NOTE A TM (lIED TO TillS ,41’PLICA nON FOR Al FOR MORE INFORMATION.
Completed applications inns! be received bj’ the C’RC’NV by 5:00 p.m. PDT on:
MONDAY, JULY 16, 2018
1. Applicant Information. Please provide the following:
a. Name and address of entity/organization requejpg and allocation:
Person(s) representing Applicant:Contact Person I
Title Ramon Abueg, Chief Operating OfficerAddress 800 E Highway 372. P0 Box 237
City. State, Zip Pahrump, NV 89041-0237
Telephone (775) 727-2746
Fax (775) 727-6320
Email Address [email protected]
c. Was the Applicant or its predecessor in interest, a customer of the CRCNV on July 16,1997?
Yes X No
d. Is the Applicant the Southern Nevada Water Authority or one of its member agencies thatwill use the allocated resource for its water and/or vastewater operations in accordancewith NRS 704.787(b)?
Yes No
e. Provide the amount of Salt Lake City Area Integrated Projects (SLCAIP) availablecapacity and energthe Apjilicant is renuesting.
Kilowatts (summer,) Kilowatts (still ,mer20851 kW (All) 37,944,500 kWh (All)
Kilowatts (JI’interj Kilowatts (tvinter,)27,414 kW (All) 50,267,119 kWh (All)
Entity Name Valley Electric Association, Inc. ‘
Address 800 E Highway 372, P0 Box 237City, State, Zip Pahrutnp, NV 89401-0237
x
Application Due: By 5:00p.m. POT, fatly 16. 2018 Page I o19
2. Aiiid iniiit I)i,Ii:
HIIorical I)emiid;
i, I’ro’Ude the aclitil monthly rnnirnurn demand (kilowalk) vperlcatd from ()ctobcF 201$ihrough Morch 2018. ,N’nre: For ghost’ appi-tng Jut paii’er hi h, inctiTh fht* raW, aiict4stins1eiiwte, operations pkaceprl?v14k iimash! ;‘ €1u/ri rffrccsii’ nialed to ssu’Ia inc.
(ktlIIS %o,lCl Pee — Ja•$U ‘.b.20hI %l, l0Itin
B7.5570 n4.76655(i j 122.843000 120.866000 ¶24.326090 91448.850
4pt 34I %ta 3016 h*2014 J.t 21116 A2*ib SepL 2Q14
6213705091282970 12986 690 133e8770[ 122 6B780iO393460
PñiFWi&IiiJ
Dennad(ktknjtLiI
IVSVi1fl ox7a’t’t!4(Hi. 2fl16 Dci, Z016 3*.. 21117 11n. tot?
73,12S.530
Apr. 2Ul7
Demind
I06,968.4t0
- %Is, loll
122,2443%
Jija 201’
68.41a210 fl8.425450
118 988 320
Jul.2017
Fib. $fl
103242.960
Aug, 2017
¶3,2.8.64 660 132,468ago j 125075 260
mt2I1
102,670.630
Scpt 21117
118,974.590
73914010
Dcc.Nl7
€9125110
Jia Zals kit 20fl
iio.egi.g€oShr, 2S1$
121.465 430 110.041210
ijy’Ir& scion f), C: : (Al? p tvi I’t)i, In 1 261$ Pagc 2 p19
IL Aplicart’s t’oncr keoiirces. flensc preside tlir trtergy reso*Iiees in kWh that weredelivercd (schctlnlcd) to sent AppliciinCs load from October 2015 through Match 2018during stbtidnnl ()n.l’eak and OfT-pck Pcriods, as ileflncd h5 the North AmericanElectric HeIihIIiL ( or(NIrMton (‘NFR(’”l, iielhtred rco.:rccs should total up In (heloads in each pcl’icI43.
NVK( t)riI’cal Pirbid
ippflcwth’n iJi r. $i’ S fr pitt PD? Jieii I , ?ufl Pate 3 01 9
I Year 1h16 rSt%...
w: ;‘t’ I)r(,2OIL JEL2êt6LWi
15440000,;
l5t69,&
1711000
21 ,76,Ei3?
Ifrnner (kWh)
___ ____
1786000
Punh.,ed-
-
lonil Iutlal(cnersIioII
__—
Rcnc.’ aI,lekvoqr.cc.J)Om-l’tak load
h) lob! of I &W3&S43rc,ogrccs
- 1Mi -
1608000
17,OG1MSO
1547000I CC’ FM
1981982?
$16 I
2906000
20,800)54
cy
_____
2 cc12.g37 24.33.3,622
26 Jocc421,815,856
____________
kWh
3007000
22 743.424
ktrfhk 29920002824000 3241000MA. ‘xc”-r r’X’.
,:wh 1’.4tY)bIjl3&9s.o5I 23,8l&5O
luau II ientraii..a
I tl.whl-. -- —
Rv,,n, aIkIkr,oiirtt.LkWhL I(k-Ink I(kWh) IntjI of 17.94Q.5-51 10.233051!fl’,urC(% alpoe L. -
0
3467000
25.821,89.1
277 10O0
17 299,032
29,454.424 32.238.894 fl.89,032
r
_
_
SIX’MPjflb)
_______
¶ e.87 Ma
until Fueled(,tflrstio.
Rtn.tsblcResoc.rcn 2209000
On•PnkI,oLd 1(kWb) toni of ¶9.09Q,SSSreiilItn about j
4gIktU1v* Thir: lit’ 5:aOp..n I’))?. Jul. 04. lull Pi’gc 4 oIc
I “VAd r7flT
___________
Oil, iDlekwh hwh.
-.
I B2 1000
IIsb%trQtfl)Pa,Ler.Dnk(kWh)
Fossil Fueled
Nê,it6-‘4-
1463000,
Jn. O)7kWh
is’
rtk$15kwh
Macif?kwb
2,t
1597000
R.390317
1559000
i9,09.136
793000(,.grgj4na
c5fl. —IIcot,shkKcso.rces
Oa-PeaL I nid(k% Ii) 1 ciii iffl%iiiirce. shine
1460000
¶2.17)673
1414000
115.gO,14R 12.619,099
17,857,148 19,525,099 25,W5,3
M9*fl lilt?
2653000 2969000
25M25,138
jjflb.r (kwh)
SISAl!’ tjWhJ_4Pnrhssed
. (k%IQ —
Foisil 1-oiledGvaernin
V W’ ii
2195000
8274,006
20,09,673
iSnZQll
9.872.940
2384000
sf1’. iN?kWh
2375000‘1!
¶3,74B,421
1972000
r,Y.
II .3221,S2
2750000 2926000
l6.4fl,017
i4cmenhkkc,ourcc, 2103000
Oii-1nk loadllS h) lout ef 1 7,1 h3 ‘6,ncurcts *6cst
21455,406
1955000
3) 194.406
22.376.961
2114000
32,783.981
2452000 2351000
21,941.652 29,ble,017•
___
--—--
4LL!St ‘_,__,.__.a •riir?:i ..‘. IOct l1 Stf.$iT I Dec.2011 Jia211’I Ii•. 1$.
iWt k’s) j_ LUL__‘:_‘
iii.z
1594000
1? S56,141
tv,’flt
1556000
12.318,766
1632000
18,7(s7166
“nat -
139100&2230000,
t$.647,498 ¶ 1,947,08)
1415000
17,775,484
1125000
73 462 4133
1445000 1789OOO
2j4j,2aS2B.49B
2037000
19,669,081
NI:RC ()If.I’e3k I’t1utI
n.. 2015
Ho.lflHsTØ .v.sJ P&&•
zrr’ 1160000j 1337000MIfl) A
jt°°rIniI Irt;eJljrncrslk.n(k%%h)
sbkKfloitra,
()n.I’t.k I.njul(L%Vb 1 ;sL mlrioiirttt ôrnt
Apr. ZOlo
________________
IWhIJnn (k%%h)P.rktr.I)srk I(kwh)
______
jfljWhI’urdiaid
ris 1-titini
ItcmniablcKsogrcc
()c.Pe4 loid(LW I) Inul of It’flh,rtC. a1>oj,J
tf’ftJL4IIIOFJ ‘i. ft_r 3:O(.’pur. I’d’I, Stilt 16, 2u?#
p&,aoislWIt
1235000
2i13FA6
4r11170%
1399000
28 147.401
14.2016
1157000
IR875872
I5,9423X) 2413,497
4ls 301Cfl
_________
LW).l.flY)
s19646 3i f?I,4O 22,079112
lijoir’ Eii1IILWb
SiIIl 2OI
2298000 2705000P.’’)
S2559000
“swx
43.265,069 I
cr. 2’31S
2299000
20315287
2049000 2460000 2000000$I4(O
12,433,99? 14419j819 141,S21 23,691.476 21072,1S7 16,266,287
19,112 ?18 23016,521 29,901.4/5 74,598,13/
5 uP)
(k%%IiUcce., .hk
()n-Pc.k 1.1111)4kWh) 1 bIäIVt l9,.sS.7dlrflnwrcc% .Iwit
P.rj.sr-flnI.-
Pimrrh.u’d
I’s’i1 fidelCtflcraI,nn
keiicw*htcltc’ouwcc’ 1150000(k%Ii)
_. LOn’I’c.k I(k%%h) InIjl of 18,422,676
‘:22057Oct Z1116
kwh kwhIke 2I
kwh
Psrker.Pj,h 1(kWh) _-_-_j
I’oncr(k%kJ1otiii I’jiekdGe it ersIm’
3aa7017kWh
1372000
4
1345000
.-Mr-1
1 3,,96.78l
1387000I pt;.:,
17xco
1201000I I:.
15.809,567 26162,S37 25,221680 I7.O2878’
__2i.
2956000j
1o.o23,43.e I
269000
3Ø,Ig1j,557 30,145,74220,GOS, S67
561000 827000
21.302,636
- nil —
3094000 2875000
Art loll InZVIT Jnt lOll , 4th-2Gll Aç2Gl S.p.14fl7kWh IWhh kwh laTh
19,182,261
14X&DC
2320000 2716000t4w,..
lGxc
s,831A76 9932,O59 182S1,Th9 24
2540000
2OS,’/62 19,112,781
2697000
16.073 lot’
993000 852000 1084000
19063101 23.071 ,3
815000 1020000
32,463,521 26,460,458 22.80t5.018
Ftb.2IflS j Mn,kWhj kWINJ
1270000 32410001—
19,069575 14,956,876
668000
26,lSe,302
764000 78900c
23467,308 22,29g,45$
.4p1ihrrsken Bi 5tN)p,rn Pill. Jiiti 16, 28M I’agc 6t,19
t. Future l)L’,IIj,ncI:
lalcolily 1a) (jich,n ür conditk,ns hctwctn (lie alatc t4 ihk Appllcitlion anal ()ciulnr 32013which .uy increase nr p!tdS an nicyuvbj9,.ur inure:
AtGrrnFwnsNwMOroon
____
-
____
- Zil ‘Ira ii %lii i%%ion:
I’olnB of delis cr.4ocsiIiin Iii encrg$ (1(11% cr3: Pr4ni4I( the Applicani’s rcqueIt’tl uint(s)of clciicry vu the Pinker-Davis Trnnsnñsion S(cin. abc ol(ngv of scnkt rcqun’cd arIdthe cnp2city desired. The (:R(NV’s authoriied prilill(s) of delivery include AtturgonSnbslatrnn,i.cSubsta(ionHouldr(rflp( hrk lie, arid Mcsd%ulniia(iun — —
______
Md or AmalaOia 13jY$ubAa1nri
_________
C. AI)ilIit to 113c:
l’rosIiIc ii lricrcspliaiiicion of the Applicant’s *UiIity lv rccci.c and Un’ hit’ rt’c;ucstt’tlrnourcc ns o[Oç;utwr 4,2024.
_____ ______ ________
(TEE•E*’iE•EE’r”
____ ____
3, Pnwjdv a slatcrnçn( from the Applininl identifyint 11w benefit 1c the stale Iron theirreceipt of (he ulloeatcd tC*GLirte. Applicants sttniild demonstrate lunv receipt of theallocaLed resource ouId provide (he “gretesL pt’%’.ihl henerit Lo this state” Ifapplicahie.Applicant shi u1d u Iso demonstrate htn loss of .111 CN I stiah at ILication nnild impact theApplicin1 to the detriment ol the state.
•*?._ 4b )43w — mSS. F43l_o4ah
eej a. ...p,t .e,,434 •...sS.i bfl% r1. .,.jd%j1*!4.N .t.osju .,‘...,‘.,n,w b,,,k. —-w. ‘-‘I fl4*’S 44444 F—a—* F l&4 I — Weal U4j • .%43.taS. 544.44454 V’.n., — vl
•. d ¼t, ‘*‘d’ If,. &.fl4 .‘. C. 4*44 F.5..d44.”.’.*. all.,_,_
443 •—.—t.. w*L# •%‘ • I... (.s’.t, .,4 ,‘. w%443 I.’, • F, •rs- P4 4.%—4 fl• I ‘% Y’.4J 544. •wI4b* w .,‘4y 1St
LF’**t 1•t L44F.’ S’’4d44 £..fl.&..,fltA4......1
. _ b44 L’%. E4.n5, *1 _na — r.j 1J.d 5’%. t. ‘43St.I.44 —* aai btj O e’.l mi .,.....
-3 ‘“4l -* •34;4 d ,. - 33 .3 ‘4l.4 • P93 .•3•l I’444•4—. — — t4
‘A&’54. Ltrt._ ..‘t4tF w!4.4444’ 4fl’% lm4ut3• *4 ,__N’I i 4.4 b.4 ••p:h- ..—.beJ r-’Q’ ) ‘—tfr’.’t
.-,..4..4a...d,_qkSL,l ,,.e...b, j.’,—.tnt.an .!‘.4 C%n •4-,. jj4,53j.q5 ,j.3.4 “53’4 -l__f-_444.’
‘4 bS3l& ‘r-”, -4 4q#kA4.a5.4b •4 tI *4•lr&F4’444.4%3 4444t’ ?‘F P”Q4 .4 .4- 44-*Fa ‘—‘.444 t•,,j, ‘Aj,44 Lc..., 53 3441
p41 yfln4ntb w ,‘.44,3 •n4,pS.I 4.4433.4344 4ttT k ‘0t4I Ita.p9 Wa. rrn. —
- •‘ — flA — Lta.4. ‘mV.nd P5FF pfr1 .3 la he a, teat a.’. 4aS •.t — .an
- I‘_. 43.. n4 P. w’t,W —_ — a’. fll4. L....._4 !43flP5S1 ‘ii Nt4t a 1b4 — Fnj.p ,.•. P:. dq’a b%i
• — — ‘* VIA 5 In#..Q , — I.. 33 .M d4 — ,tn. * — ehlS 4C0 P 5’_ n3t,’sfl34 41. .3.4 3S’4-4.• laS P* I,. Pa b 1 L ,ta’, mt& . j43ceE —e *fl pa he A taf t4’4 fl—*
ID 4 dve m444t3P —444 4 ... --. —. —— .ea — 1.p d k4 14 1c3 h*a .. .rt.’, .‘.- V. —I ö, 4k 43,e — a -. .dr.”.’.J.fl y—a— a SI taSq —a a*j 1 *.d.,*a-p 5Wt. %S.I p —
41 •‘1-3,4,. .-4 r,.t t.A?’4j)-y* tb..iw. pa,fle, aP,%,pa.4tI ‘- ,1W11.. a_pt *w. *‘tI....t•,—J I tI A,,.r..A .I-’,w..n*.n* r’ISIq. ,-——hew.*w-4
- •l’ 33 _IO. I? - ,n• •t_•4 •M w•’.b%b ‘L — dj.—n —‘—4 443—— 4ón4n —
74 3-4 t’p.’•7-47-. — ‘.•- e_ J — hF “l. 43 II — — — .i— L. —
• — 4—’-E #‘. -• - 4 SI,fl• IttCfl S4 *t IV•04 1*44% — * 4—
• .1 —- -. I 5*431*4443 i.,. *4 -q— *44*
‘I,I .4S1, j.I...e.s ._ .. - .-a-y, ...j —— eçW4 ..P.l, .d a a4. wp4- —m %I -
ljIIfL t1j,g Ihj- FL S:ow 1in P5)1, flak i * Pase 7 vi 9
Valley Electric Association SLCAIP Application
Page 7 of 9
e. Ability to Use: Provide a brief explanation of the Applicant’s ability to receiveand use the requested resource as of October 1,2024.
VEA owns, operates and has access to transmission under various agreements. We willhave a need for them for years to come. Our load has increased by over 20% since 2010and is projected to grow by an average of 1.1 percent.
3. Provide a statement from the Applicant identifying the benefit to the state fromtheir receipt of the allocated resource. Applicants should demonstrate how receiptof the allocated resource would provide the “greatest possible benefit to thisstate.” If applicable, Applicant should also demonstrate how loss of an existingallocation could impact the Applicant to the detriment of the state.
The allocation of the requesled resources to Vahey Eledilic Association, Inc. (VEA) willachieve the greatest possible benefil Ia the state for the following reasons:
• This economical, reliable renewable power resource, if granted lo Valley ElectricAssociation, would take the place of less affordable and environmentally friendlyresources and goes further in serving consumers in need than anywhere else in Nevada.In fact, it would be difficult to imagine a better source for the allocation of resources thanVEA
• More than 90 percent of the consumers of VEA power reside In Nye County, whichis among the more economically depressed counties in the state.
• According to recent census data, the median income for a household in NyeCounty is $41,000 and the median family Income is $50,000. By comparison, the medianhousehold income statewide is $55,750, and the median family income Is approximately$64,500.
• Only two of Nevada’s 17 counties rank below Nye, and one of them {Esmeralda)also is in the VEA service territory.
• Nye County fares a little better, nationally, but not much. In the United States, themedian household Income is about $52,000, and family income is $63,000.
• As a result, energy expenses take up a far great• percentage of household incomeof residents of Nye County than households elsewhere in the state.
Page 1 of 3
• Affordable hydropower has contributed to more than a 20% increase in VEA’s loadsince 2010 and it will help drive a projected annual average load growth of 1.1 percentthrough 2034.
• The allocated hydropower resources will help VEA lo continue lo directly contributeto the economy of Nye County, which it has been doing by increasing employment bymore than 100% since the depths of the last recession.
• The additional hydropower will help VEA continue to invest in the technologicalinfrastructure needed for the 21st century such as bringing high speed fiber optic internetcommunication services lo rural Nevada homes, schools and businesses.
• It will also help VEA continue to make investments in Nevada’s future such aselectricity storage, electric vehicle charging stations and community solar generation.
• It will help VEA continue its Lighthouse Assistance Program, providing up to $200for low income senior members in having difficulty paying their electric bill.
• This resource also helps make the renewable energy we take from the CommunitySolar Project (15 MW photovoltaic generator located in Pahrump, NV) viable by shapingand firming it.
• Finally, it will also help VEA continue a decade long tradition of awarding hardworking students with currently in excess of $10,000 in academic, vocational, technical,and continuing education scholarships to assist members and their families as well ashelp continue VEA’s successful energy saving solar water heater” & irrigation efficiencypump, testing programs.
VEA is always searching for additional renewable power resources at affordable rates,not because it serves the interests of investors but because it directly benefits ourmembers, who are also our owners. If allocated to VEA, these resources will provide thegreatest possible benefit to Nevada by keeping more money, jobs and Investments forthe future in the stale economy.
The loss of our existing reliable, affordable and renewable SLCAIP hydropower allocationwould impact yEA’s ability to provide the aforementioned benefits (see above), to thedetriment of the state. If these resources are not allocated lo yEA, it will diminish ourability to maintain rate stability and keep more money, jobs and investments for the futurein the state economy. More explicitly:
• It will diminish our ability to provide reliable, affordable and environmentally friendlyelectricity to consumers in need in one of the most economically depressed areas ofNevada.
Page 2 of 3
It will diminish our ability to make further investments in the technologicalinfrastructure needed for the 21st century such as bringing high speed fiber optic internetcommunication services to rural Nevada homes, schools and businesses.
• II will diminish our ability to make further investments in Nevada’s future such aselectricity storage, electric vehicle charging stations and community solar generation.
• It will diminish our ability to maintain or increase our current employment levels.
• It will diminish our ability to provide assistance to low income membersexperiencing difficulty paying their electric bill as well as diminish our ability to provideenergy efficiency programs.
Provided by Staff for readability.
Page3of3
4. C:rcditwrthiI,es3:
ii. ‘like AppjanI Is puhhc Iv44proi4dcenbnnu and symbol:
It Provide the AppIicitt’s I)un aiid Bradstrec(D.U—N.S Number ilavaibble: — —
- -
c. I’re’idt (he AppIicanis most recent P!A
___-
d. Attach chart %lIow irig all cqui(% intcrest%, litciuditig corporate structure of (tic pined andstslnidbr, otgtnh,atiuil. II applicable.
e. If A ppltca iii has a p rent etloipairt. proi ide the rcque%(ed inform strati In items O) thoaghIc) lot the paren I company, aitil attach a signed sI a Lenient In (he pareri ( coinpans that (herient conipaa i “Wing (n preside a larenlaI uarlbntec if rLqiIircd.
f. U applicible. does the Applicaial has e indr1,crtdcnt late ‘eItin authority to raise itsccstiintvrs rates to co%Qrnptnses? Please t’iani. ——
iv.; CijvLw.JLDroc1onNnhoasthorybnncA!e - -
_______
g. II applicalile. dc,c (he Applicant has e the tasitig :1 U tlwrLt\ (I) cci er spensn? Pleaseesplain.
U. II apphicubic, ple.nc slnic Ike numher of I:ulc ,itnienIs to (he (kCN in tht’ past three
sears, the date of the insolec that ssa not timel r and the nctuil date of payment.Plvase ci lain the_circumstances for each late paejL_
.J3.D,nrtr.t’,r.
I. l’riii ide complete copies of (lie Applicaht’s Audited Firtitticial Slatcnicnt% for the pastthree_sens,
________________
frteiuo woof’e*,t4sJ io4 ic VF.s 201S 27.sj4.i coi4W. flarcIaJitatofl.3t,
5. Other Information:
The AjipIicanInla3 pnnidesns .Jthcrillfarrnntionpcriinenflotheapvhcation.Again. VEA Is alvtas toarchtng (or nckjilor,al rono’.ablo powor roouces at vate.nol bocauso (I sorves the Interests at invejtors but because it &reclty bunetits our mumbers,who are also our own&s. H allocated to yEA, these resources will he’p us maintain our rates,enhancing our abilrty 10 provkie the groalost pcsstb[e benorit to Nesa by keeping rn&emoney, lobs arid InvosimeriLs for the future In the stale economy.
Ths resource also hoipt ts firm and shape the renowi,be 600F9j w take front (he 15MWCornmun.Iy Solar Proec1 photovoltaic çjenoralor locatod in Pahn,ni, NV and also enhances owribihty to otter assistance to our low ncomo niernbers
yEA is a tongtirne CRC customor or his resource Our loads have been greving and tha[sexpected lo conbnua We owed to havt a need for rho roquesled resources well into the
I future (whether or not energy choice is Implemented) Indeed, yEA was able to utility 1OO nlAMPACa tayoW hydropower and transa,ission altocalions made availthio on a ternpcary
term from Oclobei 1,2016 — September 30. 2017 - .
—
1.. ii. 5.IEW1’r.i. I’t!. Jul1 (t3ui.%
6. Lii $iflifl2 this apphcationjkc Appjjcnot acknowkdpes that if the Applicant nceepts ppallocat&resource from the CRCN V. the Applicant will be subicci to the folIcsjg:
I 11w Applicant will cxcculc a (‘uciliact with ;hc URUNV in Ihe hill of 24)18 for poswr
deliveries Lwginninz on (kInk-i I, 2021
ii. The Applicani must cnir lint’ a new coN kiet. prior k’ June I, 2(12 I, u itli the CRC V totake and a) br iraiismisioii sei i.e from J’irinac hi.’ Peak on the Sh (‘All’ 1 ran’mI’.sions% sleni Lu one •‘i univ of Ihc A1LIIlicrI1 Nc adt dcli civ points on 11w Parker—h )nk1 ranMn ISStLW s sWili ; Inch t-urrentl; include Aniarosa Stibstal cii, fl;iL Suhlai on.Iiottldei (11) lap. C Isk lie. anti Sic_id Substation.
jj. An ApphicanL iii hiintg otintillIjo il (ii hackup liaitsniission service over 11w R,tkcr-1)a I’.Ptnject Southern Neida Facilitics. or an Apphcani dircctl jiiterconnccied Iii the Parkctl)avis I’nei Southern Nevadii Facilities, lutist h.we n eisIinz cooliact with 11w (‘ItCNVor enter into a iiew contract with the (1{(NV In tike and pa lot set-vice o ci those f’aciliiiespti cit to June I 2023 for nt ci deIi cues bcgiiiiii iig on I vioher I, 2024
7. Signature:-
I lie Colorado Rn ci ( iiiuini’.’ ion of Net ada requires die iguattlrr $ikl title ut art appcopriatc ,iflic iat whocan anest to the ‘ Mid Iv at’ the applicat on and v. Ito is authori ed to suhni ii the request for an aikkation.
B> signing behow , I crti1 the inloiniation which I have pan tied s 1ru and cuirect to 11w best ut nniii liii nail tin, k Tifiw ie4w an jsc lid
Chief Operating OfficerSign.iwre 1 tile
_______
—
__________
—
mon AbuegPrint Namer’
__________
Appllctitioos P1*3 Ie ddrertsed lo hit FXCCLI(li c’ l)ircctor anti submilted:
• 1I tiii iii) add rc-ctl In: CN’ponvr’il crc. ii
• lh fax I’i (702) 486-2695; or
• 1k per%cual delis cry or U.S. Mall to the (‘IWNV’s office, 555 F. Washington
Mcaue, Suite 31ft0. I s Vcgas. NV 8IGl.
Appticalions turn N submitted belneen Junc 25, 2018 antI Silly 16, 2018,
MONDAY. .ILJIN 16, 2018
.4,wIJIdlktn i&i’. IJj :flp.m. Phi. fit?; 16, 29)6 i’age9cil9
Valley Electric Association, Inc.A Touchstone Energy Coopentive
August 30, 2018
Ms. Jayne Haricins, P.E.Executive DirectorColorado River Commission of Nevada555 E. Washington Avenue, Suite 3100Las Vegas, NV 89101
VIA EMAIL: crcpowercrc.nv.pov
Subject: Allocation of SLCAIP Hydropower Post 2024
Dear Ms. Harkins:
Thank you for the opportunity to submit comments on the Colorado River Commission ofNevada’s (“CRC”) draft Commission Order proposing allocations of hydropower from the SaltLake City Area Integrated Projects (SLCAIP) for the period of October 1, 2024 throughSeptember 30, 2057.
In accordance with the criteria applied and analyses performed by Staff, Valley ElectricAssociation (VEA) agrees the requirements for allocation have been appropriately applied. Inaddition, VEA supports the Draft Order’s findings of facts and recommendations. VEA furtheragrees that the proposed allocation provides the greatest possible benefit for the state.
VEA appreciates the opportunity to comment on this matter.
Respectfully Submitted,
Sal’;;
Chief Executive Officer
cc: File
800 E Highway 372 • PD Box 237 • Pahrvrnp, NV 8904 1-0237Phone:(775)727-5312 or (800) 742-3330 (In Nevada) • Fax: (775) 727-6320 • www.vea.coop
LAS VEGASCITY COUNCIL
CAROLYN G. GOODMANMayor
LOIS TARKANIANMayor Pro Tern
STAVROS S. ANTHONY
BOB COFFIN
STEVEN G. SEROKA
MICHELE FIORE
CEDRIC CREAk
SCOTT D. ADAMSCity Manager
DEPARTMENT OF PLANNING
ROBERT SUMMERFIELDDIRECTOR
DEVELOPMENTSERVICES CENTER
DEPARTMENT OF PLANNING
333 N. RANCHO DRIVE3RD FLOOR
LAS VEGAS, NV 89106
702.229.6301 I VOICE702.474.7463 FAX
711 I1TI’
OO©Ocityoflasvegas
Ia svegas nevada .gov
Marco VelottaSr Management AnalystCity of Las Vegas Long Range PlanningOffice of Sustainability333 Rancho Dr.Las Vegas, NV 89106
December 6, 2018
RE: Intent to Withdraw SLCAIP Application
Dear Ms. Bates:
Thanks to you and your team for the assistance navigating the Salt Lake CityArea Integrated Projects (SLCAIP) hydropower application process, which theCity applied for in July, 2018. Although the Draft Order for an allocation of theSLCAIP hydropower to the City was not approved by the Commission, theCity has decided to to withdraw our application from consideration withoutprejudice. After considering some of the economics and wastewater treatmentload factors over the past few weeks, we believe that the circumstances havechanged enough for the City to discontinue the process. We look forward tocontinue working with you and the Commission on our existing hydropowercontracts.
If you have any questions, please do not hesitate to contact us.
Sincerely,
I-
Marco N. Velotta, AICPSenior Management AnalystmvelottaLasVegasNevada.GOV702-229-4173
CC: Tom Perrigo - Executive Director of Community Development, City of LasVegasCharles Trushel - Sr Management Analyst, City of Las VegasEric Witkoski - Interim Executive Director, CRC
From: MEUSA GARDATo: CRC Power
Cc: Mendis Cooper; Terry RomeroSubject: SLCAIP Allocation Comments
Date: Tuesday, January 29, 2019 9:29:08 AM
Please find the below comments for the Draft Order for Allocation of powerfor SLCAIP Hydropower 2024:
The valuable resource provided in this SLCAIP allotment will help Overton PowerDistrict No. 5 to continue providing quality and affordable power to all customers inour service territory. We would like to thank the Commissioners and Staff of theColorado River Commission for their work and thorough review in the allocationprocess for the SLCAIP allotment and consideration of our comments.
MeLisa GarciaAccounting SupervisorOverton Power District No. 5(702) 397-3034
2/6/2019
1
Colorado River Commission of Nevada (CRCNV)
Salt Lake City Area Integrated Project (SLCAIP) Post-2024 Allocation Hearing
February 12, 2019
SLCAIP Information
• Initial hydroelectric generation began in 1963.
• SLCAIP is comprised of two Utah Dams, three Colorado dams and one Wyoming dam, and 5 additional power plants.
• Total of 11 powerplants with a combined installed capacity of 1,816 MW.– Installed Capacity at Hoover is 2,074 MW
• CRC’s federal allocation is approximately 1.5% of the total capacity.
2
2/6/2019
2
SLCAIP Allocations
3
CRCNV Current Allocations of SLCAIP Hydropower
Winter Summer Annual
Contractor Capacity (kW) Capacity (kW) Energy (kWh)
City of Boulder City 7,279 5,537 23,422,458
Overton Power District No. 5 8,256 6,279 26,565,338
Valley Electric Assoc. 11,879 9,035 38,223,823
CRCNV Total 27,414 kW 20,851 kW 88,211,619 kWh
Updated 12/08/2017
Federal Contract Process
• Federal contract issued to CRCNV on March 9, 2018.
• About half of the Federal Contractors have already signed their post-2024 contract. – The CRC has not signed pending the
completion of the current SLCAIP customer allocation process.
4
2/6/2019
3
CRC Allocation Process
• April, 2018: Staff issued a Notice of Public Meeting and Request for Comments on the draft Notice and Invitation to Apply, draft allocation criteria, and draft application.
• May 15, 2018: Public Meeting
• June 12, 2018: Commission approved the draft Notice and Invitation to Apply, allocation criteria, and application.
5
CRC Allocation Process
• June 14, 218: Staff issued the Notice, allocation criteria, and application
• July 16, 2018: Staff received four applications.
• Staff received three applications from existing SLCAIP Contractors:
– City of Boulder City
– Overton Power District No. 5
– Valley Electric Association
• Staff also received an application from the City of Las Vegas
6
2/6/2019
4
Staff Recommendations
• At a hearing held on September 11, 2018, staff recommended that the current contractor allocations be reduced by approximately 7% to create a resource pool for the City of Las Vegas.
• The Commission did not reach a decision on the allocation and requested additional information addressing the impact on current contractors if their allocations were reduced.
7
Further Actions
• Staff reached out to all four applicants and issued data requests to confirm the cost impact on existing contractors of receiving a reduced allocation and the benefit to the City of Las Vegas of receiving a new allocation.
• Staff received a letter on December 6, 2018 from the City of Las Vegas withdrawing their request for an allocation “after considering some of the economics and wastewater treatment load factors.”
8
2/6/2019
5
Revised Staff Recommendation
• Staff recommends maintaining the existing allocations of the three remaining SLCAIP contractors.
9
Draft Order
• Staff submitted the Draft Order to the Applicants for review on January 22, 2019 and received one comment from Overton Power District No. 5.
10