Utility MATS - Compliance with the Low Emitting EGU Compliance Option
description
Transcript of Utility MATS - Compliance with the Low Emitting EGU Compliance Option
![Page 1: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/1.jpg)
www.all4inc.comKimberton, PA | 610.933.5246Columbus, GA | 706.221.7688
Utility MATS -Compliance with the Low Emitting EGU Compliance
Option
Eric M Swisher| [email protected] | 610.933.5246 ext. 117April 8, 2013
Presented by All4 Inc.
![Page 2: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/2.jpg)
2 Your environmental compliance is clearly our business.
Low Emission Electrical Generating Unit (LEE)• Reduced Emission Testing• Minimal Monitoring Requirements
Emission Testing• Quarterly
Monitoring• CEMS• Parametric
Utility MATS Compliance Strategies
![Page 3: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/3.jpg)
3 Your environmental compliance is clearly our business.
Hydrogen Chloride HCl• CEMS (SO2 Monitor)
Particulate Matter (PM)• LEE
Mercury (Hg)• LEE
Presentation Homework
![Page 4: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/4.jpg)
4 Your environmental compliance is clearly our business.
Evaluate Various Emission Testing Firms• Negotiate Contracted Rates• Assess Resources
Personnel Trucks/Trailers/Equipment Location(s) Reporting
• Award Multiple Contracts• Start Testing Early
Emission Testing
![Page 5: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/5.jpg)
5 Your environmental compliance is clearly our business.
U.S. EPA Reference Method 5 (Filterable) Initial Performance Test (LEE Qualification)
• 3-Run Emission Test Program ~90-min Sampling Time Each Onsite analysis
• Maximum Normal Operating Load Conditions 90 and 110% of unit design capacity
• Quarterly Testing for 3 Consecutive Years Unit operating quarter (> 168 hours) 80 to 100 calendar days after the previous performance test
Subsequent Performance Test (LEE Status) Every 36 calendar months
~$12,000 per Test Program
PM Testing
![Page 6: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/6.jpg)
6 Your environmental compliance is clearly our business.
U.S. EPA Reference Method 30B Initial Performance Test (LEE Qualification)
• 30-day Performance Test • Facility’s 40 CFR 75 Monitoring Systems
Subsequent Performance Test (LEE Status)• Every 12 calendar months
~$44,000 per Test Program• Plant Personnel Training• Internet Access• Analysis (1 set of tubes per 5 days)
Hg Testing
![Page 7: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/7.jpg)
7 Your environmental compliance is clearly our business.
0 5 10 15 20 25 30 35 40$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
Operating Quarter
LEE
Em
issio
n T
esti
ng
Co
st
LEE Status
Annual Hg Test-
ing
3-yr PM Testing
Annual Hg &
Quarterly PM Test-
ing
$117 K
$55 - 70 K
LEE Emission Testing Costs
![Page 8: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/8.jpg)
8 Your environmental compliance is clearly our business.
Resume Quarterly PM Testing Monitoring Compliance Options
• PM CEMS• PM CPMS
Lose PM LEE Status
![Page 9: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/9.jpg)
9 Your environmental compliance is clearly our business.
PM Compliance Option Cost Comparison
0 5 10 15 20 25 30 35 40$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
PM CEMS PM CPMS Emission TestingQuarter
Op
era
tin
g C
ost $116
K
![Page 10: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/10.jpg)
10 Your environmental compliance is clearly our business.
Resume Quarterly Hg Testing Install and certify Hg CEMS within 6 months
Lose Hg LEE Status
![Page 11: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/11.jpg)
11 Your environmental compliance is clearly our business.
Hg Compliance Option Cost Comparison
0 5 10 15 20 25 30 35 40$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
Hg CEMS Hg Sorbent TrapQuarter
Op
era
tin
g C
ost
![Page 12: Utility MATS - Compliance with the Low Emitting EGU Compliance Option](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562eff3d8b42a213b8b4f7a/html5/thumbnails/12.jpg)
www.all4inc.comKimberton, PA | 610.933.5246Columbus, GA | 706.221.7688
Questions ?
Eric M Swisher| [email protected] | 610.933.5246 ext. 117