User Manual Installation BOM Extraction for Elevators - Draft
description
Transcript of User Manual Installation BOM Extraction for Elevators - Draft
User Manual: Installation BOM Extraction for Escalators
SAP IMPLEMENTATION PHASE II (Installation Material)
User Manual for Elevators Installation BOM Extractionfor Mitsubishi Elevator ETA India Pvt. Ltd
(Formerly ETA MELCO Engineering Co. Pvt. Ltd)This is a hardcopy of document maintained on electronic media. It is the latest version. November 2013
Table of Contents
3Process Flow:
4Installation Material and Man Hours
6To add Installation Material:
7To post Installation Material:
8To add Man Hours:
8To post Man Hours:
Process Flow:
Installation Material and Man HoursT.Code: ZINST_MAT - Material Installation and Man Hour Select Elevator from the Menu under Installation Material
Select the Sales Contract and the Item Number for which the installation material and Man Hours to be estimated and click on Fetch Data
The screen will be populated with the data as below:
If the data retrieved by the system needs to be changed, Click on to change the values and click on Save after updating.
Click on Simulate to get the list of Installation Local Material and Man Hours.
To add Installation Material:
The installation material can be added under the Add Installation Material Tab, by using and .
To post Installation Material:
Click on to post the installation material to the project.
Installation Material will be posted to the project and the status of upload will be displayed with remarks as below.
To add Man Hours:
The Man Hours can be added under the Add Man Hour Tab, by using and .
To post Man Hours:
Click on to post Man Hours under Installation Labour of the selected project.Validate the uploaded data in the project explorer
T Code: CJ20N
Inquiry
Quotation
Inquiry
Quotation
Sales Contract
Post Man Hours
Post Installation Material
2