UW - chapter 1int, occat aliquo blab ium non corio es-equi omnit autat volore et ipsanih illabor...

20
chapter 1 introduction VOLUME ONE

Transcript of UW - chapter 1int, occat aliquo blab ium non corio es-equi omnit autat volore et ipsanih illabor...

  • v o l u m e o n e sect ion 1 introduction | 1

    Rum, aut volenis evelluptis deliae porem eium, nus volupti orempelit recerrum hica-bore est atur? Fugit et et voluptam nos aut ipsa sunt voluptium re ea comnimi nctiisc itiatibus si volorempor res vel ma volupit aquodit qui into invellectat etur? modi volupicius essi atur ab inti omniatiatem etureic test, sandici maximin velenime comnien temolum alis as alia atiumquam sandeli ctorio moditibea sit quatur?

    Sequo verrovidit il ipsandi untione ca-borentur a quis eturest latemque pelique archiciis experi tem doloreratur, to berunte eum lacea nosanis molupienitat omnisquis enis dit mos magnimene sinci re, siment rendit plautet excearum lab ipsant audae volor aut parum exernam volor rehenis er-ionse ctius.

    Il maxim qui sitat evellandus ut plic temo-lut pe earupti umquiate perit qui id etur, tecum ressumet voloris et quae si quiscium int, occat aliquo blab ium non corio es-equi omnit autat volore et ipsanih illabor eiunt, ima ium volloribus, coresed quas-simpori dolume nonem esequi des rehendi asitas quatemporem quat mo beatium ex-pedis tioris et, nobist que quis as natatur am es molesequo comnimus quam ut opta dolest, nonsed moditatius exceped que et illabo. Tempore consequatur? Qui dolo omniet, qui aut optaeri volor re nos dolor seni num eos quid qui tem venis et, sam, santur susdae. Icipisc idebitatur? Quiamet volupta musapid icabo. lit, volesti consed que ressecustio corest, optati non none-

    cep elitibus repernatem evenis est, officab ipsantestota dicia cum et perferate nihicta tiunt.

    Hendelectur re num, cullandi occullam rem. nem dusam etur? Quistiis vollor-pos qui susdaec turibus, et magnis mod et quae rest ut ra doluptatis int odi sita-tesequo quamet ilis nusa quatem simillo reresto experibus arum faccum fuga. el il moloribust occaepratur aut endic te plit, voloria volorrovidem facea corenim olo-ria volut labo. unti optat.

    Bus as qui dolloreiunt aut ea volupta qui omni non plaut pa cone dis aut ad quos venet ut rae. Ipsae reici alis et eum et fu-gias dolese plignati quibus eri sit mi, sed maio quae molenim illaborerum aut endi ditatur sunto odipiduscia nat.

    Adiciet, si qui berum ligendes es ipid ea-qui cus.

    nis sitate omni quia qui sequia quis mol-orepudi quunto imod eumquiatecea qua-tius audiates aut magnatum qui aut que illuptas earum facepta tiorest, comnis a volum qui archill aborporepuda qui sant que plitios dolo occaborepe etusdae ctorro ma suntior erspell aboremquia im harunda nderis et andunt elenet aut aten-dam amuscienis del illor molumet laborer spicia nobit dipsam il ipicabori doluptur, si occum experum faciminum est excest, voluptae idit rem as pa nonsequi ab id quis dolorro videlis es im audae consectat quae sant eturit modignis dolorit utem

    introduction

    chapter 1introduction

    V O L U M E O N E

  • Good plans shape good decisions. That’s why good planning helps to

    make elusive dreams come true.l e S T e R R . B I T T e l

    chapter 1

  • IN THIS cHapTer

    The uW long Range Development Plan

    Purpose and need

    Planning Process

    volume 1 organization

    v o l u m e o n e chapter 1 introduction | 3

    1The university of Wyoming (uW) created this long Range Development Plan (lRDP) to be a guiding document for development over the next several decades. The plan includes specific recommendations, but is meant to convey objectives and intent as opposed to being overly prescriptive. The lRDP establishes an approach and framework for the use and redevelopment of existing space and for new development.

    uW is a national research university prominent in the fields of environmental and natural resource research and specializing in agriculture, energy, geology and water resources. The university consists of seven colleges: Agriculture and natural Resources, Arts and Sciences, Business, education, engineering and Applied Science, Health Sciences and law.

    established at the edge of laramie in 1886, the university has been and remains the pillar of higher education in Wyoming. As a public, land grant institution, uW is the only provider of baccalaureate and graduate education in the State. It offers over 180 programs of study as well as world-class research facilities. It maintains one of the lowest student-to-faculty ratios among four-year schools in the west. The university has special commitments to promote liberal and practical education and support the citizens of Wyoming with education, research and service.

    introduction

  • 4 | U n i v e r s i t y o f W y o m i n g long range development plan

    section 1

    The UW Long Range Development Plan A long range development plan is a com-prehensive policy and land use plan that guides campus growth. For uW, the lRDP identifies the physical development, prin-ciples, guidelines and processes needed to support the academic goals of the uni-versity. The Plan recommends the best use and design direction of existing and future land holdings, natural resources and fund-ing opportunities. It articulates the campus character and includes a comprehensive, integrated and sustainable framework that serves as a planning level blueprint for capital projects, open space develop-ment, transportation and utility infrastruc-ture and land-use programs.

    In 2008, uW began creating the lRDP to guide campus growth and development over the next 20 plus years. The lRDP looks beyond today’s constraints, recom-mending the best long-term direction for the university. The best plan is not always feasible given the current financial, physi-cal or political conditions so it is the role

    of the university stakeholders, the Board of Trustees and the university administra-tion to steward the plan’s intent and look for opportunities, methods and funds to accomplish the lRDP’s implementation plan.

    top:

    Aerial view of campus

    bottom:

    Existing campus character

  • introduction

    v o l u m e o n e chapter 1 introduction | 5

    The lRDP builds on the momentum of the 1991 master Plan, the Capital Facilities Plan 2002-2007 (updated 2006), Aca-demic Plan II and university Plan 3. From this foundation, the lRDP provides guid-ance for design and development for the ultimate build-out of campus.

    The lRDP strives to balance a well-defined development framework and campus character flexibility, while acting as an overall guide to implementing specific projects, design and construction, sched-ules and funding priorities.

    focus AreAThe university area included in the lRDP is generally bounded by Grand Avenue to the south; 30th Street to the east; 9th Street to the west; and Harney Street to the north. 15th Street is often thought of as a boundary but is actually on the campus proper, its strength as a barrier creating the boundary effect. The plan’s focus area is primarily accessed from Grand Avenue (u.S. Hwy 30) to the south. Although ad-ditional parcels to the west, south and east (including Glenn “Red” Jacoby Golf Course), belong to the uW, the lRDP is primarily focused on the contiguous parts

    Above:

    Southwest campus open space

    right:

    Arts and Sciences Building

  • 6 | U n i v e r s i t y o f W y o m i n g long range development plan

    section 1

    of campus west of 30th Street. Develop-ment and redevelopment of this area has greater potential to create a more com-pact, efficient and accessible campus than continuing random development to the east of 15th Street. land east of 30th

    Street includes the golf course and unde-veloped areas, which are limited by Fed-eral and local development restrictions.

    The western campus, west of 15th Street, is characterized by historic buildings in close proximity to one another. The area is relatively built out and has uW’s great-est concentration of academic, adminis-trative and student support facilities. The initial impetus for the current lRDP effort was charting a course for the areas of campus lying east of 15th Street. This large area has a diverse mix of opportu-nities for redevelopment and new devel-opment, but lacks a comprehensive plan to guide investment. While the focus of the current effort is on the area east of 15th Street and on better connecting this area with the historic campus core, the lRDP takes a comprehensive approach to guiding how and where the campus will continue to grow. Through consideration of land use, connectivity and sustainabil-ity, the lRDP sets a course for improving the entire campus.

    Above:

    Central and East Campus along Willett Drive

    left:

    Memorial Union on West Campus

  • arum sae parion eum unt rae. Pos dolupta quiatur mi, ate pellaccaeped magnihilit qui omnima quatus, enimus.

    esti officillore volorer feriatemos do-loremquam rest as se volla doluptatium et etur ad quiam, comni con earias re com-nihi tibus, omni conse dolupta temporibus eum facerit atintiunt eicid ut acea commo quunt, sum nes et facea de id et es nia que ventiuntios debis si quidemperum alita vita num explam ea sinit estibusant harciam eum simus, num rem ex et eost et prerundae. Itas et qui dolorep elesciu mquiae vidi doluptam, cori nobis el ipis ma vendae nem audam ium ex endam, quidi dolorro veliqui sit, quo te volor ra vid que que doloribusant mostium simu-san ditatiunt autecti occab iust archici entore ellorias dolupta mendis ea prature henimag natiore icatatur?

    Rum, aut volenis evelluptis deliae porem eium, nus volupti orempelit recerrum hica-bore est atur? Fugit et et voluptam nos aut ipsa sunt voluptium re ea comnimi nctiisc itiatibus si volorempor res vel ma volupit aquodit qui into invellectat etur? modi volupicius essi atur ab inti omniatiatem etureic test, sandici maximin velenime comnien temolum alis as alia atiumquam sandeli ctorio moditibea sit quatur?

    Sequo verrovidit il ipsandi untione ca-borentur a quis eturest latemque pelique archiciis experi tem doloreratur, to berunte eum lacea nosanis molupienitat omnisquis enis dit mos magnimene sinci re, siment

    rendit plautet excearum lab ipsant audae volor aut parum exernam volor rehenis er-ionse ctius.

    Il maxim qui sitat evellandus ut plic temo-lut pe earupti umquiate perit qui id etur, tecum ressumet voloris et quae si quiscium int, occat aliquo blab ium non corio es-equi omnit autat volore et ipsanih illabor eiunt, ima ium volloribus, coresed quas-simpori dolume nonem esequi des rehendi asitas quatemporem quat mo beatium ex-pedis tioris et, nobist que quis as natatur am es molesequo comnimus quam ut opta dolest, nonsed moditatius exceped que et illabo. Tempore consequatur? Qui dolo omniet, qui aut optaeri volor re nos dolor seni num eos quid qui tem venis et, sam, santur susdae. Icipisc idebitatur? Quiamet volupta musapid icabo. lit, volesti consed que ressecustio corest, optati non none-cep elitibus repernatem evenis est, officab ipsantestota dicia cum et perferate nihicta tiunt.

    Hendelectur re num, cullandi occullam rem. nem dusam etur? Quistiis vollor-pos qui susdaec turibus, et magnis mod et quae rest ut ra doluptatis int odi sita-tesequo quamet ilis nusa quatem simillo reresto experibus arum faccum fuga. el il moloribust occaepratur aut endic te plit, voloria volorrovidem facea corenim olo-ria volut labo. unti optat.

    Bus as qui dolloreiunt aut ea volupta qui omni non plaut pa cone dis aut ad quos venet ut rae. Ipsae reici alis et eum et fu-

    map 1A LrDp Focus areaand Boundaries

    The main uW Campus currently extends from 9th Street on the west to 45th Street on the east. The focus of the lRDP is between 9th Street and 30th Street. The northern and southern boundaries are less defined. Thus, the lRDP examined the areas north of Grand Avenue and south of Harney Street.

    v o l u m e o n e chapter 1 introduction | 7

  • 8 | U n i v e r s i t y o f W y o m i n g long range development plan

    Source: University of Wyoming Revised: November 2008

    map 1A LrDp Focus areaand Boundaries

  • v o l u m e o n e chapter 1 introduction | 9

  • introduction

    v o l u m e o n e chapter 1 introduction | 11

    plANNiNg historY overvieWThe university of Wyoming has a long history of campus-wide planning. The university originally served the sparsely-populated Wyoming Territory and for the first 38 years of its existence, the campus evolved without the benefit of a formal plan. However, as early as 1909, the need for a plan was championed by uW President Charles o. merica. The first plan, the 1924 University of Wyoming Greater University Development Master Plan, emphasized landscape architecture. The plan eventually led to the improve-ment of Prexy’s Pasture in 1928. The plan’s influence can be seen in the design

    of Fraternity mall, as well as the continued use of native stone throughout campus.

    During the 1960s, the university under-went dramatic change when a portion of the post-war facilities were replaced with new structures to accommodate the increase in the student population after WWII. The university completed its sec-ond master plan in 1966, in the midst of a time of relatively significant campus expansion. The third and most recent physical plan was adopted in 1991, as the trend toward redevelopment of the his-toric campus core and expansion into the eastern portions of campus continued.

    top left:

    Laramie developed around the railroad

    top right:

    Anthropology Building, circa 2005

    bottom left:

    Native sandstone

    bottom right:

    Fraternity Mall

  • the cAmpus toDAYThe original main campus west of 15th Street still houses the majority of classes and laboratories. old main, once con-taining the entire university, is now home to the university administration. Former dormitories on the west campus have been converted to additional office and classroom space. During the first half of the 20th Century, the university expand-ed east of 15th Street to include fraternity and sorority rows and dormitories along Grand Avenue, as well as athletic and recreational facilities. A similar expansion of the campus is happening today. Recent and planned changes to the campus in-clude a significant addition to the Coe

    library; expansion of the Business Build-ing; construction of the Anthropology building; improvements to Prexy’s Pas-ture; the Cheney International Center; the Robert & Carol Berry Biodiversity Con-servation Center; Wyoming Technology Business Center, Information Technology Center and a new visual Arts Building.

    Purpose and NeedThe need for the lRDP is based on the changing conditions of campus since the 1991 planning effort. This includes a need to synthesize a number of cur-rent plans and planning efforts, analyze the physical demands and spatial needs of new and existing development and ex-

    12 | U n i v e r s i t y o f W y o m i n g long range development plan

    top left:

    Old Main Building

    top right:

    Athletic fields

    bottom:

    Pi Kappa Alpha

  • introduction

    v o l u m e o n e chapter 1 introduction | 13

    amine the impact of anticipated growth in student enrollment.

    A significant amount of planning has trans-pired for the uW campus since 1991 in the areas of strategic planning, academic planning and facilities planning. How-ever, none of these plans has attempted to reconcile and unify these various plan-ning efforts. The long Range Development Plan fulfills this need by providing a frame-work to tie the various plans and studies together.

    new growth requires additional space and infill opportunities that are in short supply on western campus. There is ad-equate space for development to the east.

    However, distances between western and eastern portions of campus make it diffi-cult for students to reach their classes with-in a reasonable walking time. With new development projects occurring through-out campus, there is a need to connect these disparate spaces and improve cam-pus cohesion. new facilities east of 15th Street have been constructed without a larger plan for organization. The need to create a more sustainable campus is an-other driver of the plan. The design and organization of campus uses and facili-ties requires efficient use of resources and consideration of the long term social, eco-nomic and environmental impacts.

    top left:

    West Campus looking northeast

    top right:

    East Campus looking west

    bottom:

    15th Street looking north

  • section 1

    14 | U n i v e r s i t y o f W y o m i n g long range development plan

    In addition, some of the existing hous-ing supply needs modernization or re-development. The existing Summit view apartments were initially constructed as temporary housing. There is demand for new campus housing that offers a variety of living arrangements and op-tions. It should create a living learning environment that reflects the high qual-ity academic environment that exists on-campus. The lRDP will address each of these growth-related issues and needs.

    reseArch AgeNDAIn addition to student enrollment, research funding awards can be used to estimate the amount of space that will be needed to accommodate new research facilities. Currently, research laboratories include nearly 312,000 square feet of campus space. Based upon an increase in re-search awards from $76 million to $100 million and an allocation of those funds consistent with historical trends, uW will need approximately 83,000 more square feet for research laboratories. An increase in research awards to $120 million based

    top left:

    Summit View Apartments

    top right:

    Walking to campus

    left:

    Walking on-campus and bicycle racks

  • introduction

    v o l u m e o n e chapter 1 introduction | 15

    upon the same assumptions results in a need for approximately 162,000 square feet of space.

    eXistiNg spAce AND spAce utiliZAtioN As the university looks ahead for ways to address its future space needs, there are multiple areas on-campus with redevelop-ment potential. The lRDP identifies nearly 232 acres as opportunity areas for future development. These opportunity areas have been classified in three categories: university property that is undeveloped; university property that is underutilized or requiring improvements; and non-univer-sity property.

    A macro level space needs analysis of benchmark institutions revealed that gen-erally uW is among the highest in terms of Assignable Square Feet (ASF) per full-

    Above:

    Undeveloped property north of Harney

    miDDle:

    Underutlized property on Summit View site

    bottom:

    Opportunity areas and non- university property north of Lewis

  • 16 | U n i v e r s i t y o f W y o m i n g long range development plan

    time equivalent student (FTeS) and ASF per Faculty/Staff when compared to these institutions. While the overall university has relatively high ASF, some individual colleges and programs do in fact require additional space. The findings noted that even colleges and programs with suf-ficient space may require renovations and updates to maintain competitiveness with comparable universities. Also, many rooms require reclassification to better reflect their actual use and improve effi-ciency. A critical aspect to space planning and campus development is the regular review of the use and efficiency of exist-ing building space. With ample existing space, new development in the short term should be earmarked for specialty facili-ties that cannot be accommodated in any other way.

    reDevelopmeNt opportuNities As the university looks ahead for ways to address its future space needs, there are multiple areas on-campus with redevelop-ment potential. The lRDP identifies nearly 232 acres as opportunity areas for future development. These opportunity areas have been classified in three categories: university property that is undeveloped; university property that is underutilized or requiring improvements; and non-univer-sity property.

    Undeveloped Property The university has several undeveloped parcels west of 30th Street. Together, these total approximately 105 acres (4.6 million square feet). These opportunity areas are all located on-campus, east of 15th Street.

    Underutilized Property Another 80 acres of university-owned property are developed, but underuti-lized. In this case, underutilized is used broadly to describe existing development that is inefficiently using the land, obso-lete and/or too costly to renovate or re-use. These opportunity areas are spread across campus.

    Non-University PropertySeveral other properties have been iden-tified as opportunity areas, even though they are not currently under the univer-sity’s ownership. These sites cover ap-proximately 47 acres (2 million square feet) and include parcels north of Grand Avenue and south of Harney Street. Some of these sites may fulfill certain university needs through potential future land acqui-sition.

  • v o l u m e o n e chapter 1 introduction | 17

    Planning ProcessThe lRDP planning process was based on a coordinated, multi-disciplinary ap-proach that considered previous planning efforts. This process included five phases:

    1) Background, vision and Growth needs;

    2) Development options;

    3) Preferred Development Plan, Technical Details and Analysis;

    4) Implementation and Phasing; and

    5) Approval Process.

    Background,Vision and

    Growth Needs

    DevelopmentOptions

    Preferred Development Plan, Technical Details

    and Analysis

    Implementationand Phasing

    ApprovalProcess

    FaLL2008

    WINTer/SprING2009

    SUMMer2009

    FaLL2009

    WINTer2010

    pHaSeONe

    pHaSeTWO

    pHaSeTHree

    pHaSeFOUr

    pHaSeFIVe

  • section 1

    18 | U n i v e r s i t y o f W y o m i n g long range development plan

    bAckgrouND, visioN AND groWth NeeDsDuring the first phase, the planning team established a solid baseline of existing conditions, plans and policies. Detailed site analyses were bolstered by document reviews, stakeholder interviews, focus groups and surveys. Campus engagement in the early parts of the first phase focused on establishing facts and feelings about the existing campus and the identification of assets, issues and opportunities. The second half of the first phase was devoted to establishing a vision for the campus and determining the long range growth and development needs of the campus.

    DevelopmeNt optioNsAfter establishing the vision and needs of the campus, the second phase established planning and design principles to guide the planning process. The stakeholder engagement process continued in this phase, with the goal of developing long range development alternatives and gain-ing consensus on preferred development alternatives.

    Above:

    Detailed LRDP planning process

  • introduction

    v o l u m e o n e chapter 1 introduction | 19

    techNicAl DetAils AND ANAlYsisThe third phase focused on refining the results of the second phase together with key stakeholders. The goal was to devel-op a refined preferred development alter-native; preliminary design guidelines and focus area concepts; a draft housing plan update; and technical memos containing details on the various technical elements of the lRDP, including campus design and land use, housing, landscape and open space, circulation and parking, infrastruc-ture, wayfinding and sustainability.

    implmeNtAtioN AND phAsiNgThe process of the fourth phase began with determining prioritization and phas-ing of the lRDP, as well as coordination with the Capital Plan. The planning team developed an administrative draft lRDP, as well as Design Guidelines and a re-fined focus area plan. Through coordina-tion with the Advisory and Policy Commit-tees, the administrative draft was further refined into a draft appropriate for stake-holder review, followed by the final lRPD and Design Guidelines.

    ApprovAl processThe final phase focuses on the approval process and adoption of the final plan.

  • section 1

    20 | U n i v e r s i t y o f W y o m i n g long range development plan

    Volume One Organization volume one of the lRPD is organized into the following seven chapters:

    chapter 1: Introduction provides an overview of the lRDP definition and pur-pose, process and organization.

    chapter 2: academic Mission and Vision describes the academic mission and vision, needs and characteristics that inform other elements of the Plan.

    chapter 3: planning Foundation summarizes the university’s historical pro-spective, regional and local context, and physical setting.

    chapter 4: Space planning and De-velopment Needs identifies existing land use characteristics and use of space and summarizes future land needs.

    chapter 5: plan Framework pres-ents the concepts that reflect the needs and desires of campus users, and orga-nizes the physical features of campus, es-tablishing a hierarchy to improve campus design.

    chapter 6: Major campus Design concepts describes key improvements driving campus development based on the planning and design principles and development framework.

    chapter 7: plan Implementation identifies clear directives for achieving the Plan’s vision and developing a logical strategy for phasing key improvements.

    Above:

    Art installation in Prexy’s Pasture