UTV towards Full Cost Reporting Model

29
University of Rome Tor Vergata UTV towards Full Cost Reporting Model Francesca Dominici: European Research Office Ljubljana 19-20 November 2009 Università di Roma “Tor Vergata”

description

 

Transcript of UTV towards Full Cost Reporting Model

Page 1: UTV towards Full Cost Reporting Model

University of Rome Tor Vergata

UTV towards Full Cost Reporting Model

Francesca Dominici:European Research Office

Ljubljana 19-20 November 2009

Università di Roma “Tor Vergata”

Page 2: UTV towards Full Cost Reporting Model

2

Page 3: UTV towards Full Cost Reporting Model

3

The University of Rome “Tor Vergata” is located in the South-eastern suburb of Rome

The buildings are located in a 640-hectares campus

A theatre has been restructured by UTV and Local Institutions

Accommodation for about 220 students

On going projects: Investment by the Municipality, new infrastructures (Rectorate, Law and Science Faculty,

Botanic Garden, the City and Museum of Sport)

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 4: UTV towards Full Cost Reporting Model

4

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

The University offers six schools:

LawSciencesEngineeringHumanitiesEconomicsMedicine

Page 5: UTV towards Full Cost Reporting Model

5

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

The University in figures

43.244 Students’ population

1.474 Professors and Researchers (staff)

962 Personnel of the Administration (staff)

61 Undergraduate degree courses (3-years)

55 Graduate degree courses (2-years)

5 One cycle Degrees (Medicines, Dentistry, Building Engineering and Architecture and

Law)

Page 6: UTV towards Full Cost Reporting Model

6

UTV towards FULL COST

- In the past EU FPs UTV in Additional Cost- In FP7 no cost models, only Full Cost

Full Cost requires:

ANALYTICAL CALCULATION METHODOLOGY OF ACTUAL INDIRECT COSTS TO BE CERTIFIED BY EC

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 7: UTV towards Full Cost Reporting Model

7

- GRADUAL PROCESS TO FC- UTV HAS OPTED FOR STFR before an analytical calculation methodology of actual indirect costs will be implementedThe methodology implies:the identification of the expenses items with respect to their destination: principle of accrual

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 8: UTV towards Full Cost Reporting Model

8

UTV CRITICAL POINTS with the methodology :

1) Problematic situations arising in using a corporate computerized tool based on financial accounting with consequent difficulties as regards the principle of accrual and in the identification of the expenses with respect of their destination

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 9: UTV towards Full Cost Reporting Model

9

UTV CRITICAL POINTS with the methodology :

2) the complexity of UTV internal organization: Central Administration/28 Departments

UTV will opt for a simplified method

OR for a more complex method?

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 10: UTV towards Full Cost Reporting Model

10

UTV CRITICAL POINTS with the methodology :

3) “minor” critical point: difficulty in collecting data from the different administrative offices involved (working group)

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 11: UTV towards Full Cost Reporting Model

11

UTV CRITICAL POINTS with the methodology:

4) the difficulty to identify separately the costs for the research activity excluding those related to teaching and assistance. Excluding also not elegible costs according to EC rules

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 12: UTV towards Full Cost Reporting Model

12

HOW UTV IS PROCEEDING for the identification of a calculation method of OH:

The main reference:Model Grant Agreement Annex VII E:EC requirements for the certification of the calculation methodology

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 13: UTV towards Full Cost Reporting Model

13

Indications reported in Annex VII E of the GA:

-Indirect Costs should include only the costs which provide support to the whole organization;-To exclude costs expressively referred to activity identified as “no research activity”;-To maintain separate common costs as far as possible, otherwise using objective drivers to assign the costs to the different activities;-The total costs shared and assigned should comply with the data registered in the accounting;-To exclude not elegible costs;-If a beneficiary opts for a simplified calculation method of OH it will be possible to identify the percentage of the general research costs for the whole legal entity without identifying different rates for different departments;-Free choice of the drivers.

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 14: UTV towards Full Cost Reporting Model

14

AT NATIONAL LEVEL:ADJUSTMENT OF RULES

ALSO for the Programmes funded by the Ministry of University and Research (MIUR) Introduction of analytical calculation method of general expenses based upon effective/real costs incurred and assigned as pro-rata according to a equal and corrected method duly justified (no more forfait)Law references: Ministry Decree 2 January 2008 MIUR; Ministry Decree n. 593 2000 MIUR; Legislative Decree 297 1999 (support the research and technological development and the mobility of the researchers EC Communication 2006/C 323/01)

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 15: UTV towards Full Cost Reporting Model

15

AT NATIONAL LEVEL:ADJUSTMENT OF RULES

The percentage of indirect costs will be determined by the total Indirect Costs for research and development

activities on the total cost for personnel according to the data registered in the last approved

consolidated financial statement

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 16: UTV towards Full Cost Reporting Model

16

WHAT UTV intends to do:

Identification of a calculation method of the percentage of general expenses of the

whole organization in particular referred to the research activity:

N/DN= all the general expensesD= research staff costs

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 17: UTV towards Full Cost Reporting Model

17

WHAT UTV intends to do:

The method followed is based on the financial accounting and possibly also

on the principle of accrual:- consolidated financial statement- Accounting amounts effectively paid- Calculated rate to be updated yearly

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 18: UTV towards Full Cost Reporting Model

18

WHAT UTV intends to do:

N: General expenses (no directly connected to a specific research project)- Premises operation (es. security, electricity, maintenance;- organizational operation (es. social charges, rent);- Services (es. postal charges, transport)

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 19: UTV towards Full Cost Reporting Model

WHAT UTV intends to do:D: Research staff costs and other personnel involved to the project

No distinction between research/teaching activities, as impossible, so all the related costs are considered: Careful approach!Permanent and Temporary Staff

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 20: UTV towards Full Cost Reporting Model

WHAT UTV intends to do:

Rate: (N/D)%

Not eligible items according to EC rules will be excluded

Main examples: VAT and IRAP!

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 21: UTV towards Full Cost Reporting Model

WHAT UTV is doing:• external auditor recruited by a public procurement for the certification;•Internal Working Group coordinated by our office “Ufficio Ricerca Europea” to collect and elaborate data;

Università degli Studi di Roma “Tor Vergata” www.uniroma2.it

Page 22: UTV towards Full Cost Reporting Model

22

International Relations Office

[email protected]

Head

Mobility/PlacementEuropean

Research Office

InteruniversityCooperationAgreements

Fellowships

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 23: UTV towards Full Cost Reporting Model

23

SCHOOL OF ECONOMICSVia Columbia 2www.economia.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 24: UTV towards Full Cost Reporting Model

24

SCHOOL OF ENGINEERINGVia del Politecnico 1www.ing.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 25: UTV towards Full Cost Reporting Model

25

SCHOOL OF MEDICINE and University Hospital of Tor VergataVia Montpellier 1 www.med.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 26: UTV towards Full Cost Reporting Model

26

SCHOOL OF HUMANITIESVia Columbia 1www.lettere.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 27: UTV towards Full Cost Reporting Model

27

SCHOOL OF SCIENCESVia della Ricerca Scientifica 1www.scienze.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 28: UTV towards Full Cost Reporting Model

28

SCHOOL OF LAWVia Orazio Raimondo 18www.juris.uniroma2.it

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Page 29: UTV towards Full Cost Reporting Model

29

Università degli Studi di Roma “Tor Vergata”

www.uniroma2.it

Thanks for the attention!

Francesca Dominici:European Research OfficeTel. 0039 06.72592226fax: 0039.06.7236605e-mail: [email protected]