Storage of Spent Nuclear Fuel at Pilgrim Nuclear Power Station
V. C. Summer Nuclear Station Units 2 & 3 COLA (Final Safety ...
Transcript of V. C. Summer Nuclear Station Units 2 & 3 COLA (Final Safety ...
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-125
Figure 2.4-201. Topography of the Site of Units 2 and 3 and Vicinity
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-126
Figure 2.4-202. Map Showing Major Hydrologic Features at Plant Site
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-127
Figure 2.4-203. General Plant Site Layout
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-128
Figure 2.4-204. Broad River Watershed at Richtex
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-129
Figure 2.4-205. Monticello Reservoir Area and Storage Capacity Curves (Elevations Relative to NGVD29)
250
300
350
400
0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000
Storage, acre-feet
Elev
atio
n, ft
01,0002,0003,0004,0005,0006,0007,000
Area, acres
Storage Area
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-130
Figure 2.4-206. Parr Reservoir Area and Storage Capacity Curves (Elevations Relative to NGVD29)
250
255
260
265
270
0 10,000 20,000 30,000 40,000 50,000
Storage, acre-feet
Elev
atio
n, ft
01,0002,0003,0004,0005,0006,000
Area, acres
Storage Area
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-131
Figure 2.4-207. Location of Dams in the Broad River Watershed Upstream of the Richtex Station seeTable 2.4-204 for Dam Data)
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-132
Figure 2.4-208. Locations of Existing and Proposed Reservoirs between Parr Shoals and Clinchfield Dams on Broad River
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-133
Figure 2.4-209. Downstream Water Users
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-134
Figure 2.4-210. Plant Site Drainage Basins and Flow Paths
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-135
Figure 2.4-211. Comparison of 1940 UH and HEC-1 Optimized UH Based on 1990 Storm Event
Figure 2.4-212. Comparison of Measured vs. Estimated Flood Hydrograph for 1976 Storm Event
0
10000
20000
30000
40000
50000
60000
70000
0 6 12 18 24 30 36 42 48 54 60 66 72 78 84 90 96 102 108
Time (Hours)
6-h
ou
rly F
low
(cf
s)
UH (based on 1940 storm, UFSAR)
UH (based on 1990 storm, HEC-1)
0
20000
40000
60000
80000
100000
120000
140000
160000
10/06/76 10/07/76 10/08/76 10/09/76 10/10/76 10/11/76 10/12/76 10/13/76 10/14/76 10/15/76
Dail
y F
low
(cf
s)
Measured Hydrograph at Richtex
Estimated Hydrograph at Richtex(based on 1940-UH)
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-136
Figure 2.4-213. Comparison of Measured vs. Estimated Flood Hydrograph for 1990 Storm Event
0
20000
40000
60000
80000
100000
120000
140000
10/10/90 10/11/90 10/12/90 10/13/90 10/14/90 10/15/90 10/16/90 10/17/90 10/18/90 10/19/90 10/20/90
6-h
ou
rly F
low
(cf
s)
Measured Hydrograph at Alston(adjusted to drainage area atRichtex)
Estimated Hydrograph at Richtex(based on 1940-UH)
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-137
Figure 2.4-214. PMP Rainfall Hyetograph and the PMF Hydrograph for the Broad River Watershed at Richtex
0
2
4
6
8
10
0 30 60 90 120 150 180 210 240 270 300
Time, hoursR
ain
fall, in
ches
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
0 30 60 90 120 150 180 210 240 270 300 330
Time, hours
Flo
w, cf
s
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-138
Figure 2.4-215. Wind Fetch Analysis for Monticello Reservoir
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-139
Figure 2.4-216. Elevation Storage Curves Hypothetical Reservoir at Parr Shoals Dam (Elevations Relative to NGVD29)
250
270
290
310
330
350
370
390
410
430
0 1000 2000 3000 4000 5000 6000
Storage, 1000 acre-feet
Ele
vati
on
, ft
010,00020,00030,00040,00050,00060,00070,00080,00090,000100,000
Area, acres
Storage: main river + branches
Storage: main river only
Area: main river + branches
Area: main river only250
270
290
310
330
350
370
390
410
430
0 1000 2000 3000 4000 5000 6000
Storage, 1000 acre-feet
Ele
vati
on
, ft
010,00020,00030,00040,00050,00060,00070,00080,00090,000100,000
Area, acres
Storage: main river + branches
Storage: main river only
Area: main river + branches
Area: main river only
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-140
Figure 2.4-217. Fetch Length for Hypothetical Reservoir at Parr Shoals Dam
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-141
Figure 2.4-218. Topography of Part of the Broad River Watershed Upstream of Parr Shoals Dam (Reference 230)
V. C. Summer Nuclear Station, Units 2 and 3COL Application
Part 2, FSAR
Revision 42.4-142
Figure 2.4-219. Map of South Carolina from 1838 (Reference 205)