UWI West Stand 3D FF
1
Cold Water Hot Water Sanitary Condensate Drain Vent Pipe GENERAL NOTES Scale Project number Date Drawn by Checked by LEGEND Grafton Cot #2 , Holetown St.James DESIGN ENGINEERS. Consultant LTD UWI ATHLETICS & FOOTBALL STADIUM. WEST STANDS Cave Hill Campus St. Michael 1/8" = 1'-0" 06/17/2014 3:19:46 PM A104 PLUMBING 3D FIRST FLOOR 01 06/13/14 DH DH No. Description Date 1/8" = 1' 0" 1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.
-
Upload
damian-harper -
Category
Documents
-
view
68 -
download
0
Transcript of UWI West Stand 3D FF
Cold WaterHot WaterSanitaryCondensate DrainVent Pipe
GENERAL NOTES
Scale
Project number
Date
Drawn by
Checked by
LEGEND
Grafton Cot #2 , Holetown St.James
DESIGN ENGINEERS.Consultant LTD
UWI ATHLETICS &FOOTBALL STADIUM.WEST STANDSCave Hill Campus St.Michael
1/8" = 1'-0"
06/1
7/20
14 3
:19:
46 P
M
A104
PLUMBING 3D FIRSTFLOOR
0106/13/14
DHDH
No. Description Date
1/8" = 1' 0"
1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.