Using GNSS to establisha Height Datum on a Survey
www.quickclose.com.auRichard Stanaway QUICKCLOSE
![Page 2: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/2.jpg)
Overview of GNSS Heighting
Height systems and Geoid models
AHD and MSL
Measuring ellipsoid Heights
Working with height datum offsets
Victorian case-study - Murray Valley LiDar
![Page 3: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/3.jpg)
The Geoid
Universität Stuttgart
![Page 4: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/4.jpg)
Heighting Surfaces
![Page 5: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/5.jpg)
Differences between MSL and the geoid(Mean Dynamic Topography)
![Page 6: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/6.jpg)
H = h - N N = h - H
![Page 7: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/7.jpg)
Australian Height Datum
![Page 8: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/8.jpg)
GDA94 Ellipsoid Height
![Page 9: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/9.jpg)
Ausgeoid98
![Page 10: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/10.jpg)
local AHD offset (o) can computed by GNSS/GPS measurements at local PMs.
o = H(AHD) – h(GDA94) + N(Ausgeoid98)
H(AHD) = h(GDA94) - N(Ausgeoid98) + o
![Page 11: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/11.jpg)
Complications…..
AHD20?? – 0.1 to 0.2 m higher (sea level rise)
Regional and localised subsidence (groundwater changes)
Levelling errors and mark disturbance
![Page 12: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/12.jpg)
Antenna Reference Point and Phase
Centre
GNSS measurements made to phase centre (and not antenna reference point)
“trunnion axis of the GPS”
Different antennas have different phase centre
offsets!!
Good advice to use phase centre heights rather than
ARP heights if different antennas are used
![Page 13: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/13.jpg)
Steps to get “local” AHD using GNSS/GPS
1. Determine phase centre offsets / models2. Ensure correct geoid model is used
(Ausgeoid98 or Ausgeoid09 in Victoria)
3. Take measurements at local high order (3rd order or higher) PMs/PSMs to compute offset (o)
(The Ausgeoid surface should be parallel with AHD over a localised area)
4. Apply the offset to Ausgeoid derived elevations in order to align them with local AHD
Some later GNSS systems have a local geoid builder in their software (local AHD calibration).
Alternatively, a local geoid model can be created and loaded into a GNSS controller or software
![Page 14: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/14.jpg)
LiDar Ground validation - example
![Page 15: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/15.jpg)
Ground Validation Points
![Page 16: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/16.jpg)
Local AHD Control
![Page 17: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/17.jpg)
Control Information
![Page 18: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/18.jpg)
Static Data Processing - Setup
![Page 19: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/19.jpg)
Network and Baselines
![Page 20: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/20.jpg)
Network and Baselines
![Page 21: Using GNSS to establish a Height Datum on a Survey Richard Stanaway QUICKCLOSE.](https://reader030.fdocuments.us/reader030/viewer/2022020718/5513cce655034679748b4aed/html5/thumbnails/21.jpg)
Results
Baselinesolutions