US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation

Transcript of US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of...

Page 1: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

US Army Corps of Engineers

BUILDING STRONG®

Steve MartinEnvironmental Planner

Permanence of Compensatory Mitigation

Page 2: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Compensatory mitigation for 404 (CWA) permits is governed by joint Corps-EPA mitigation

regulations

AKA “Mitigation Rule”

Page 3: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Major Themes of the Rule Sustainable compensatory mitigation

Equivalent standards for all types of mitigation

Use of best available science

Predictable and efficient processes

Expanded public participation

Page 4: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Mitigation Plan Components 1. Objectives 2. Site protection instrument3. Baseline information4. Work plan 5. Maintenance plan6. Performance standards7. Monitoring requirements8. Financial assurances9. Site selection factors10. Credit determination11. Long-term management plan12. Adaptive management plan

Page 5: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Basic requirement for site protection

“…mitigation project must be provided

long-term protection through real

estate instruments or other available

mechanisms, as appropriate.”

33 CFR 332.7(a)(1)

Page 6: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Site protection may be provided through:

Conservation easements

Other restrictive covenants

Title transfer

Multiple party agreements

Conservation Land Use Agreements

Federal facility management plans/integrated natural resources management plans

Page 7: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Why long term management?

Mitigation should be self-sustaining but management may be needed to meet objectives

Ensure sustainable mitigation after performance standards are met

Page 8: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Examples of LTM Activities

Fencing Signs Maintain structures Inventories Inspection Species management Protect from encroachment

Page 9: US Army Corps of Engineers BUILDING STRONG ® Steve Martin Environmental Planner Permanence of Compensatory Mitigation.

BUILDING STRONG®

Questions?

Steve [email protected]

(757) 201-7787