US Army Corps of Engineers
PLANNING SMARTBUILDING STRONG®
Planning for Non-Routine Activities
Maria Wegner-Johnson
Headquarters USACE
Planning Community of Practice
12 May 2012
PLANNING SMARTBUILDING STRONG®
Inspections(Routine)(Periodic)(Special)
Incident or inspection
finding triggers formal LSAC
review?
Interim Risk Reduction Measures
LSAC I, II, III, & IV levees?
Levee Safety Risk Management Study
No
Implement Risk Reduction & Risk
Management Measures
Reassess Risk & Revise LSAC
LSAC I, II, III, & IV
Routine O&M, Monitoring, &
Incident Reporting
Yes
All Levees
Risk Assessment to Confirm LSAC
Plan Non-routine Activities
LSAC I, II, & III
Yes
All Levees
No
No
Yes
Assign LSAC class informed by available risk assessment and other
levee information.Screening
Proceed to Recon Phase?
National Levee
Database
Communicate Levee Inundation Risk(LSAC and overtopping w/o breach)
ReconYesProceed to Study Phase?
No
Yes
The PortfolioRisk Management Process
Plan Non-Routine Activities
PLANNING SMARTBUILDING STRONG®
Plan Non-Routine Activities
Communicating the LSAC Risk Assessment to Confirm LSAC Plan Interim Risk Reduction Measures
(IRRM) Implement a Strategic Risk Management
Plan Levee Safety Studies
PLANNING SMARTBUILDING STRONG®
Risk Assessment to Confirm LSAC
Uses existing data to establish base condition of levee, including potential failure modes analysis
No additional data is collected
Developed jointly by the District, Risk Cadre, Risk Management Center (RMC), & Sponsor
4
PLANNING SMARTBUILDING STRONG®
Inspections(Routine)(Periodic)(Special)
Incident or inspection
finding triggers formal LSAC
review?
Interim Risk Reduction Measures
LSAC I, II, III, & IV levees?
Levee Safety Risk Management Study
No
Implement Risk Reduction & Risk
Management Measures
Reassess Risk & Revise LSAC
LSAC I, II, III, & IV
Routine O&M, Monitoring, &
Incident Reporting
Yes
All Levees
Risk Assessment to Confirm LSAC
Plan Non-routine Activities
LSAC I, II, & III
Yes
All Levees
No
No
Yes
Assign LSAC class informed by available risk assessment and other
levee information.Screening
Proceed to Recon Phase?
National Levee
Database
Communicate Levee Inundation Risk(LSAC and overtopping w/o breach)
ReconYesProceed to Study Phase?
No
Yes
The PortfolioRisk Management Process
What is not said in here?
PLANNING SMARTBUILDING STRONG®
What’s Missing Section 206 of 1960 FCA
►Flood Plain Management Services (FPMS)►Flood plain information and technical services►Emphasis on non-structural activities
Section 22 of WRDA 1974, as amended►Planning Assistance to States (PAS)►Technical Assistance►Cost Shared 50%/50%
PL 84-99
PLANNING SMARTBUILDING STRONG®
Inspections(Routine)(Periodic)(Special)
Incident or inspection
finding triggers formal LSAC
review?
Interim Risk Reduction Measures
LSAC I, II, III, & IV levees?
Levee Safety Risk Management Study
No
Implement Risk Reduction & Risk
Management Measures
Reassess Risk & Revise LSAC
LSAC I, II, III, & IV
Routine O&M, Monitoring, &
Incident Reporting
Yes
All Levees
Risk Assessment to Confirm LSAC
Plan Non-routine Activities
LSAC I, II, & III
Yes
All Levees
No
No
Yes
Assign LSAC class informed by available risk assessment and other
levee information.Screening
Proceed to Recon Phase?
National Levee
Database
Communicate Levee Inundation Risk(LSAC and overtopping w/o breach)
ReconYesProceed to Study Phase?
No
Yes
Levee Safety Risk Management Studies
PLANNING SMARTBUILDING STRONG®
Authorities
USACE O&M Levee Systems► Major Rehabilitation program; USACE authority to study and
budget for action/construction
Federally Authorized, Local O&M Levee Systems► Study Authority under Section 216 ‘Modifications to Existing
Projects’ ► Requires cost sharing for feasibility study► Congress must authorize modifications and appropriate funding
PLANNING SMARTBUILDING STRONG®
Levee Safety Risk Management Study Objective
►Reduce inundation risks – life safety, economic, environmental
Process►Reconnaissance Phase►Feasibility Phase►Following the planning process
9
PLANNING SMARTBUILDING STRONG®
Malfunction of Levee System Components
Overtopping with Breach
Breach Prior to Overtopping
Overtopping Without Breach
Inundation Scenarios
10
PLANNING SMARTBUILDING STRONG®
Without Further Adieu
Ceil Strauss, CFM►Minnesota Department of Natural Resources