Using perfomance evaluation methods for cost /benefits analysis
description
Transcript of Using perfomance evaluation methods for cost /benefits analysis
![Page 1: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/1.jpg)
Cost/Benefit Analysis of Military Training2012-06-06
Using perfomance evaluation methods for cost/benefits analysis
![Page 2: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/2.jpg)
• Alexander Ahl• Analyst• MSc Computer Science
• FOI (2006) • Seconded OA to SwAF, 2006-
• Camilla Andersson• Deputy Research Director• MSc Operations Research• MSc Physics
• FOI (1997)• Seconded OA to SwAF, 2004-
2007, 2009-2011
![Page 3: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/3.jpg)
Hypothis test• Currently Sweden conducts continuous performance
assessments, which allows us to track the unit’s development throughout its lifetime.
• How can this be used for cost/benefit analyses?
![Page 4: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/4.jpg)
Unit development cycle
Training Predeployment Operation Recuperation Training
2 Years
![Page 5: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/5.jpg)
Swedish Training Concept
Basic Training
Platoon
Company & Platoon
Battalion & Company
Battalion
Battalion with
branches
Performance
Time
![Page 6: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/6.jpg)
![Page 7: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/7.jpg)
Swedish Training Concept
Basic Training
Platoon
Company & Platoon
Battalion & Company
Battalion
Battalion with
branches
Performance
Time
![Page 8: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/8.jpg)
Comparisons• Same unit different year• Same type of unit same year
• Change in number of exercises• Change in type/quality of exercises
• Investment/procurement – Simulation equipment– Increased number material
![Page 9: Using perfomance evaluation methods for cost /benefits analysis](https://reader036.fdocuments.us/reader036/viewer/2022070421/56816197550346895dd1458a/html5/thumbnails/9.jpg)