Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro...

8
Useful information about Elektro Gorenjska Company for year 2015

Transcript of Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro...

Page 1: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Useful information about Elektro Gorenjska Company for year 2015

Page 2: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Presentation of the company

Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly with its electricity infrastructure to ensuring conditions for existence and development of economy in Slovenia and Gorenjska region.  The surface area of supply: 2.091 km2

Area of the Republic of Slovenia: 20.256 km2

Fields of business

• Distribution of electricity;• Other activities in the field of electricity and non-energy market activities, which include mainly designing, consulting, constructing and maintenance of electric energy facilities and other services for the needs of the company as well as for external clients or market (hereafter also other services for the market or other activities).

Certification management systems

Elektro Gorenjska Company is the owner of three management certificates: ISO 9001, ISO 14001 and OHSAS 18001, the company is also owner of Family- friendly company basic certificate. In 2013 the company received the highest national award for business excellence in Slovenia for 2012, which is the result of continuous activities at all fields of operation and management of the company and which confirms that Elektro Gorenjska Company meets the demanding criteria of the European model of excellence EFQM and that it operates balanced according to the fundamental principles of business excellence.

The cover represents the building of new 110 kV distribution line Železniki – Bohinj, which was concluded in 2015.

ELEKTROMARIBOR

ELEKTROCELJE

ELEKTROLJUBLJANA

ELEKTROPRIMORSKA

ELEKTROGORENJSKA

ISO 9001Q-491

ISO 14001E-149

OHSAS 18001H-039

Page 3: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Company profile

Name: ELEKTRO GORENJSKA, podjetje za distribucijo električne energije, d. d.

Abbreviated name: ELEKTRO GORENJSKA, d. d.

Business address: Ulica Mirka Vadnova 3a, 4000 Kranj

Call center: 080 30 19

Fax: 04 20 83 600

Web site: www.elektro-gorenjska.si

E-mail address: [email protected]

Registration number: 5175348000

VAT identification number: SI20389264

Core activity code: 35,130 electricity distribution

Legal form: joint-stock company

Company register entry number: 1/00259/00

Date of company register entry: 27. 1. 1998

Place of court’s register entry: Kranj District Court

Share capital as of 31. 12. 2015: 71,898,060.69 EUR

Number of shares as of 31. 12. 2015:

17,286,376

Chairman of the Board: Bojan Luskovec, M.Sc.

Supervisory board chairman: Samo Logar, M.Sc.

General information

Number of customers connected to distribution network 88,610Number of households 77,515Number of distributed resources 535Sum of distribution of electricity in year 2015 1,042,192,630 kWhConsumption of households in the 2015 328,787,189 kWhAverage consumption per household 4,242 kWh

Basic information of the company dated on December 31 2015.

Page 4: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Consumption of electric power The following pictures present the consumption of the electric power, which is needed for the consumption for inhabitants and for covering losses.

Trend of consumption of electricity in distribution network of Elektro Gorenjska in period 1995 – 2015:

Peak power takeover in 2015: 181.12 MW (Decmber 11th)

Hour chart of consumption on 11th December 2015

Ener

gy [

GW

h]

0

300

600

900

1200

1959

1964

1969

1974

1979

1984

1989

1994

1999

200

4

200

9

2014

2015

Year

Hour

0

20

40

60

80

100

120

140

160

180

200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

total

transmission

solar power plants

hydroelectric power plants

other electric power plants

2015

CONSUMTION OF ELECTRIC POWER kWh

Transmission network 919.247.963

Other distribution networks 8.507

Hydroelectric power plants 119.252.906

Solar power plants 17.972.208

SPTE and other electric power plants 34.257.057

TOTAL 1.090.738.641

Number of distributed resources 535

Hydroelectric power plants 107

Solar power plants 351

SPTE and other electric power plants 77

Consumption of electric power by type of resource in 2015 and the number of distributed resources:

Page 5: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Quantity of electric power consumption by the type of resource in the period 2003 - 2015:

2015

CONSUMTION OF ELECTRIC POWER kWh

Transmission network 919.247.963

Other distribution networks 8.507

Hydroelectric power plants 119.252.906

Solar power plants 17.972.208

SPTE and other electric power plants 34.257.057

TOTAL 1.090.738.641

Number of distributed resources 535

Hydroelectric power plants 107

Solar power plants 351

SPTE and other electric power plants 77

Percentage of electric power consumption by the type of resource in the period 2003 - 2015:

Number of distributed resources in accordance to primary resource in the period 2003 - 2015:

En

erg

y [G

Wh

]

0

1,200

1,000

800

600

400

200

Transmission network

Other distribution networks

Hydroelectric power plants

Solar power plants

Other distribution networks

Year

200

3

200

4

200

5

200

6

200

7

200

8

200

9

2010

2011

2012

2013

2014

2015

Year

Hydroelectric power plantsSolar power plantsSPTE and other electric power plants

0%

25%

50%

75%

100%

200

3

Percentage

200

4

200

5

200

6

200

7

200

8

200

9

2010

2011

2012

2013

2014

2015

Number

Year

Hydroelectric power plantsSolar power plantsSPTE and other electric power plants

0

150

300

450

600

200

3

200

4

200

5

200

6

200

7

200

8

200

9

2010

2011

2012

2013

2014

2015

Page 6: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Reliable supply of electricityReliable supply of electricity is based on careful planning, maintaining existing network and building new network of Elektro Gorenjska.

Presentation of SAIFI and SAIDI in the period 2008 – 2015

SAIFI represents average number of unannounced interruptions longer than 3 minutes per customer.

SAIDI represents average time of duration of unannounced interruptions longer than 3 minutes per customer.

At the pictures are presented long-term unannounced interruptions (longer than 3 minutes)

SAID

I [m

in/c

usto

mer

]

0

20

40

60

80

100

120

140

160

2008 2009 2010 2011 2012 2013 2014 2015 Year

Proper causeForeign influenceForce majeure

Target value for proper cause defined by Agency for energy

SAIF

I [in

ter/

cust

omer

]

Year

0

0.5

1

1.5

2

2.5

3

2008 2009 2010 2011 2012 2013 2014 2015

Proper causeForeign influenceForce majeure

Target value for proper cause defined by Agency for energy

Page 7: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Technical data of distribution transformer stations

Name of object Transformation

(kV/kV)installed capacity

(MVA)RTP Labore 110/20 2 x 40, 1 x 20

RTP Zlato polje 110/20 1 x 20, 1 x 31,5

RTP Primskovo 110/20 2 x 31,5

RTP Medvode 110/20 2 x 20

RTP Škofja Loka 110/20 2 x 40

RTP Tržič 110/20 2 x 20

RTP Železniki 110/20 2 x 20

RTP Radovljica 110/20 2 x 20

RTP Bohinj 110/20 1 x 20

RTP Moste 110/20 2 x 31,5

RTP Jesenice 110/20, 20/35 2 x 20 , 1 x 8

RTP Kranjska Gora 35/20 1 x 8

RTP Sava 20/10 3 x 8

Technical data dated on December 31 2015.

Technical data on electric power distribution network and devices

Object Total

RTP 13

RP 7

TP 1,360

DV 110 kV 102,323 m

DV 35 kV 20,299 m

DV 20 kV 679,240 m

DV 10 kV 0 m

Total power lines 801,862 m

Object Total

Cable conduits 110 kV 3,319 m

Cable conduits 35 kV 158 m

Cable conduits 20 kV 874,101 m

Cable conduits 10 kV 5,694 m

Total cable conduits 883,272 m

Free line LV 590,395 m

Signal cable 22,941 m

Cable conduits LV 2,476,910 m

SKS LV 794,443 m

Total LV network 3,884,689 m

Total network 5,569,823 m

Increase of long distance remote-controlled switches, HV, MV and LV cable conduits presented in percentage in accordance to the total network in the period 2002-2015:

"&

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

48 49 50 52 52 53 55 57 58 59 61 61 63 64 64

2929 30 31 3236

3942 43 45 46 48

5255 56

10 10 1114

20 21 21 23 23 23 23 23 22

Share of long distanceremote –controlled switches

Share of HV and MVcable conduits Share of LV cable conduits

Page 8: Useful information about Elektro Gorenjska Company for ......Presentation of the company Elektro Gorenjska, d. d., is a company for distribution of electricity, which contributes significantly

Additional informationElektro Gorenjska, d. d.Ulica Mirka Vadnova 3a, Kranj

Call center: 080 30 19Fax: 04 20 83 600

www.elektro-gorenjska.si e-mail: [email protected]

OPENING HOURS FOR COSTUMERS: Elektro Gorenjska, d. d.Ulica Mirka Vadnova 3, Kranj

Monday, Tuesday, Thursday: from 7.30 till 14.00 Wednesday: form 7.30 till 16.00,Friday: from 7.30 till 13h.00Telephone number: 04 20 83 146e-mail: [email protected]

Elektro Gorenjska, d. d.Moste 2a, Žirovnica

Monday, Tuesday, Wednesday, Thursday: from 7.30 till 14.00,Friday: from 7.30 till 13h.00Telephone number: 04 20 83 146e-mail: [email protected]