US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources...
-
Upload
joella-bennett -
Category
Documents
-
view
216 -
download
2
Transcript of US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources...
![Page 1: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/1.jpg)
US Army Corps of Engineers
BUILDING STRONG®
Developing & Maintaining OurWater Resources Infrastructure:Today & in the Future
Presentation toNational Waterways Conference
Gary LoewChief, Civil Works Programs
Integration Division
U.S. Army Corps of Engineers
24 September 2009
![Page 2: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/2.jpg)
BUILDING STRONG® 3
Civil Works Business Programs
Shore ProtectionShore Protection
•4,263 sites at 423 4,263 sites at 423 projectsprojects•353 M visits/year353 M visits/year•$18 B to local $18 B to local economieseconomies
•132 projects in 26 States132 projects in 26 States•18% of Nation’s 18% of Nation’s household needshousehold needs•Supply to Wash. DC area Supply to Wash. DC area since 1850’ssince 1850’s
•75 projects, 21,747 MW 75 projects, 21,747 MW capacitycapacity•3% of total US electric 3% of total US electric energyenergy•$800M in power sales$800M in power sales
•12000 mi. inland waterway12000 mi. inland waterway•926 harbors926 harbors•2.6 M tons of commerce/ 2.6 M tons of commerce/ yearyear•204 M cubic yards 204 M cubic yards dredged/yeardredged/year
•383 reservoirs383 reservoirs•~11,75 miles of levee~11,75 miles of levee•Prevent >$6 in damage for Prevent >$6 in damage for every $1 investedevery $1 invested
Flood RiskManagement
EnvironmentalRestoration
• WRDA 86 Sec 1135• Sec 206 Aquatic
Ecosystems• Everglades• Coastal Louisiana
Regulation ofRegulation ofWaterwaysWaterways& Wetlands& Wetlands
•Sec 10, River & Harbor Act 1899•Sec. 404, Clean Water Act 1972•About 43,500 permit cases processed/year
EmergencyEmergencyManagementManagement
• P.L. 84-99 Flood Fighting
• Support to FEMA• Lead Fed. Agency for
Public Works & Engineering
![Page 3: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/3.jpg)
BUILDING STRONG® 4
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
$ M
illio
ns
Civil Works Program Overview
Non-Federal Cost Sharing
Operation & Maintenance
Construction
Support for Others
( Reimbursable )
Expenses
FUSRAP
Flood ControlMiss. R. & Tribs.
Investigations
Flood &Coastal
Emergencies &
Regulatory
ARRA Funds
![Page 4: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/4.jpg)
BUILDING STRONG® 5
Budgets & AppropriationsFY06 FY07 FY08 FY09
$ Millions
Investigations 95 94 90 91Operation & Maintenance 1,979 2,258 2,471 2,475Construction 1,637 1,555 1,523 1,402Mississippi River & Tribs. 270 278 260 240Regulatory Program 160 173 180 180 Flood & Coastal Emergencies 70 81 40 40F.U.S.R.A.P. 140 140 140 140Expenses 162 164 177 177ASA(CW) 0 0 0 6Total Budget Request 4,513 4,743 4,881 4,751Appropriation 5,329 5,340 5,592 5,403Increase from Budget +816 +597 +711 +652
![Page 5: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/5.jpg)
BUILDING STRONG® 6
Eight FY05-09 Emergency Supplementals
Appropriation $ Millions Katrina Other
DisastersP.L. 109-62 (FY 05) 400
P.L. 109-148 (FY 06) 2,144 756
P.L. 109-234 (FY 06) 3,651 34
P.L. 110-28 (FY 07) 1,325 283
P.L. 110-252 (FY 08) 1 605
P.L. 110-329 (FY 08) 1,500 1,277
P.L. 110-252 (FY 09) 5,761
P.L. 111-32 (FY 09) 439 358
Subtotal 15,222 3,313
Grand Total 18,535
![Page 6: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/6.jpg)
BUILDING STRONG® 7
Budgets and Appropriations
*
FY08 FY09 FY10 FY10 FY10 FY10Approp. Approp. Budget House Senate Conf.
Investigations 167 168 100 142 170Operation & Maint. 2,244 2,202 2,504 2,511 2,450Construction 2,289 2,142 1,718 2,144 1,924Mississippi River & Tribs. 387 384 248 251 352Regulatory Program 180 183 190 192 190Flood Cont. & Coastal Emerg. 0 0 41 0 0F.U.S.R.A.P. 140 140 134 134 140Expenses 177 179 184 152 186ASA(CW) 5 4 6 6 6Total Regular 5,597 5,361 5,125 5,532 5,405Supplemental Appns 3,383 6,558Stimulus Bill 4,600Defense Supplemental 842Total 8,980 17,362
![Page 7: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/7.jpg)
BUILDING STRONG® 8
FY09 Accomplishments• NAVIGATION
– Maintained 25,000 miles of navigation channels– Transported 95% of Nation’s overseas foreign
commerce (2.2 B tons)– Maintained 241 lock chambers at 196 sites– Dredged and disposed of 211 M cubic yards– Completed 6 L&D projects– Funded 5 L&D major rehabs to completion
• FLOOD RISK MANAGEMENT– Prevented $18.5 billion in flood losses annually for
past 5 years– An average return of 6:1 on flood damage reduction
projects– Implemented Dam & Levee Safety Programs
• WATER SUPPLY – Provided 11.1 mil acre-feet of water supply storage
space at 132 projects in 26 states – 18% of Nation’s personal household needs– Returned $22 mil to U.S. Treasury
• ECOSYSTEM RESTORATION– Assisted with recovery of 53
species at 133 projects – Restored 10,000 acres of habitat– 13% of habitat is nationally
significant
• FUSRAP– Excavated 115,600 cubic yards of
contaminated material – Returned 12 properties to
communities
![Page 8: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/8.jpg)
BUILDING STRONG® 9
• CONSTRUCTION COMPLETIONS– Placed 8 projects into service; 70 since 2001
• REGULATORY– Processed 43,213 permits in average time under
60 days– 6,074 individual permits in average 264 days– 31,698 general permits in average of 35 days– Replaced 18,800 acres of permanent impact with
36,000 acres of permittee responsible mitigation
• RECREATION– Hosted 353 million visitor-days at Corps projects– Supported 100 mil fishing, 9 mil hunting & 63 mil
wildlife watching visits at Corps projects– 1,885 recreation sites (42%) operated by others
• EMERGENCY RESPONSE– Responded to 12 FEMA disasters in 20 States +
Midwest Floods
More FY09 Accomplishments
• HYDROPOWER– Operated 75 Corps plants– 67 NonFed Plants on Corps sites– 75 billion kilowatt-hours– 14% of personal household energy
requirements– ~$800 million repaid to Treasury– Completed rehab of two
powerhouses in Georgia & Alabama
![Page 9: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/9.jpg)
BUILDING STRONG® 10
FY10 Civil Works Budget • Supports President’s
Overall Budget Priorities:– Encouraging Economic
Growth – Investing in the Future– Building a High
Performance Government
![Page 10: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/10.jpg)
BUILDING STRONG® 11
FY10 Budget by Business LineBusiness Line FY09 Budget ($000)
Navigation $1,766,000
Flood Risk Management 1,628,000
Environment 546,000
Hydropower 230,000
Recreation 283,000
Emergency Management 55,000
Regulatory 190,000
Water Supply 4,000
Management & Oversight 184,000
Total $5,125,000
Support For Others $4,000,000
![Page 11: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/11.jpg)
BUILDING STRONG® 12
Budget Arithmetic – FY10Civil Works Budget Ceiling $5,125 mil
Allocate GE, Reg., FCCE, Rec., FUSRAP… - 900Allocate Base O&M (~75% of required) - 1,900Essential Dam Safety - 500Assign National Priorities - 500Continuing Construction at Base Level - 700Planning Studies - 100Minimum Essential Allocation = - $4,600
Left for all other CW Projects & Programs ~$525 mil*Use the $525 mil to restore project O&M to prior year levels
THAT’S IT!
![Page 12: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/12.jpg)
BUILDING STRONG® 13
13
American Recovery and Reinvestment Act (ARRA) of 2009
$ 4.6 BIL to USACE Civil WorksACCOUNTS
Operation & Maintenance (O&M) - $2.075 BIL
Construction (C) - $ 2.0 BIL
Mississippi River & Tributaries - $ 375 MIL
FUSRAP - $ 100 MIL
Investigations - $ 25 MIL
Regulatory - $ 25 MIL
BUSINESS LINES
Navigation - $ 1.7 BIL
Flood Risk Management - $ 1.4 BIL
Environment - $ 400 MIL
Hydropower - $ 300 MIL
Recreation - $ 300 MIL
Environmental Restoration - $ 200 MIL
Contaminated Sites Cleanup - $ 100 MIL
Other / Not Yet Allocated - $ 100 MIL
![Page 13: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/13.jpg)
BUILDING STRONG® 14
30
91
4444
365858
45
Flood Risk Management
Aquatic Ecosystem Restoration
Navigation
Tuttle Creek Lake
MonongahelaR. Locks 2,3,4
Lockport Lock 8989
Sims Bayou
Houston-GalvestonChannels
Rio de la Plata
ComprehensiveEvergladesRestoration
Chickamauga Lock
MobileHarbor
2525
26
TresRios
HamiltonAirfield
WetlandsRestor.
99 NapaRiver
27 SantaAna R.
40 SantaMariaLevees
25Florida KeysWater QualityImprovement
2727Lock &Dam 27
2121Miss. R. betw.
Mo. & Ohio Rs. 2929KentuckyLock
7070Lock &Dam 3
35Clearwater Lake
2121GulfportHarbor
29 Garrison Dam/Lake Sakakawwea
33 RaritanRiver
28Columbia RiverTreaty FishingAccess Sites
8484
318787
Texas CityChannel
21 Columbia RiverFish Mitigation
36Bluestone Lake
Major ARRA Construction ($20 Million or More in ARRA )
![Page 14: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/14.jpg)
BUILDING STRONG® 15
191
0
50
382
38
154
159
5
6
29
DC: 1
106
18
8
16
NH: 2VT: 1
3
3
43
222
6240
38
24
157
42247
238
175
141
91
4116
24
314
19
227
31
101
84
119
26
18
6010
22
19
11
116
76
5
ARRA Activity by State(All Accounts, $ Millions)
![Page 15: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/15.jpg)
BUILDING STRONG® 16
Benefits: Jobs Created• Jobs created by USACE portion of
stimulus estimated at 139,000.
– Direct creation of ~37,000 new private sector jobs with average annual wages between $38,000 and $42,500
– Additional 102,000 new jobs in industries supplying construction and O&M activities and sell goods and services to new workers and their families.
![Page 16: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/16.jpg)
BUILDING STRONG® 17
17
ARRA Execution HighlightsOver 800 projects
64 Investigations / 172 Construction / 523 O&M / 45 MR&T / 9 FUSRAP
Over 4,800 work packages
Over 1,000 contract actions scheduled by Sep 09
(1st 5 months )
$2.1 BIL (~50% ) scheduled for obligation by Sep 09
$3.5 BIL (~75%) scheduled for obligation by Mar 10
![Page 17: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/17.jpg)
BUILDING STRONG® 18
CW ARRA Projection
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
$ M
illi
on
s
0
100
200
300
400
500
600
700
800
900
1,000
# C
on
tra
cts
Sched Aw ds 108 221 379 446 876 350 247 255 134 67 100 56 27 29 27 23 40
Actual Aw ds 124 265 432 429 178
Sched Oblig (cum) 228 535 899 1,320 2,233 2,787 3,024 3,315 3,536 3,708 3,844 3,903 4,036 4,116 4,177 4,285 4,410
Actual Oblig (cum) 228 535 899 1,308 1,616
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Data a/o 22 Sep 09
![Page 18: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/18.jpg)
BUILDING STRONG® 19
Civil Works Recovery Act Contract Actions
Out of 1,886 Contract Actions, 76% (48% Dollar Value) are for Small Business
Source: FPDS-NG data, 18 Sept 09
$ in Millions
$208$178
$97
$22
$271
$0$0M
$100M
$200M
$300M
SmallDisadvantaged
Businesses
8(a) ProgramParticipants
Women-OwnedSmall
Businesses
Service-Disabled
Veteran-OwnedSmall Business
HUBZoneBusinesses
HistoricallyBlack CollegesUniv's/Minority
Institutions
48%
52%$756M
LargeBusiness
SmallBusiness
$684M
*Categories overlap. Numbers are not cumulative.
Dollar Value* ($M)
76%
24%
456 ContractActions
LargeBusiness
Small Business1,430
Contract Actions
# Contracts
236201
264
57
264
50
250
500
SmallDisadvantaged
Businesses
8(a) ProgramParticipants
Women-OwnedSmall
Businesses
Service-Disabled
Veteran-OwnedSmall Business
HUBZoneBusinesses
HistoricallyBlack CollegesUniv's/Minority
Inistitutions
Contract Actions* (#)1,886
ContractActions
$1,440MContract
Value
![Page 19: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/19.jpg)
BUILDING STRONG® 20
St. BernardSt. Bernard
New Orleans EastNew Orleans EastNew Orleans New Orleans
MetroMetroJefferson – Jefferson – St. CharlesSt. Charles
Harvey - Harvey - WestwegoWestwego
Lower Lower PlaqueminesPlaquemines
Belle ChasseBelle Chasse
Gretna - AlgiersGretna - Algiers
IHNC
Perm Pumps
PS Repair
Storm Proofing
SELA
LACPR
Levees and Floodwalls / 100 yr
No budget / schedule issues
Potential budget / schedule issues
Programmatic schedule / budget not met
LCA
WCC
New Orleans HSDRRS
![Page 20: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/20.jpg)
BUILDING STRONG® 21
New Orleans HSDRRSConstruction Contract Status
*Includes contracts awarded and completed under TFG.*Includes contracts awarded and completed under TFG.
Contracts
TOTAL* 361
Awarded to date* 208
Complete* 158
Under Construction 50
Remaining Awards 153
As of 4 Sep 09As of 4 Sep 09
![Page 21: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/21.jpg)
BUILDING STRONG® 22
HSDRRS Scheduled Awards 2009
As of 4 Sep 09As of 4 Sep 09
![Page 22: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/22.jpg)
BUILDING STRONG® 23
60 Day Contract Award OutlookContract Award
Date (as of 28 Aug 09)
100-yr Risk Reduction
Date
Completion Date
Contract
11-Sep-09 25-Feb-10 LPV-18.2 Floodwall and Gate at Williams Blvd. Boat Launch-Phase 212-Sep-09 03-Oct-11 LPV-148.02 Chalmette Loop Levee Hwy 46 to River (Verret to Caernarvon)14-Sep-09 17-Feb-10 WBV-71 Western Tie-In Levees (North-South)15-Sep-09 09-Apr-10 WBV-14e.2 V-line levee, East of Vertex - Phase 215-Sep-09 03-Mar-11 WBV-70 Western Tie-In Levees (Dewatering Cells)16-Sep-09 27-Feb-10 LPV-109.02a2 Drainage Blanket16-Sep-09 05-Feb-10 WBV-14b.2 Orleans Village to Hwy 45 Levee- Phase 224-Sep-09 25-Nov-09 LGM-028A S. L. Crawfish Farm Pump Station Discharge
29-Sep-09 01-Nov-10 LPV-04.2A Levee - Reach 1A from Cross Bayou to St. Rose and Gulf South Floodwall - Phase 2
05-Oct-09 28-May-11WBV-10 Belle Chasse PS #1 (Plaquemines PS) Fronting Protection and Modifications-Phase 1
06-Oct-09 15-Jul-10 LPV-06a.2 Bayou Trepagnier Complex Floodwall - Phase 206-Oct-09 16-Feb-11 LPV-05.2B Levee - Reach 2B-from Good Hope to Cross Bayou - Phase 206-Oct-09 19-Sep-11 LPV-106.01 Foreshore Protection in front of 106-10808-Oct-09 25-May-11 WBV-08 S&WB PS #13 Fronting Protection and Modifications08-Oct-09 18-May-11 WBV-13 S&WB PS #11Fronting Protection and Modifications09-Oct-09 23-May-11 IHNC-01 IHNC Flood Protection- Seabrook13-Oct-09 16-Dec-09 LPV-07b.2a Cross Bayou Access Bridge and Pile Load Test13-Oct-09 11-Feb-10 LPV-16.2 Floodwall and Gate at Bonnabel Boat Launch- Phase 214-Oct-09 26-Feb-11 WBV-11 Belle Chasse PS #2 Fronting Protection and Modifications15-Oct-09 13-Jan-12 SELA-01a Soniat Canal - West Napoleon to Lynette15-Oct-09 06-Oct-10 LPV-104.01a Lakefront Levee OEB - London Ave. Canal to IHNC - Phase 1A16-Oct-09 24-Jan-11 JSP-06 Storm Proofing Two Pump Stations19-Oct-09 15-Nov-10 WBV-24 Segnette State Park Floodwall19-Oct-09 20-Aug-10 WBV-22 Westwego Floodwall
19-Oct-09 30-May-11 04-Nov-13LPV-09.2 Pumping Stations #1 (Bonnabel), #2 (Suburban), #3 (Elmwood) and #4 (Duncan)
23-Oct-09 WBV-07 Planters PS Fronting Protection and Modifications26-Oct-09 WBV-04.2 Belle Chasse Hwy to Hero Cutoff-Reach1-Phase 226-Oct-09 01-Apr-11 06-May-11 LPV-104.02 Lakefront Levee OEB - London Ave Canal to IHNC30-Oct-09 26-Jul-11 OSP-01 15 MW 60 HZ Generator30-Oct-09 01-Jun-10 WBV-05.2 Belle Chasse Hwy to Hero Cutoff-Reach 2 - Phase 2
![Page 23: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/23.jpg)
BUILDING STRONG® 24
FY2011 Budget - Status• May 2009 – Budget EC 11-2-196
• May 2009 – Budget Initiatives Meeting with Principle Deputy ASA(CW)
• June 2009 -- Budget Initiatives Meeting with ASA(CW),OMB, CEQ
• July 2009 — ASA(CW) Budget Guidance Letter
• Sep 2009 – Initial Budget Submission to OMB
• Nov 2009 – FY11 Budget Passback from Administration
• Feb 2010 – President Presents Budget to Congress
![Page 24: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/24.jpg)
BUILDING STRONG® 25
FY 2011 Administration Guidance
• Better• Faster• Greener• More Transparent• More Collaborative
• More Environmentally Oriented Program• Global Climate Change• Focus on a Few High Priority Goals
![Page 25: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/25.jpg)
BUILDING STRONG® 26
Budget ChallengesDam Safety
Levee Safety
Major Rehabilitationof Infrastructure
No $ for New Projects
Climate Change/Melting Snowpacks
![Page 26: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/26.jpg)
BUILDING STRONG® 27
Program Initiatives• Place-based Initiatives
• Environmental Sustainability– Valuing of social and environmental benefits
– Beneficial use of dredged material
• Rebuilding our Infrastructure– Harbor Maintenance Trust Fund
– Inland Waterways Trust Fund
– Direct Funding of Hydropower
• Efficient Project Operations
![Page 27: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/27.jpg)
BUILDING STRONG® 28
Future Financing StrategyPresent Implementable Solutions• Forget “Backlog”• Annualize costs• Prioritize projects• Present Multi-year ‘Programs’
• Inland Waterways (~75)• Hydropower (~54)• Dam Safety (DSAC 1-4)
• Always show value
![Page 28: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/28.jpg)
BUILDING STRONG® 29
![Page 29: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/29.jpg)
BUILDING STRONG® 30
External Trends To Watch
• Continuing Pressure on Budget• Entitlement Programs
( Medicare, Medicaid, Social Security)• Interest on the National Debt
• Cost of Infrastructure Recapitalization• Improved Inspection Techniques• Modern Design Standards• Cost of meeting ESA and other legal requirements
• Cost of Construction Inflating Faster than CPI• Fuel, Steel, Concrete• Expanding worldwide demand
![Page 30: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/30.jpg)
BUILDING STRONG® 31
US Army Corps of Engineers
BUILDING STRONG®
![Page 31: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/31.jpg)
BUILDING STRONG® 33
Appropriations Available in FY 2009 ($M)
Carry-
InFY09
ConferenceFY08 WarSupplem.
FY 2008 CRA
Supplem Recovery
ActFY09
SupplemTotal
AvailableSched.
ObligationSched.
Carryover
(RecoveryAct Carry-
over)
Investigations 93 168 25 286 180 106 9
Construction 1,445 2,142 2,835 1,539 2,000 9,961 4,255 5,706 1,242
O&M 414 2,202 740 2,075 43 5,474 4,248 1,226 877
Miss. R. & Tribs. 95 384 82 375 936 561 375 224
Regulatory 12 183 25 220 200 20 16
FC&CE 3,516 2,926 416 754 7,611 1,508 6,103
F.U.S.R.A.P. 5 140 100 245 174 71 57
Expenses 1 179 180 175 5
ASA(CW) 0 5 5 5 0
Total 5,581 5,403 5,761 2,777 4,600 797 24,919 11,306 13,613 2,425
![Page 32: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/32.jpg)
BUILDING STRONG® 40
CIVIL WORKS ARRA EXECUTIONALL PROGRAMS
Data a/o 31 Aug 09, Sep Actual a/o 22 Sep 09
# o
f C
on
trac
ts
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000 $
Mill
ion
s
0
100
200
300
400
500
600
700
800
900
1,000
Basic Sched 64 127 327 333 613 552 112 44 67
Current Sched 100 207 357 460 901 867 293 120 90
Actual Awds 106 247 342 411 178
Basic Sched (cum) 195 486 1010 1459 2194 3074 3390 3593 3989
Current Sched (cum) 228 535 900 1320 2233 3315 3844 4116 4410
Actual Oblig (cum) 228 535 899 1308 1616
May-09 Jun-09 Jul-09 Aug-09 Sep-091st Qtr FY10
2nd Qtr FY10
3rd Qtr FY10
4th Qtr FY10
![Page 33: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/33.jpg)
BUILDING STRONG® 41
WRDA 2007 Public Law 110-114 [121 Stat. 1041], Nov. 8, 2007
• Value $22 bil (~$7 bil for New Orleans area)• Title I 46 new projects w/Chiefs Reports; 145 CAP• Title IIPolicy: Independent Peer Review; Principles & Guidelines; Watershed Planning• Title III Project specific modifications; 46 deauthorizations• Title IV 87 specific studies; 14 programmatic studies• Title V New projects and modifications• Title VI Everglades• Title VII Louisiana Coastal Area• Title VII Upper Miss. and Illinois River Waterway System• Title IX National Levee Safety Program
• Implementation guidance has been provided for 65% of the provisions in WRDA.
![Page 34: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/34.jpg)
BUILDING STRONG® 42
42
High Priority Performance Goals (Draft)
• Goal 1: Aquatic Ecosystem Restoration– Restore 10,300 acres wetlands and achieving no net
loss of wetlands in Regulatory Program• Goal 2: Flood Risk Management
– Reduce risk of damage to property by $51 million and reduce risk of flood damages for 326,000 people
• Goal 3: Navigation– Increase lock availability by 0.25%
• Goal 4: Hydropower– Generate 140 billion kilowatt-hours of electricity,
avoiding 85 million tons of CO2 emissions
![Page 35: US Army Corps of Engineers BUILDING STRONG ® Developing & Maintaining Our Water Resources Infrastructure: Today & in the Future Presentation to National.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649e175503460f94b02579/html5/thumbnails/35.jpg)
BUILDING STRONG® 43
FY 2009-13 5-Year “Enhanced” Plan
• Completions and new funding– ~47 project completions in next 5
years (up from 35 in the previousFYDP FY09-13)
– ~ $290 mil ‘wedge’ funds (fromcompletions) for new projects
• Projects in the queue to be started– ~ 10 Cat 1 projects with BCR > 3:1– ~ 75 Cat 2 projects with favorable Admin position, < 3:1– ~150 Cat 3 projects without favorable Admin position
• Few, if any, new starts projected