US NextGen / EU SESAR, the 13th Labor of Hercules?
Transcript of US NextGen / EU SESAR, the 13th Labor of Hercules?
US NextGen / EU SESAR,
the 13th Labor of Hercules?
Capt Alban FRANÇOIS, MSc
Belgian Defence
Directorate General Material Resources
E-mail : [email protected]
Summary
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
2
Summary
3
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Belgium
4
3,62010
3,52009
3,32008
3,32007
3,32006
Average C130 abroad per day
3,62010
3,52009
3,32008
3,32007
3,32006
Average C130 abroad per day
BD’s Current Operations
5
Summary
6
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
• 12 C-130H acquired in 1972/1973
– 2 A/C lost:
• 1996 (CH-06) : Crash @ Eindhoven (Netherlands)
• 2006 (CH-02) : Fire @ DLM Facilities (SNT, Brussels)
– 1 former USAF C-130E acquired in 2007
• Upgrade and major overhaul performed
• Delivered by Sabena Technics on Mar 06th
2009
BD C130 Fleet
7
BD C130 Mission
Statement
• To assure permanently the simultaneous use of C-130‟s at MOB, two DOB‟s for prolonged periods & a third DOB for a short period
• Ability to conduct Combined Joint airlift Ops in a multinational or allied coalition environment
• Ability to deploy 8 C-130‟s at once
• Ability to perform a variety of operations
e.g. Engine Running Offload, Aerial delivery,…
8
• Accumulated Fl Hrs – Avg : 19.217 Hrs
– Total : 211.388 Hrs
• Accumulated landings – Avg excl CH-13 : 14.044
– CH-13: estimated at 2.608
(history incomplete)
• Average severity factor: 1,13 (CH-13: 1,9)
Average Equivalent Baseline Hours: 21.715 Hrs
BD C130 Fleet in Figures (Situation mid Sep 11)
9
Summary
10
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Introduction to
US NextGen
• Observation of the FAA: The congestion of
the air transportation system in the US will
increase and, if unaddressed, would cost the
American economy $22 billion annually in lost
of economic activity by 2022.
Solution: The Next Generation Air
Transportation System
• Source and additional information:
http://www.faa.gov/nextgen/ 11
• Scope (in addition to existing RNAV/RNP
requirements):
– Automatic Dependent Surveillance-Broadcast
(ADS-B)
– System Wide Information Management (SWIM)
– Next Gen Data Communications: Controller-Pilot
Datalink Communication (CPDLC)
– Next Gen Network Enabled Weather (NNEW)
– NAS voice switch (NVS)
12
Introduction to
US NextGen
ADS-B
14 Source: FAA
Introduction to
US NextGen
15 Source: FAA
Introduction to
US NextGen
• Context:
– Europe does not have a single sky (managed at the European level).
– European airspace is among the busiest in the world with over 33,000 flights on busy days and high airport density.
• In order to cope this fragmentation and modernize the architecture of the European ATM, the European Commission launched in 2004 the Single European Sky ATM Research (SESAR)
16
Introduction to
EU SESAR
• SESAR is a collaborative project over 30 years and structured in three phases: – a Definition phase (2004–2008) led by
EuroControl (with consortium of stakeholders)
objective: delivery of an ATM master plan
– a Development phase (2008–2013) managed by SESAR Joint Undertaking production of the new technological systems per the ATM master plan
– a Deployment phase (2014–2020) for large-scale implementation of the new ATM infrastructure.
17
Introduction to
EU SESAR
• Source and additional information:
http://ec.europa.eu/transport/air/sesar/sesar_en.
htm and http://www.sesarju.eu/
Introduction to
EU SESAR
US NextGen
Introduction to EU SESAR
Automatic Dependent
Surveillance-Broadcast ADS-B
Next Gen Data
Communications (CPDLC)
Required Navigation
Performance (RNP)
System Wide Information
Management (SWIM)
NAS voice switch (NVS)
Next Gen Network
Enabled Weather (NNEW)
19
and comparison with
US NextGen
20
Introduction to
EU SESAR
Summary
21
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• Required Navigation Performance
• Controller-Pilot Datalink Communication
• Automatic Dependent Surveillance-Broadcast
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Required Navigation
Performance Objective
ATC bust
Source: JetBlue 22
Conventional routes are defined by ground-based NAVAIDS (VOR, TACAN, ADF,…)
Area Navigation (RNAV):
• Allows an aircraft to fly
a specific path between
two points defined 3-
dimensionally (lat – lon –
altitude)
• No need anymore to fly
directly over ground-
based NAVAIDS
• Fundamental
requirement is the
navigation accuracy
23
Precision Area Navigation
(P-RNAV):
• Navigation accuracy
= 1Nm for 95% of time
• Certification per JAA
TGL 10 (Airworthiness
& Operational
approval for P-RNAV)
Required Navigation
Performance Definitions
Required Navigation Performance
(RNP): • Certification requirements
– Navigation accuracy (as RNAV) to desired level
(e.g. 0.3)
– Containment integrity less than 10-5 / FH
– Containment continuity less than 10-4/FH.
– System Availability Receiver Autonomous
Integrity Monitoring (RAIM)
• RNP approaches (RNP APCH) : – are characterized by Navigation Precision ≤
0.3Nm in approach & 1Nm Missed approach
– Certification of aircraft per AMC 20-27
Required Navigation Performance
(RNP):
• RNP Autorisation Required APCH (RNP
AR)
– are characterized by
• Navigation Precision until 0.1Nm approach phase
• Curved flight path (RF-leg) in final (after FAF)
• Protections areas laterally limited to 2xRNP value
without any additional buffer.
– Certification of aircraft per AMC 20-26
Required Navigation
Performance RNAV vs RNP
Greater
Flex w/
30/30 NM
separation
Improved
domestic
remote
ops:/flow
Improved
enroute
ops:/flow
Improved
enroute
transition
ops/flow &
access
Improved
rotorcraft
ops
Improved
efficiency,
access and
airspace
use
Improved
efficiency,
access and
airspace
use
RNP 4 RNP 2 A-RNP B RNP 1 RNP 0.3 RNP APCH RNP AR
•Remote
• 4NM
•AC20-130A
•N8400.33
•GNSS
•RNP Alert
•95% Cont
•ADS
•RVSM
•No FRT
•Enroute/
Remote
•2NM
•AC pending
•GNSS
•Perf alert
•95% Cont
•No/Ltd
surveillance
•VNAV option
•Enroute/
TMA
•0.3 - 2NM
•AC pending
•GNSS
•RNP alert
•95% Cont
•Surveillance
•VNAV, RF
FRT option
•Enroute/
TMA
•1 NM
•AC pending
•GNSS
•RNP alert
•95% Cont
•No/Ltd
surveillance
•VNAV,
option
•No RF
•Enroute/
TMA
•0.3 NM
•AC pending
•GNSS/WAAS
•Perf alert
•Surveillance
•VNAV, option
•RF option
•Approach
•0.3 - 1NM
•AMC 20-27
•GNSS
•Perf alert
•95% RAIM
•VNAV, option
•No RF
•Appr/Dep
•0.1 - 1NM
•AMC 20-26
• AC 90-101A
•GNSS/IRU
•RNP alert
•95% RAIM
•VEB
•VNAV
•RF
Improved
density
10-18 NM
route
spacing
RNAV 5
•Enroute
• 5NM
•AMC20-4
• AC 90-96A
•GNSS
•No Alert
•95% Cont
•RADAR
•RVSM
•Was B-RNAV
Improved
TMA
airspace
utilisation
& flow
RNAV 1/2
•TMA/Enroute
• 1NM
•TGL 10
•AC 90-96A
•GNSS
•No Alert
•95% Cont
•RADAR
•Was P-RNAV &
US RNAV
•VNAV option
Improved
Ops &
benefits w/
50 NM route
separartion
RNAV 10
•Oceanic
• 10NM
•AC 20-130A
•N8400.12A
•IRU, GNSS
•No Alert
•95% Cont
•Procedural
•RVSM
•Was RNP 10
RNAV SPECIFICATION RNP SPECIFICATION
ICAO Doc 9613 PBN Manual
25
Constant Descend
Angle = efficient fuel consumption = noise reduction
Lower minima’s
Ground systems
dependent
26
Required Navigation
Performance Benefits
JFK
Visual/VOR
vs.
RNP
JFK
Descent Profile View
• Globally: Manage the limited sky more wisely, i.e. – Increased safety (confidence in accuracy of position)
– Shorter routes
reduced time
– Constant descent angle
= Cte power settings
noise reduction
Environment: less fuel
consumption (and CO2
emission)
– Increased capacity
Required Navigation
Performance Benefits
27
• Military spin-offs: – Accuracy and RAIM:
– Controlled Flight into Terrain
Concealment in valley (even in IMC and NVG conditions)
– IMC airdrops
– Increased capacity: design of multiple autonomous FMS approaches and departures
pseudorandom landings and take-off
Required Navigation
Performance Benefits
28
Summary
29
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• Required Navigation Performance
• Controller-Pilot Datalink Communication
• Automatic Dependent Surveillance-Broadcast
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Controller-Pilot Datalink
Communication (CPDLC)
• Background:
– number of flights
pilots on same freq
risk of override
saturation of frequency
– Misunderstanding of voice communication
• Solution: CPLDC
– Scope: ATC communication through ACARS
30
Summary
31
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• Required Navigation Performance
• Controller-Pilot Datalink Communication
• Automatic Dependent Surveillance-Broadcast
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Automatic Dependent
Surveillance-Broadcast
(ADS-B)
• Scope: Pilots and ATC see the whole real-time display of air traffic based on GPS-position sent through aircraft transponders.
• Civilian „Link-16‟ equivalent
Situational Awareness & safety enhancer
32
Summary
33
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
BD Modification Policy
• Reason for modification:
– Mission statement and operational need
– Technico-logistical need (obsolescence)
– Evolution of the CNS/ATM regulations
• Principles
– Choice of implementation based on trade-off between operational benefit and cost
– Follow as much as possible civilian (EASA, FAA) and military (NATO) regulations
– COTS > MOTS > BD Specific
– Certification based on civilian requirements 34
Summary
35
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Introduction to the
BD C-130 Avionics
1996: Integration of Honeywell's Integrated Vehicle Mission
Management System (IVMMS)
Control Display
Unit
Electronic Flight
Instrument System
Pilot
Control Display
Unit
Electronic Flight
Instrument System
Copilot
Integrated: single control & display
System
Processor 1
System
Processor 2
Flight
Management
System
Communication
Management
Electronic Warfare
Automatic Flight
Control System
Navigation
sensors
1 GPS
1 INS
2 VOR
2 TACAN
2 ADF
2 AHRS
2 ADSU
2 HF
2 VHF-UHF
1 UHF
Navigation Database
Surveillance 1 Weather Radar
1 Radar-Altimeter
2 IFF
Mil Ops VUHF - DF
1 AAR-44
1 ALE-40
36
Introduction to the
BD C-130 Avionics
Major avionics evolutions post-IVMMS
Control Display
Unit
Electronic Flight
Instrument System
Pilot
Control Display
Unit
Electronic Flight
Instrument System
Copilot
Integrated: single control & display
System
Processor 1
System
Processor 2
Flight
Management
System
Communication
Management
Electronic Warfare
Automatic Flight
Control System
Navigation
sensors
1 GPS
1 INS
2 VOR
2 TACAN
2 ADF
2 AHRS
2 ADSU
2 HF
2 VHF-UHF
1 UHF
Navigation Database
Surveillance 1 Weather Radar
1 Radar-Altimeter
2 IFF
Mil Ops VUHF - DF
1 AAR-44
1 ALE-40
37
+ FDR
CVR
TCAS
+ Engine
Instrument Display
System (EIDS)
+ ACARS
SATCOM
+ ESI
ACMDS
+ RWR
Software Evolutions
Introduction to the
BD C-130 Avionics
• Observation in 2003:
– CDU‟s are obsoletes since 2000
– SP CPU & compiler are no longer supported and lack of computing power (ADA) to sustain needed S/W evolutions
– Navigation subsystem is not compliant anymore with regulations (P-RNAV)
• Requirements for IVMMS Maintenance Plan (IMP)
– General: Need to support BD C-130 operations up to 2020 according to the existing mission statement
Integration of
Introduction to the
BD C-130 Avionics
• Requirements for IVMMS Maintenance Plan (IMP)
– General: Need to support BD C-130 operations up to 2020 according to the existing mission statement
– Scope:
39
CDU
MCDU
System
Processor
New I/O
CCA
New CPU
CCA
Production Line
FMS Software
IFF
ACARS
EIDS
1 GPS 1 INU
2 EGI
EGPWS
MFRD
+
BD C-130 Cockpit
Evolutions 1996-2011
A/P - F/D Ctls PFI - EFIS St-by Fl Instr. Comms & TAC TCAS EW 40
IVMMS Maintenance Plan Program Organization
Tybrin Barco Meggitt
Honeywell
Adaptive
Aerospace
Lockheed
Martin Sogerma Derco
Sabena
Technics
Belgian
Defence
Purchase B-kits
S/W Development
Aircraft
Integration
Mission
Sp Tool
FDAU
retrofit MCDU
Engineering Doc update
41
Summary
42
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
• RNP APCH or RNP AR?
– BD C-130 IMP can (nearly) handle all functionalities
required by RNP AR
– RNP APCH < RNP AR
RNP AR is a 1 time bigger effort for certification
but enables all functionalities (benefit vs cost)
BD C-130 Capabilities &
Certification Process Required Navigation Performance
43
0,3 NM
0,3 NM
CentreLine
RNP Limit
Containment Limit
RNP Limit
Containment Limit
Primary Area
0,5 NM
Secundary Area
0,3 NM
Secundary Area
0,3 NM
0,3 NM
RNP AR
• Certification AMC 20-26
– Certification of aircraft:
• Accuracy / Integrity / Continuity / Availability
• Functional criteria's
– Adaptation of procedures
– Crew Training
– Approach failures follow-up procedure
– Navigation Database validation process
• Need support of OEM
• Failure to meet specific functional criteria
can be mitigated through adaptation of
procedures & training
Need Flight Operational Safety
Assesment (FOSA)
BD C-130 Capabilities &
Certification Process Required Navigation Performance
44
DGPS-flight
@ Marshall Aerospace
29 Apr 2010
Certification in finalization for BD C-130 IMP
• Requirement for State aircraft:
• Only for transport type aircraft flying in IFR/GAT above FL285
• Applies only to new aircraft entering into service after 01 Jan 2014
Not mandatory on C-130 BD maintenance policy: implementation only if cost beneficial.
• With the integration of the ACARS onto the IVMMS within IMP, the BD C-130 should be CPDLC compliant
45
BD C-130 Capabilities &
Certification Process CPDLC
• Certification
– Test flight performed with CH-09 on 10 Feb 2011
• Successful logged on to the Maastricht-UAC
CPDLC infrastructure, when still being on the
apron.
• During the flight, uplink clearances and downlink
requests were successfully exchanged between the
crew and ATCO's at Maastricht involving both the
Hannover and DECO Sectors Groups.
Eurocontrol: 46
BD C-130 Capabilities &
Certification Process CPDLC
• CPDLC – Certification (cont‟d)
– Begin May 2011: Trans-oceanic flight with CH-09:
– Gander:
– Shanwick: issues with SITA
The Belgian Air Force is the first Air Force being
CPDLC equipped at Maastricht-UAC
• ADS-B
– BD C-130 IMP will be ADS-B Out capable after
installation of APX-119
– ADS-B In capacity still to be determined 47
BD C-130 Capabilities &
Certification Process CPDLC & ADS-B
Summary
48
• Belgium & the Belgian Defence (BD)
• BD C130 fleet: Mission & Figures
• Introduction to US NextGen / EU SESAR
• BD modification policy
• Introduction to the BD C-130 Avionics
• BD C-130 capabilities and certification process
• Conclusion
Conclusions
• Aging Fleet (40 years old) but state of the art Avionics conform civilian and military regulations
• Installation of new functionality is trade-off between operational benefit and cost
Example for RNP: choice between
– certification investment (material was already available (P-RNAV requirement for IMP))
– “see and avoid” operations in mountainous area‟s (as Kabul) in Night IMC conditions
• BD C130 Fleet fits the operational needs 49
Conclusion Hercules Labors
• To kill the Nemean lion
• To destroy the Lernaean Hydra
• To capture Ceryneian Hind alive
• To trap the Erymanthian boar
• To clean the Augean stables
• To get rid of the Stymphalian birds
• To capture the Cretan bull
• To round up the Mares of Diomedes
• To fetch Hippolyte's girdle, or belt
• To fetch the cattle of Geryon
• To fetch the golden apples of the Hesperides
• To bring Cerberus from Tartarus
• To fly in the US Next Gen and Single EU Sky: with RNP AR capability, with CPDLC and with ADS-Out (and –In).
50
Q & A
Belgian Defence C130
Operated and Maintained With Tenacity