US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports for for
DummiesDummies
July 2006
2
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
• What is this session meant to cover?
– Introduction into the use of “Contract Groups” from the RMS program.
– Creation of meaningful reports that are tailored for the projects, offices, fund types, customers, etc., of the person desiring the reports.
– Use of a tool to help manage and improve project delivery & contract management
3
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Contract Groups are accessed from the RMS button “Summary” listing.
You can only create groups from the office your have such privileges granted.
4
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Selecting the “Add” button presents the choice of creating groups by “Manually” selecting contracts, or by using a “Formula” to create the group.
When given the choice, it is ALWAYS BETTER to use the “Formula” method.
We will begin by reviewing the “Manual” method first.
5
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Begin by adding a Title for your group. It can be based on geographical location, office, customer type, fund type, Project Manager, Inspector, or what ever your need may be.
Under the description, you should provide a narrative to explain the intent of the report so others will understand it. (Anybody can use your group for their own purposes.)
On the “Contract Selection” tab, select desired contracts to be included in your Group.
6
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
From the “View Selected Contracts” tab or the “Contracts” button, you may see all contracts you have selected. Contracts can be chosen for any office to be in your group.
7
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
After closing out the prior screen, we will use the newly created “Group” to get our reports.
The “Reports” button is available throughout most RMS screens.
8
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
From the Report Menu, select “Summary” to gain access to the Summary Report listing. These reports are intended to give you information on multiple projects, without having to ‘drill-down’ to the individual project.
Choose the “Status of Construction” report on the menu.
9
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Using the “Status of Construction” report for demonstration, click on the radial button to select our newly created GROUP.
You may include or exclude any of the items under “Include”.
The “Sort” feature presents seven sort capabilities. We’ve chosen “Office”.
After your selections are completed, push the “Preview” button at the top of the window.
10
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
This screen presents the Groups from which you may select. Choose the office you want to use the group from (Gulf Region Division), then the available groups will appear in the area below the office name.
Our newly created group is highlighted. Press the “OK” button for the report to be generated.
11
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Manually selected project report using “Contract Groups”
US Army Corpsof Engineers
Status Of Construction1MEF PROGRAM OFFICE including Sub-Offices
16 Apr 2005
GULF REGION CENTRAL DISTRICT
RANGE: Road Projects f or 1MEF Program Of f ice
Contract No. ContractorContract Title
Program Ty pe
Scheduled BOD
Original Completionwith Options
Current ContractRequired Completion
% TimeGrowth
Original Contract with Options
Current ContractAmount
% CostGrowth
Sched ActualRemarks
Progress
1MEF PROGRAM OFFICEN62470-00-D-0005 0050 KBRTR/TR-002 ANBAR VILLAGE ROADS SEGMENT 05
IRAQNot Scheduled
08 Feb 0508 Feb 05
0.0%$603,030.00$603,030.00
0.0% 67% 60%Status as of 01/28/2005SEGMENT 5 - AL ANGOUR REFINERY TO AL ANGOUR3 KM IN LENGTHSEG 05 Al Gour Ref inery to Al Angour
N62470-00-D-0005 0050 KBRTR/TR-002 ANBAR VILLAGE ROADS SEGMENT 04
IRAQNot Scheduled
08 Feb 0508 Feb 05
0.0%$503,055.00$503,055.00
0.0% 84% 50%Status as of 01/28/2005
SEG 4 - AL RAMADI TO AL HAMEER (3KM)
N62470-04-C-4722 0050 KBRTR/TR-002 ANBAR VILLAGE ROADS SEGMENT 01
IRAQNot Scheduled
10 Mar 0510 Mar 05
0.0%$880,000.00$880,000.00
0.0% 63% 50%Status as of 01/28/2005
SEG 1-AL SHAJARIYAH TO AL SHAHID/AL SABAGH (5KM)
Page 1 of 1
12
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Now, selecting the “Add” button we will review the “Formula” method of creatingReports.
13
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Add a “Title” for the group (MNSTC-I Contracts in CEGRD)
Enter a sort description of the purpose and sort of the report.
14
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Push “Add” to begin –
Choose “Contract – Customer Type” from the selection list. And push “OK”.
15
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Select the Customer Type (Multi-Nat. Sec. Trng Cmd - Iraq) and push “OK”
16
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
The window is then populated with the formula with a description of the selection in the window below.
You can add more criteria too!
17
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
From “View Selected Contracts” tab, you select the offices (sub-offices) to include in the criteria and the contracts meeting the formula conditions will appear. You can also see a report of the selected contracts by pushing the Contracts button at the top of the window.
18
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
From the Report Menu, select “Summary” to gain access to the Summary Report listing.
Once again, choose the “Status of Construction” report on the menu.
19
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Continuing with using the “Status of Construction” report for demonstration, click on the radial button to select our newly created GROUP.
You may include or exclude any of the items under “Include”.
The “Sort” feature presents several sort capabilities. We’ve chosen “Customer”.
After your selections are completed, push the “Preview” button at the top of the window.
20
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
This screen presents the Groups from which you may select. Choose the office you want to use the group from (Gulf Region Division), then the available groups will appear in the area below the office name.
Our newly created group is highlighted. Press the “OK” button for the report to be generated.
21
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
US Army Corpsof Engineers
Status Of ConstructionGULF REGION DIVISION including Sub-Offices
16 Apr 2005
GULF REGION CENTRAL DISTRICT
RANGE: MNSTC-I Contracts in CEGRD Sorted by Customer
Contract No. Of f iceContract Title
Program Ty pe
Scheduled BOD
Original Completionwith Options
Current ContractRequired Completion
% TimeGrowth
Original Contract with Options
Current ContractAmount
% CostGrowth
Sched ActualRemarks
Progress
Multi-Nat. Sec. Trng Cmd - IraqP0004110 CEGRC-1CAVSM//Baghdad Fleet Maintenance Facility
IRAQ23 Jun 05
23 Jun 0523 Jun 05
0.0%$0.00$0.00
0.0% 8% 0%Status as of 01/02/2005
Project is on hold.
W914NS-04-D-0009 0016 CEGRC-1CAVSA/SJ-001 NATION FIRE/CIV DEF ACADEMY
IRAQ16 Jan 06
23 Jun 0623 Jun 06
0.0%$25,383,457.00$25,383,457.00
0.0% 7% 0%Status as of 01/31/2005
FA8903-04-D-8690 0005 CEGRC-1CAV-1BCTSM/BLSM-008 Ar Rustamiy ah Mili Academy
IRAQ16 Apr 05
28 Aug 0430 Nov 04
76.4%$36,314,427.00$59,314,427.00
63.3% 100% 92%Status as of 01/28/2005
Mod 2 pending f or additional renov ations.
P0003808 CEGRC-1CAV-2BCTSM/SM-599/IRAQ HW PATROL HQ
IRAQ25 Nov 05
25 Nov 0525 Nov 05
0.0%$0.00$0.00
0.0% 8% 0%Status as of 01/30/2005
Scheduleing Pre-bid site v isit, security concerns related to site v isit
W914NS-04-D-0009 0002 CEGRC-1CAV-2BCTSM/SJ003/Civ il Def ense Headquarters
IRAQ05 Mar 05
31 Jan 0531 Jan 05
0.0%$1,354,583.00$1,354,583.00
0.0% 91% 84%Status as of 01/30/2005
Ov erall BOD date is scheduled f or 3/05/2005
W916QW-05-D-0012 0002 CEGRC-1CAV-2BCTSM/SM-543/PUB ORD BATT-FOB JUSTICE
IRAQ25 Jun 05
29 Jun 0529 Jun 05
0.0%$0.00$0.00
0.0% 9% 4%Status as of 01/30/2005
01/30/05 MOD in progress f or Force Protection, $1.6 mil.
FA8903-04-D-8669 0005 CEGRC-1CAV-39BCSM/SM009/Tadji Army Av iation Base PhIV
IRAQ01 Nov 04
01 Nov 0401 Nov 04
0.0%$26,163,560.00$26,163,560.00
0.0% 100% 98%Status as of 01/28/2005
FA8903-04-D-8675 0001 CEGRC-1CAV-39BCSM/MI000-101/Taji Military Base Ph III
IRAQ01 Sep 04 A
15 Jan 0515 Jan 05
$33,861,491.00 Status as of 01/28/2005
FA8903-04-D-8677 0020 CEGRC-1CAV-39BCSC/ Taji Med. Clinics(2), const./Equip
IRAQNot Scheduled
03 Jan 0503 Jan 05
Status as of 01/28/2005
W914NS-04-D-0009 0015 CEGRC-1CAV-39BCSM/Taji S. Road, Vehic, Fence(SM-015...)
IRAQ31 May 05
11 Aug 0411 Aug 04
Status as of 01/28/2005
W916QW-04-D-0014 NA CEGRC-1CAV-39BCSM/SM-535/Fac. Prot. Serv . HQ & ACADEMY
IRAQ09 Dec 05
09 Dec 0509 Dec 05
Status as of 01/28/2005
Stop Work Order issued by Contracting Of f icer
W916QW-05-P-0005 NA CEGRC-1CAV-39BCSM/SM-528/ FORCE PROT. ENHANCE. & GENER
IRAQ26 Jan 05 A
09 Feb 0509 Feb 05
Status as of 01/28/2005
Modif ication f or additional work is underway .
W917BG-05-C-0009 NA CEGRC-1CAV-39BCSM/SM-651/FIRING RANGE @ TADJI
IRAQ08 Mar 05
27 Feb 0527 Feb 05
Status as of 01/28/2005
FA8903-04-D-8690 0002 CEGRC-1CAV-3BCTSM/SM010/Iraqi Ministry of Def ense HQ
IRAQ12 Feb 05
30 Apr 0530 Apr 05
Status as of 01/31/2005
waiting f or next round of pre-f inal ispections.
W914NS-05-C-9008 NA CEGRC-1CAV-PROGSP/SJ089/ FP f or Major Crimes Unit
IRAQ13 May 05
01 Apr 0501 Apr 05
Status as of 11/15/2004
CONTRACTED / WORK TO BEGIN
CANCELLED NA CEGRC-ZSR/SJ-057 JORDAN BORDER RD SECTION "B"
IRAQNot Scheduled
Status as of 01/16/2005
APPROXIMATELY 170 (KM) GRAVEL ROAD
Page 1 of 14
RMS ReportsRMS Reports
Formula selected project report using “Contract Groups”
22
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Key Summary reports
1. Status of Construction Report 2. Construction Placement Summary3. System Milestone Schedule4. QA/QC Daily Narratives5. USACE Construction CCG Metrics
23
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS ReportsCustom Reports
Custom Reports can be easily created from the Summary module of RMS. These reports are created to address special desires or needs that you or your Customer may have.
24
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS ReportsCustom Reports
Chapter 1 of the RMS User Guide gives a step-by-step process where you can manually add a new Custom Report or Copy an existing Custom Report. These reports utilize data fields directly from the RMS database and can be added to the Summary Level of reporting within RMS.
25
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS ReportsCustom Reports
This is a sample of data available for you to create Custom Reports.
The data elements are from these headings:
•Administration•Finances•QA/QC•Submittals•Schedules
26
US Army CorpsUS Army Corpsof Engineersof Engineers
RMS Center – Apple Valley, CA
RMS ReportsRMS Reports
Sample Custom Reports
US Army Corpsof Engineers
Customer - Status ReportTHI QAR RESIDENT OFFICE including Sub-Offices
21 Feb 2005
GULF REGION SOUTHERN DISTRICT
RANGE: Activ e Contracts Sorted by Of f ice
Contract No. ContractorContract Title
Administrativ e Contracting Of f icerQA Project Engineer Name
Chief Con-Rep
Contract Administration Of f ice
Paid Percent
Reported Percent
Scheduled Percent
Award CLINS
Current CLINSSum of activ ities Current contract v alue
Cost Growth
Time Growth
BOD - Original DateBOD - Scheduled Date
Required Completion DatePrimary Delay Code
Financial and Schedule Status
THI QAR RESIDENT OFFICE
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1801153: QANADEELCEGRS-TAO-TQR
0
0
0
73831
7383173831 $73,831.00
$0.00
0 02/21/2005
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1801176: SAIF ALLCEGRS-TAO-TQR
0
0
0
69101
6910169101 $69,101.00
$0.00
0 02/18/2005
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1800010: BADIR AL
0
041142
41142 $41,142.00$0.00
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1800849: SHAHAMA
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1801234: QATER AL
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1801169: IBN AL-N
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1801213: BUTHAINA
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1800772: ATFAL AL
FA8903-04-D-8672 0011 ECC
BE-002 THI-QAR SCHOOL 1800740: AHIL AL-
Page 1 of 10