Utilities Meter. Meter Reading Device Information on the Device.
-
Upload
domenic-bell -
Category
Documents
-
view
226 -
download
2
Transcript of Utilities Meter. Meter Reading Device Information on the Device.
Leveraging Investments• Internal - Employees
– Quicker response time to our customer requests– Integrated work flow management– Improved asset control– Real time information to the FP&M workforce
• Internal – Supervisors– Information and decision making in hands of
managers– Information and input from the frontline workforce
• Time entry
• Work order closing
• Material orders
• Ad hoc reporting
Where we started
• Started CAD in 1984 with Carrier E2000 when Iowa State installed it’s own telephone system.
• Converted to AutoCAD with release of Version 9 in the fall 1987.
• This involved upgrading from PASCAL to DOS operating systems.
Where are we now• Currently we are using AutoCAD
Architecture 2009.
• Linking plats to FAMIS space data using FAMISCAD.
• Started looking at Revit in 2004
• Purchased Mapguide in 2005
PURPOSE OF THE REVIT MODEL
• BUILD COMPLETE AS-IS BUILDING INFORMATION MODEL.
• VEHICLE TO CONTINUE PROVIDING 2D PLAT INFORMATION.
Will we reach our GOAL
• TO CREATE 3D BUILDING INFORMATION MODEL OF EXISTING ISU FACILITIES BUILDINGS AND SPECIFICALLY MODEL BUILDINGS TO EXISTING AS-IS CONDITIONS.