Action Plan: No. 8 Action Plan for Rejuvenation of River Nandhor / Kailash (River Stretch: Along Sitarganj) Sitarganj, Distt. US Nagar (Uttarakhand) Priority - IV January, 2019

Transcript of (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake...

Page 1: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan: No. 8

Action Plan

for Rejuvenation of

River Nandhor / Kailash

(River Stretch: Along Sitarganj)

Sitarganj, Distt. US Nagar

(Uttarakhand)

Priority - IV

January, 2019

Page 2: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 1 of 26

Action Plan

for Rejuvenation of

River Nandhor / Kailash

(River Stretch: Along Sitarganj)

Sitarganj, Distt. US Nagar

(Uttarakhand)

Priority -IV

Approved by

Uttarakhand River Rejuvenation Committee

(Constituted in compliance of order of the Hon’ble N.G.T.)

January 31, 2019

Page 3: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 2 of 26

1. INTRODUCTION

River Nandhor/ Kailash originate from Pangoot, Nainital Forest and

flows downward along the Eldeco Sidcul Industrial Park (ESIPL)

Sitarganj and further Sitarganj town of Uttarakhand. River Nandhor

also known as river Kailash from Sitarganj onwards. Within the

catchment of river, about 66 operating industries are located in the

ESIPL Sitarganj, which contributes its wastewater to CETP for

treatment and disposal. 22 industries are presently not in operation.

CETP receives about 2.4-2.5 MLD wastewater against the installed

capacity of 4.0 MLD. Though the treated wastewater is being

disposed through land disposal (Karnal technology) and overflow

goes to Baigul canal, however, due to proximity of river

Nandhor/Kailash, possibility of illegal disposal of wastewater from

industries or CETP into river Nandhor/Kailash cannot be ignored. Two

drains of Sitarganj city flowing along the Maharana Pratap Chowk to

Khatima road also draining towards river Nandhor/Kailash.

Google image of Sitarbganj Town along with river Nandhor/Kailash (Not to scale).

Not to Scale

Page 4: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 3 of 26

Google image of river Kailash and Eldeco Sidcukl Industrial Park, Sitarganj.

WATER QUALITYGOALS:

It is an important aspect for maintain wholesomeness of river

Nandhor/Kailash in context of meeting water quality criteria for

bathing. As river passes close to the ESIPL, possibility of disposal of

industrial wastewater cannot be ignored; therefore close observation

is needed for any deterioration in water quality. Two drains from

Sitarganj town also passing towards river Nandhor / Kailash. In order

to meet the water quality criteria for bathing, it is imperative to keep

close observation on industrial units /CETP and drains flowing

towards river Nandhor/Kailash.

Water quality characteristics of river Nandhor in the year 2018 is as given below:

A. River Nandhor / Kailash at upstream of Sitarganj (US Nagar) Month pH BOD (mg/L) COD (mg/L) DO (mg/L) Jan-18 River Dry Feb-18 River Dry Mar-18 River Dry Apr-18 River Dry May-18 River Dry Jun-18 River Dry Jul-18 7.6 4.2 21 6.4 Aug-18 7.3 2 12 7.4 Sep-18 7.4 3.2 14 7.2 Oct-18 7.2 6 14 6.8 Nov-18 7.6 4 14 6.8 Dec-18 River Dry Average (Range)

7.42 (7.2-7.6)

3.88 (2-4.2)

15 (12-21)

6.92 (6.4-7.4)

Not to Scale

Page 5: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 4 of 26

B. River Nandhor / Kailash at downstream of Sitarganj (US Nagar)

Month pH BOD (mg/L) COD (mg/L) DO (mg/L) Jan-18 7.6 4 24 8 Feb-18 8.1 8 46 7.6 Mar-18 7.7 2 20 7.2 Apr-18 7.38 7 18 6 May-18 7.46 8.2 40 6.2 Jun-18 River Dry Jul-18 7.8 8.2 34 6 Aug-18 7.1 6 30 6.8 Sep-18 7.3 8 30 6.2 Oct-18 7.89 10 42 5.8 Nov-18 7.9 10 32 5.6 Dec-18 7.6 8 24 5.2 Average (Range)

7.62 (7.1-7.9)

7.21 (2-10)

30.90 (18-46)

6.41 (5.2-8)

Basis of Proposed Action Plan for rejuvenation of river

Nandhor/Kailash:

River Nandhor/Kailash is a spring fed river and and as such no direct

source of industrial wastewater have been reported in stream (before

ESIPL), therefore other sources including drains from town and

hamlets shall be identified.

2. COMPONENTS OF ACTION PLAN:

The proposed action plan for rejuvenation of river Nandhor/Kailash

consisting following components:

3.1 Source Control:

Source control includes industrial pollution control and treatment

and disposal of domestic sewage as detailed below:

(a) Industrial Pollution control:

i. Inventorisation of industries: List of industries located in

ESIPL, Sitarganj is given as Annexure-1.

ii. Industries which are connected with CETP shall meet the

CETP inlet in order to meet prescribed CETP inlet

standards as prescribed by UEPPCB (Annexure-2),

Page 6: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 5 of 26

iii. Treatment of effluents, compliance with standards and

mode of disposal of effluents.

iv. Regulatory regime: Compliance of effluent outlet standards

as prescribed under the Environment (Protection) Rules,

1986 as amended.

(b) Common Effluent Treatment Plant (CETP): As CETP

receives wastewater from about 69 operational industrial units,

therefore appropriate operation of CETP is to be ensured to

meet CETP outlet standards prescribed under the E(P) Rules,

1986 as amended (Annexure-3).

(c) Channelization, treatment, utilization and disposal of

treated domestic sewage/Municipal drain.

i. Identification of drains their discharge in the catchment of

river Nandhor/Kailash.

ii. Estimation of quantity of sewage generated and

requirement of treatment capacity.

iii. Storm water drains now carrying sewage and sullage

joining river Nandhor/Kailash and interception and

diversion of sewage to STP.

iv. Treatment and disposal of septage and controlling open

defecation.

(d) Solid Waste Management:

i. Collection, segregation, transportation, disposal and

treatment of municipal solid wastes generated from town in

accordance of provisions of the Solid Waste Management

Rules, 2016.

ii. Restriction illegal disposal of solid waste along the river

bank and flood plain zones.

iii. Burning of solid waste should be strictly prohibited.

iv. Construction and demolition wastes should be disposed in

designated areas and no case it should be disposed in to

river beds or flood plain zone.

3.2 River catchment/Basin management - Controlled ground

water extraction and periodic quality assessment:

i. Periodic assessment of groundwater resources and

regulation and regulation of ground water extraction by

Page 7: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 6 of 26

industries particularly in over exploited and critical

zones/blocks.

ii. Ground water re-charging/rain water harvesting.

iii. Periodic ground water quality assessment and remedial

actions in case of contaminated ground water tube

wells/bore wells or hand pumps.

iv. Assessment of the need for regulating use of ground water

for Irrigation purposes.

3.3 Flood Plain Zone.

i. Regulating activities in flood plain zone.

ii. Management of Municipal, Plastic, Hazardous, Bio-medical

and Electrical and Electronic wastes.

iii. Greenery development - Plantation plan.

3.4 Ecological/Environmental Flow (E-Flow)

i. Issues relating to E-Flow.

ii. Irrigation practices.

3. RIVER NANDHOR/KAILASH REJUVENATION PLAN:

Following are the action plan for rejuvenation of river

Nandhor/Kailash as detailed below:

1.1 Industrial Pollution Control:

ESIPL, Sitarganj consisting of heterogeneous nature of industries.

Following are the action points for sector-wise pollution control:-

(i) Maize Processing Industry:

(a) Wastewater containing high BOD and COD along with high

ammonical nitrogen shall be treated and disposed in order to

meet prescribed CETP inlet standards.

(b) Reuse of treated effluent shall be encouraged.

(c) CSL shall be not be disposed with wastewater connected to

CETP.

(ii) Electroplating Industries:

Page 8: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 7 of 26

(a) Electroplating industries which are the main source of metallic

contamination of surface and ground water should be insisted

for ‘ZLD’ system. Cyanide based electroplating process shall

not be permitted.

(b) All the electroplating units or having electroplating process or

industrial processes which are likely to discharge effluents

containing heavy metal or pollutants that may damage

environment, in such cases, UEPPCB shall make necessary

amendments to the CCA (Consolidated Consent &

Authorization) granted under the Water (Prevention and

Control of Pollution) Act, 1974; the Air (Prevention and

Control of Pollution) Act, 1981 and the Hazardous and Other

Wastes (Management & Transboundary Movement) Rules,

2016, for incorporation of the effluent discharge standards for

all the parameters as prescribed under Environment

(Protection) Act, 1986.

(c) All the industrial units should have consents under Water

(Prevention and Control of Pollution) Act, 1974 and Air

(Prevention and Control of Pollution) Act, 1981 as well as

Authorisation under the Hazardous & Other Waste

(Management & Transboundary Movement) Rules, 2016 as

amended and Consents or Authorization as applicable should

be granted or renewed only after verification or ensuring

adequate systems for disposal of treated effluents or

verification of compliances to the granted

Consents/Authorization strictly.

(iii) Specific Action Points:

(a) UEPPCB with the support of District Industry Centre (DIC)

shall carryout inventory of industries within two months time

and all the industries which are presently in operation without

Consent under Water (Prevention and Control of Pollution)

Act, 1974 and Air (Prevention and Control of Pollution) Act,

1981 as the case may be should be directed by UEPPCB to

obtain consent within three months and failing which action

should be taken by UEPPCB for closure of all such industrial

units.

Page 9: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 8 of 26

(b) All the hazardous waste generating industries or the

industries covered under Schedule-I of the Hazardous and

Other Waste (Management & Transboundary Movement)

Rules, 2016 as amended, should be directed to obtain

authorization within a month from UEPPCB and failing which

action should be taken by UEPPCB for closure of all such

industrial units.

(c) All the GPIs category industries have provided OCEMS at the

outlet of ETPs. Industries will be directed to take measures to

transfer real time data with auto validation facilities to the

UEPPCB and CPCB with immediate effect.

(d) No industry should operate or continue manufacturing

process unless they possess valid permission for ground

water extraction from Central Ground Water Authority

(CGWA). All such industries shall obtain groundwater

extraction permission from the Central Groundwater Board

(CGWA) within three month time period.

(e) Small scale/tiny and service providing units located in urban

or semi-urban limits like Dairies, Auto Service Stations etc.,

should not be allowed to dispose waste water effluents or

sledges into drains, thereby ensuring not causing damages to

drains or sewers. Such units should have minimum provision

of Oil & Grease traps.

(f) Drains carrying industrial wastewater shall be monitored

regularly by the UEPPCB.

(g) Burning of any kind of waste including industrial solid waste

and agriculture residue should be completely prohibited.

1.2 Treatment of Sewage:

(a) About 5.16 MLD sewage is generated from the entire city. As

such no STP is proposed for the city.

(b) All municipal drains leading to river Nandhor/Kailash should

be identified and their interception and diversion along with

treatment plan shall be prepared.

(c) Septage management protocol shall be strictly followed.

Sewage Treatment Plan:

Page 10: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 9 of 26

(a) Uttarakhand Jal Nigam would undertake measurement of flow

of the drain(s) and formulate detailed project report (DPR) for

each drain for treatment.

(b) The flow in each drain should exclude monsoon flow. Further,

any drain if receiving fresh water from any escape channel

etc, should be examined for its diversion rather than mixing

with sewage.

(c) DPRs should be submitted to the River Rejuvenation

Committee (RRC) for consideration as a part of

Ganga/Yamuna basin management plan.

(d) Sewage treatment plan should also consider treatment and

disposal of sewage from villages/gram panchayats/isolated

settlements including discharge form toilets constructed

under Swachh Bharat Abhiyan.

(e) Hotels/Restaurants particularly located on road-side should

not dispose untreated sewage and solid waste into nearby

pubic drain or rivers, such establishments should be properly

regulated and levied with fines as directed by Hon’ble NGT in

Ganga matter in case of any violation.

4.3 Solid Waste Treatment and Disposal:

(a) About 5.99MTPD solid waste is generated from 13 ward of

the Sitarganj town. Action plan for solid waste processing and

disposal has been prepared by the Directorate of Urban

Development based on cluster approach.

(b) Door to Door collection of solid waste shall be encouraged

and only segregated waste shall be accepted.

(c) Biodegradable wastes shall be used for composting while

recyclable waste shall be sent to registered recyclers.

(d) Action Plan for Solid waste Management for Sitaragnaj town

as prepared by the Urban Development Directorate,

Uttarakhand shall be implemented.

(e) No case Construction and Demolition waste shall be

disposed in river bed or flood plain zone. Nagar Nigam

Rudrapur shall identify the site for such wastes.

1.3 Ground Water Quality:

(a) So far contamination of groundwater is not reported in the

area, however groundwater quality monitoring shall be carried

Page 11: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 10 of 26

out at least twice in the year (winter: December-January and

summer: May-June) at three locations to ascertain level of

pollutants in groundwater.

(b) CGWA would be requested to identify over exploited and

critical blocks in the area with respect to the ground water

extraction and industries be directed to comply with CGWA

conditions.

(c) UPPCB should be vigilant and conduct surprise inspection of

the industry to rule out any forceful injection of industrial

effluents into groundwater resources or disposal of effluent in

rain water recharge pits.

(d) No industrial unit should be establishment or allowed to

continue its operation unless they obtain permission from

CGWA for ground water extraction within three month.

(e) Rain water harvesting of industrial, commercial and other

institutions may be insisted upon by CGWA and groundwater

recharging with only clean water be encouraged by CGWA.

4.5 Flood Plan Zone (FPZ):

The Uttarakhand Irrigation Department shall

identity/demarcates Flood Plain Zone and regulate the

activities. Such regulations would also cover:

(a) Plantation in Flood Plain Zone (FPZ) – By State Forest

Department.

(b) Checking encroachments – By District/Local

Administration.

(c) Prohibition of disposal of municipal and bio-medical waste

particularly in drains – By Local administration.

(d) State Government may notify Flood Palin Zones – within

six months.

4.6 Environmental Flow (E-Flow):

Page 12: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 11 of 26

(a) River Nandhor/Kailash carrying very thin and lean flow of

original water.

(b) Fresh water flowing through escape channels/small

barrages should be checked. Good quality of water should

not be used for dilution of pollution unless; required degree

of treatment is achieved for municipal sewage and

industrial effluents.

(c) To conserve water and good irrigation practices to be

adopted by the farmers for which mass awareness

programmes through media be provided in vernacular

languages to the farmers by the Uttarakhand State

Irrigation and Agriculture Departments.

4.7 Monitoring of Action Plan:

The proposed Action Plan will be monitored by the River

Rejuvenation Committee (RRC) constituted by Government of

Uttarakhand vide Office order dated 05.12.2018, under the overall

supervision and co-ordination of Principal Secretary, Environment,

Govt. of Uttarakhand.

2. ACTION PLAN:

Short Term and Long Term Action and the Identified Authorities

for initiating actions and the time limits for ensuring compliance:

S.N.

Action plan for rejuvenation

of

river Nandhor/Kailash

Organisation/

Agency

Responsible for

Execution of the

Action Plan

Time

Target

1. Industrial Pollution Control

a) Action plans suggested

under section - of the

Action Plan.

UEPPCB Within

Three

months.

b) Inventorisation of the

industries in the catchment

area of River

Nandhor/Kailash covering

DIC, US Nagar &

UEPPCB

Within

two

months.

Page 13: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 12 of 26

assessment on aspects

relating to Status of

Consents under Water &

Air Acts and Authorisation,

Effluent Generation, ETP

capacities and final mode

of effluent discharges.

c) Actions against the

Identified industries in

operation without

Consents under Water &

Air Acts/Authorisation

under the H & OW (M &

TM) Rules, 2016 as

amended.

UEPPCB Within

three

months.

d) Action against the

industries not installed

ETPs or ETPs exist but

not operating or ETP outlet

or treated effluent is not

complying with effluent

discharge norms.

UEPPCB Within

three

months.

e) Action against the GPIs

which have not providing

continuous real-time

effluent quality data to

UEPPCB and CPCB.

UEPPCB Within a

month.

f) Routine /surprise

inspection GPIs and Red

category of industries for

ensuring compliance of

effluent discharge

standards as prescribed

under E(P) Rules, 1986,

as amended.

Special

Environmental

Surveillance

Task Force /

UEPPCB

Regularly

.

g) Small scale/tiny and

service providing units

located in urban or semi-

urban limits like Dairies,

Auto Service Stations etc.,

have minimum provision of

Oil & Grease traps.

UEPPCB Within

three

month.

Page 14: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 13 of 26

h) Monitoring of drains

carrying industrial

wastewater (if any).

UEPPCB Within a

month.

i) Prohibition of Burning of

any kind of waste including

agro-residue.

Nagar Palika

Parisad,

Sitarganj /

District

Administration

Within a

month.

j) Operation of CETP in

order to meet the

prescribed outlet effluent

discharge standards and

performance monitoring.

SIIDCUL /

UEPPCB

Within a

month

k) Installation of Online

Continuous Effluent

Monitoring System at

CETP outlet and 24x7

data transfer connectivity

to CPCB and UEPPCB.

SIIDCUL Within15

days.

2. Sewage Treatment & Disposal Plan

a) Estimation of total sewage

generation, existing

treatment facilities,

quantum of disposal of

sewage presently through

drains and / the gaps in

sewage treatment

capacity.

Uttarakhand Jal

Nigam / Nagar

Palika Parisad,

Sitarganj

Within

two

months.

b) To undertake

measurement of flow of all

the drains presently

contributing pollution load

in river Nandhor/Kailash

and formulate Detailed

Project Report (DPR) for

each drain and submit

DPR to RRC. Plan for

utilization of treated water

(at least 75%) should be a

part of DPR. Proposal

should include installation

Uttarakhand Jal

Nigam / Nagar

Palika Parisad,

Sitarganj

Within

two

months.

Page 15: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 14 of 26

of OCEMS & PTZ camera

at STP Outlet.

c) Channelization including

diversion of sewage

generated from household

/ township / villages to

sewer lines and

interception of all drains

(excluding drains carrying

industrial wastewater) for

ensuring proper treatment

through appropriate

treatment system.

Jal Nigam /

Nagar Palika

Parisad,

Sitarganj

Within

six

months

after

commissi

oning of

Treatme

nt

system

d) Ensuring dairy /

automobile service

stations and Hotels/

Restaurants should have

their own treatment

system and levy of fine in

case found violation.

UEPPCB / Nagar

Palika Parisad,

Sitarganj

Within

three

months.

e) Monitoring of STP outlet

effluent quality w.r.t. STPs

effluent discharge norms

prescribed under E(P)

Rules, 1986 as amended.

UEPPCB. After

commissi

oning of

STP.

4. Solid Waste Treatment and Disposal

a) Implementation of Action

plan for Solid Waste

Management for Sitarganj

town prepared by Urban

Development Directorate,

Uttarakhand shall be

implemented. No case

collected solid waste shall

be disposed illegally into

river bed /flood plain zone.

Urban

Development

Directorate /

Nagar Palika

Parisad,

Sitarganj.

Within a

year.

b) Door to door collection of

solid waste shall be

encouraged.

Nagar Palika

Parisad,

Sitarganj.

Within a

month.

c) Composting will be made

out of bio-degradable

waste and recyclable

Nagar Palika

Parisad,

Sitarganj.

Within

two

months.

Page 16: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 15 of 26

waste shall be disposed

thorough registered

recyclers.

d) Construction and

demolition waste shall be

disposed in designated

area/place only.

Designated place shall be

earmarked by the Local

authority.

Nagar Nigam,

Rudrapur.

Within a

month.

5. Ground Water Quality

a) Groundwater quality

monitoring at three

locations during summer

(May-June) and winter

(December-January)

UEPPCB Within a

month.

b) Identification of over

exploited and critical area

w.r.t. groundwater

extraction.

CGWA Within

six

months.

c) To conduct periodic

surprise inspection of

industries to rule out any

forceful injection of

industrial wastewater in to

groundwater or disposal of

wastewater through

rainwater recharging pit.

UEPPCB /

CGWA

Regularly

d) All the industry should be

directed to obtain

necessary permission for

groundwater extraction

from CGWA.

UEPPCB

/CGWA

Within

three

month.

e) Ensure rainwater

harvesting by industries,

commercial complexes /

institutions and

groundwater recharging

with clean water.

CGWA Within

six

months.

6. Flood Plain Zone (FPZ)

a) Demarcation of flood

plain zone and notification

Uttarakhand

Irrigation

Within

six

Page 17: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 16 of 26

of Flood Plain Zone Department. months.

b) Plantation in Flood Plain

Zone

Uttarakhand

Forest

Department

By next

monsoon

.

c) Checking encroachment

in the FPZ of

Nandhor/Kailash River.

District

Administration,

US Nagar /

Nagar Nigam,

Rudrapur

Within

three

months.

d) Prohibition of disposal of

municipal plastic waste

and biomedical wastes

particularly in drains and

FPZ.

Local

Administration /

Nagar Nigam,

Rudrapur

Within a

month.

7. Environmental Flow (E-Flow) and Irrigation Practices

a) Measurements of

Nandhor/Kailash River

flow of at upstream and

downstream of Sitarganj

town and maintain record.

Uttarakhand

Irrigation

Department.

Regularly

b) To conserve water and

good irrigation practices

to be adopted by the

farmers by organising

mass awareness

programmes through

media in vernacular

language.

Uttarakhand

Irrigation

Department /

Department of

Agriculture.

Regularly

.

*******************************

Page 18: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 17 of 26

Annexure-1

List of industries connected with CETP, ESIPL , Sitarganj (US Nagar)

SN Name Address Status

1 Gujarat Ambuja Exports Ltd.

C-50, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

2 Balaji Action Ltd. C34 & C34 (A),Ph-III Eldeco Sidcul 262405

Connected

3 Laopala RG Ltd. B-108,Phase I,Eldeco Sidcul Industial Park Sitarganj 262405

Connected

4 Karam Industries C-35 A, Phase III, Eldeco Sidcul Industrial Park, Sitaragnj 262405

Connected

5 Mascot Fastners Pvt. Ltd.

B-155, Phase I, Eldeco Sidcul Industrial Park, Sitaragnj 262405

Connected

6 Indian Tonners & Devlopers Ltd.(ITDL)

D-11, Phase II, Eldeco Sidcul Industrial Park, Sitaragnj 262405

Connected

7 SNB Infra Heights Ltd. B-09, Phase I, Eldeco Sidcul Industrial Park,, Sitaragnj 262405

Connected

8 Foundation Brakes A-194 (B) , Phase I, Eldeco Sidcul Industrial Park, Sitaragnj 262405

Closed

9 Evergreen Motels B-173 a, Phase I, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

10 Hi Tech Corporation Ltd.

D 63-64, Phase II, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

11 Alpla India Ltd. D 11 (C), Phase II, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

12 Setco Automotive Ltd. A 196, Phase I, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

13 Henkel Chembond Surface Ace Tech. Ltd

A 128, Phase -I, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

14 Henkel Chembond Surface Ace Tech. Ltd.

A 113, Phase -I, Eldeco Sidcul Industrial Park, Sitarganj 262405

Connected

15 PUNJAB BEVEL GEARS. Ltd

D-174,PHASE -I ELDECO SIDCUL INDUSTRIAL PARK Sitarganj 262405

Connected

16 Ghaziabad Precision Products Pvt. Ltd

D-50,PHASE- II ELDECO SIDCUL INDUSTRIAL PARK Sitarganj 262405

Connected

17 Speciality Industrial Polymers & Coatings Pvt. Ltd

A-165 PHASE- I ELDECO SIDCUL INDUSTRIAL PARK Sitarganj 262405

Connected

18 Parle Biscuits Pvt. Ltd. D-10,Phase-II, Eldeco Sidcul Industrial Park Sitarganj 262405

Connected

Page 19: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 18 of 26

19 Shri Sai Viswas Polymer

B-87&188,PHASE- I ELDECO SIDCUL INDUSTRIAL PARK Siatrganj 262405

closed

20 Maharani Innovative paints Pvt. Ltd.

B-03,PHASE- I ELDECO SIDCUL INDUSTRIAL PARK Siatrganj 262405

Closed

21 Vishal Plastic Industries

C-93 Phase III, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

22 Associate Appliance Ltd.

A-194L,Phase I, ELDECO SIDCUL Industrial Park Sitarganj 262405

Closed

23 Reckitt& Benkiser( Dry) B-170, Phase -1, ELDECO SIDCUL Industrial Park

Connected

24 Reckitt& Benkiser( Wet)

B-96, Phase -1, ELDECO SIDCUL Industrial ParkSitarganj 262405

Connected

25 Isthmus Industries A 198

A-198, Phase-I, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

26 Isthmus Industries A 201

A-201, Phase-I, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

27 Atpac Industries Plot No-A-21, Phase-I, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

28 Brakes India B-9, Phase -I, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

29 Agemco Faucets Pvt Ltd.

Plot No. C-37(b), Phase-II, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

30 Crl Rubber Industries Plot No, D-32-34, Phase-I, ELDECO SIDCUL Industrial Park Sitargnaj 262405

Connected

31 Moraceae Pharmaceuticals

Plot No. A-66, Phase-1, ELDECO SIDCUL Industrial Park Sitargnaj 262405

Closed

32 Pes Engineers Pvt. Ltd Plot No. A-103, Phase-1, ELDECO SIDCUL Industrial Park Sitarganj 262405

Connected

33 Shiran Electricals Plot No. A-22, Phase-1, Eldeco Sidcul Industrial Park Sitarganj 262405

Connected

34 Surin Auto Pvt. Ltd A-194, Phase-1, Eldeco Sidcul Industrial ParkSitarganj 262405

Connected

35 Western Consolidated Pvt.Ltd

A-194 (e-f)Phase-1, Eldeco Sidcul Industrial Park Sitarganj 262405

Connected

36 Starways Industries A-124/125 Phase-I Eldeco Sidcul Industrial Park 262405

Connected

37 Kae Engineers Pvt.Ltd B-159,Phase-I Eldeco Sidcul Industrial Park 262405

Connected

Page 20: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 19 of 26

38 Ang Industries Ltd. A-197,Phase-I Eldeco Sidcul Industrial Park 262405

closed

39 Rajmata Engg. P. Ltd D-77Phase-II Eldeco Sidcul Industrial Park 262405

Connected

40 Rama Industries A-82b Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

41 PN Die Casting P. Ltd. D-76,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

42 M.B. Thermoforming A-132 Ph-IEldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

43 Mahalaxmi Sand & Minerals

D-82 Ph-IIEldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

44 Parul Fabricators B-124, Ph - 1Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

45 Arjan Auto Technologies

D-81 Ph-IIEldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

46 Remsons Cable Industries

B-154 Phase I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

47 Fleet Guard Filters D-62 Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

48 Klb Electricals C-72 Ph-III,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

49 Klassic Klarol B-226& 227 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

50 Innovative Textile B-08 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

51 Shree Patel Industries D-73 Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

52 Daksh Electronics B-220 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

53 Mehra Metal Component P Ltd.

B-141 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

54 Uttaranchal Auto D-42 Ph-II,,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

55 Pbg Industries D-39 ph-II,,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

56 SSP PLtd. C-60 A,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

57 Jay Switches P Ltd. D-79 PH-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

58 Tara Health Food A-02,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

Page 21: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 20 of 26

59 Savitri Electronics B-173 Ph-I,,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

60 Primavera Manufacturing Company Pvt. Ltd.

D-53&D-54Phase-II, Eldeco Sidcul Industrial Park Sitarganj 262405

Connected

61 Automotive Stampings A-194(a), Phase-1, Eldeco Sidcul Industrial Park Sitargnaj 262405

Closed

62 Parle Agro Pvt.Ltd. Plot No: 153-157& 166-168 Sector -03 , IIIE Sidul 262405

Connected

63 Stork Rubber Products Pvt. Ltd

D-38 Ph-II, Eldeco Sidcul Industrial Park Sitargnaj 262405

Connected

64 Fiberfill Engineers B-212,219 Ph-II Eldeco Sidcul Industrial Park Sitargnaj 262405

Closed

65 BSN Auto D-59 PH-II Eldeco Sidcul Industrial Park Sitargnaj 262405

Closed

66 Technical Associates Ltd.

B-07 Ph-I, Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

67 RC Repro Trade(121-a)

A-121(a) Ph-IEldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

68 Mr. Sandeep Kr. &Chetan Kr.

B-203 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

69 Talbros Automotive Components Ltd.

B-177Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

70 Tusshar Axles Pvt. Ltd. C-186 Ph III Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

71 RC Repro Trade A-6d A- 6(d) Ph-IEldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

72 Shilpkar(India)Pvt. Ltd. A-171 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

73 Lapo Pharma B-213 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

74 Kamal Plastomet A-5 Ph-I,,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

75 Amcor India Flexibles C-60b Ph-III,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

76 Zee Insulated Wires Pvt. Ltd

Closed

77 Amrit Udyog B-189 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

78 Bubeck Technologies B-211 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

79 Wilson Engineering D-11b Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

Page 22: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 21 of 26

80 Aaron Helmets Pvt. Ltd.

A-1 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

81 Heinz India Pvt.Ltd D-99 A&B&100,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

82 Rex Polyextrusion Pvt.Ltd.

C-06 Ph-III,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

83 Ravi Packaging Pvt. Ltd

A-166 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

84 Kumaoun Ispaat Pvt. Ltd.

D-80 Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

85 Essae Digitronics Pvt Ltd

D-61 Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

86 Manuconcast Pvt Ltd D-67 Ph-II,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Closed

87 Trinity Adhesive Pvt. Ltd.

A-174 Ph-I,Eldeco Sidcul Industrial Park, Sitarganj - 262405

Connected

88 Jainsons Engineering Pvt. Ltd.

C-62-63, Phase III, Eldeco Sidcul Industrial Park,Sitarganj 262405

Closed

89 Atlanta Remedies C-106 Phase III, Eldeco Sidcul Industrial Park,Sitarganj 262405

Connected

90 Upto date Plastic D-35 D-35 Phase II Eldeco Sidcul Industrial Park,Sitarganj 262405

Connected

91 A.q. Industries C-07 Phase III Eldeco Sidcul Industrial Park,Sitarganj 262405

Connected

Page 23: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 22 of 26

Annexure-2

Page 24: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 23 of 26

Annexure-3

Page 25: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 24 of 26

Page 26: (Uttarakhand) - Telangana Pollution Control Board · (a) Uttarakhand Jal Nigam would undertake measurement of flow of the drain(s) and formulate detailed project report (DPR) for

Action Plan for Rejuvenation of River Nandhor/Kailash (along Sitarganj), Sitarganj (US Nagar)

Page 25 of 26

****************************************