US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact...

15
West Virginia Department of Transportation Final Environmental Impact Statement US 340 Improvement Jefferson County, West Virginia April 2019

Transcript of US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact...

Page 1: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

West Virginia

Department of Transportation

Final Environmental Impact Statement

US 340 Improvement

Jefferson County, West Virginia

April 2019

Page 2: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and
bdehler
Text Box
June 7, 2019
Page 3: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Errata Sheet Final Environmental Impact Statement

US 340 Improvement Study Page 1 of 5

List of edits between the signed SDEIS and FEIS for the US 340 widening project

FEIS Page Section Description

Various Various Adjusted references to SDEIS vs FEIS

Signature - Changed 23 USC §139(1) to 23 USC §138(l) (change number 1 to

letter l).

I-1 I.A Clarification of VDOT role in project; reference to Interstate Agreement added; revised last sentence of last paragraph

I-2 I.A Added acronym (AASHTO) to last paragraph of Section A.

I-3 I.B Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision

I-6 I.D Clarification about tabulated farmland acreages added; stream & wetland discussion updated

I-7 I.D Acreages/lengths adjusted to reflect 2017 update to extents of streams and wetlands; farmland acreages updated.

I-8 I.F Updated discussion of historic resources to include Summit Point Battlefield

I-11 I.G Language regarding ongoing Section 106 consultation removed

I-11 I.H

Section 106 commitments, watershed info, BMPs, and other standard commitment language added per agency comments. Coordination with DGIF regarding loggerhead shrike & Madison cave isopod required. Mussel surveys will be completed prior to construction; added “and human” to the first paragraph

II-1 II Clarification of project endpoint

II-1 II Clarification of VDOT role in project; reference to Interstate Agreement added

II-2 II Updated stream information; grammatical correction, paragraph 2 – deleted second “in”

II-4 II.A

First sentence – corrected punctuation; Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision

II-5 II.B Last paragraph revised for readability

II-6 II.C Added “although the speed limit is reduced to 40 mph through Rippon” in the next to last sentence in paragraph two.

II-7 II.C Spelled out “vpd” (vehicles per day) for first time use.

II-12 II.E Grammatical correction of VA 340 to US 340

II-14 II.F Deleted last sentence of first full bullet paragraph

III-1 to III-4

III

Corrected naming convention for Kabletown Rural Historic District; added reference to Envision Jefferson 2035 to support eliminating Mass Transit and TSM alternatives; Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon

Page 4: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement Errata Sheet

Page 2 of 5 US 340 Improvement Study

FEIS Page Section Description

Commons” subdivision; expanded discussion o f alternatives and reasons for elimination.

III-6 III.A.2 Revised “Oak Hill” subdivision to “Rippon Commons” subdivision

III-7 III.A.2 Revised “Oak Hill” subdivision to “Rippon Commons” subdivision

III-8 III.B Spelling correction of judgment

III-9 to III-11

III.C Minor adjustments to alternate ranking based on updated extents of streams, wetlands, and adjusted impacts to historic resources after including the Summit Point Battlefield

III-12 III.D

Updated discussion based on adjusted rankings; replaced “take” with “require the acquisition of”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision; adjusted acreages to agree with Table III-3.

III-13 III.D Added statement to define “active” prime and unique, and statewide and locally important farmland.

IV-4 III.A.2 Top sentence deleted for clarity

IV-9 III.A.3.a Adjusted number of build alternates from “four” to “three” to reflect the number of remaining build alternates under consideration

IV-10 IV.A.4 Paragraph 2, last sentence corrected verb tense

IV-11 IV.A.5.a Added discussion on Ryan’s Glen and Rippon Commons subdivisions

IV-13 IV.A.5.d Deleted the phrase “improving emergency response times”

IV-14 to IV-16

IV.A.6 Various text additions/clarifications for EJ discussion

IV-15 IV.A.6 Grammatical corrections and deleted last sentence of third bullet for clarification

IV-17 IV.B.1 Interim language about SHPO coordination and MOA development deleted; corrected verb tenses.

IV-17 IV.B.1 Deleted last sentence of second paragraph now that an MOA has been executed

IV-20 thru 22

IV.B.2 Additional coordination points inserted and various corrections

IV-24 IV.B.3 Description of 2017 archaeological survey and SHPO concurrence added

IV-24 IV.B.3 Added paragraph regarding the Phase I Archaeological Survey from 2016

IV 24 IV.B.4.a Reworded last sentence to remove redundancy

IV-26 IV.B.4.b New Section describing the battlefield evaluation; Added language to clarify content of referenced exhibits

IV-27 IV.B.4.c Added language to clarify content of referenced exhibits

IV-27 IV.B.4.c Clarification that McPherson-Adams House is eligible under Criterion A

Various IV.B.4 Added SHPO site numbers for individual resources

Page 5: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Errata Sheet Final Environmental Impact Statement

US 340 Improvement Study Page 3 of 5

FEIS Page Section Description

IV-30 to IV-32

IV.B.4.d Revised language effect findings: St. John’s Episcopal Church is “No Adverse Effect;” Norfolk-Southern Railroad is “No Effect;” McPherson-Adams House is “No Effect”;

IV-31 IV.B.4.d Corrected acreage; removed language regarding ongoing consultation process, clarifying alignment shifts may be explored during final design to minimize impacts

IV-31 IV.B.4.d Deleted reference that “no contributed structures are impacted” within Byrdland property

IV-33 IV.B.4.d

Revised Bullskin Run Historic District paragraph to include removal of Byrdland tenant house and impact to Site 46JF603. Revised description of “small bridge.” Adjusted acreage to reflect updated totals; Revised number of remaining build alternates to “three” in the discussion on Beverly Farm; Added paragraph on Summit Point Battlefield

IV-33 to IV-34

IV.B.4.e Clarification added regarding Section 106 MOA commitments; removed references to ongoing consultation process; modified last bullet item for clarification

IV-40 IV.C.2.a Added language about stream extents, that Bullskin Run is stocked with Trout, and that Long Marsh Run and Bullskin Run will require mussel surveys

IV-40 IV.C.2.a Revised text for consistency and clarification

IV-41 IV.C.2.a Revised “stream-runs” to “stream crossings”

IV-39 to IV-41

IV.C.2.a

Revised number of streams to “two” based on recent stream delineation efforts; Deleted second bullet in list since no stream was identified at that location; added language regarding BMPs for public water drinking sources; revised layout of Table IV-12

IV-41 IV.C.2.a Lengths adjusted to reflect 2017 update to extents of streams

IV-43 IV.C.2.d Revised last sentence of this section

IV-45 IV.C.2.f Permit discussion updated to include VA requirements

IV-46 IV.C.3 Added language defining wetlands and discussing 2017 determinations that resulted in updated extents for streams and wetlands

IV-47 IV.C.3 Revised last paragraph in this section

IV-49 to IV-51

IV.C.4.a

Added two paragraphs to opening statements regarding wildlife passage. Added statement regarding recent correspondence (August 2018) with USFWS; Restated biological assessments and conclusions to reflect the USFWS letter.

IV-51 IV.C.4.a Added language regarding Gaylord Calcareous Marsh Conservation Site with coordination commitments for Loggerhead shrike

IV-55 IV.C.5.b Shifted text around Table IV-15

IV-55 IV.C.5.b Added ID reference numbers to resources in Table IV-15

various IV.C.5.b Added ID reference numbers to resource descriptions

IV-59 IV.C.5.b Added description for Summit Point Battlefield

Page 6: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement Errata Sheet

Page 4 of 5 US 340 Improvement Study

FEIS Page Section Description

IV-60 IV.C.5.c Added Summit Point Battlefield to the list of moderate visual impacts; modified list of low visual impact; revised last bullet

various IV.C.6 Shifted text around to display tables

IV-66 IV.C.6.d Deleted reference to Exhibit IV-9 due to inaccurate description; updated table reference in first bullet

IV-70 IV.C.6.d Cleaned up text following Table IV-20

IV-72 IV.C.6.e Corrected three detailed study build alternates

IV-74 IV.C.7 Added the date January 2015 to the last sentence of this section.

IV-74 IV.C.7.a Corrected three detailed study build alternates

IV-75 IV.C.7.b First paragraph, sentence three – revised for readability

IV-76 to IV-77

IV.C.7.c New section to discuss air quality permit requirements added

IV-77 to IV-79

IV.C.7.d Revised section on Climate Change (Section IV.C.7.c in SDEIS)

IV-79 IV.C.8 Added reference to Table IV-22; Added language regarding VA hazmat requirements

IV-81 IV.C.8 Updated when tanks were removed at Dave’s Auto Sales

IV-83 to IV-85

IV.D.2 Added language regarding construction dust, open burning, and fuel-burning equipment

IV-84 IV.D.2 Revised 3rd bullet under Fuel Burning Equipment.

IV-85 IV-D.3.a Second paragraph, combined paragraphs from the SDEIS and added a sentence for clarification.

IV-87 - 88 IV.D.3.a Revised last paragraph.

IV-88 IV-D.3.b Added second paragraph.

various Exhibits IV-

XX Inserted new Exhibit IV-4 for Summit Point Battlefield and renumbered former Exhibits IV-4 to IV-9 to Exhibits IV-5 to IV-10.

V-5 - 29 various Rearranged this Section for better readability and clarity.

V-1 V Changed “evaluation” to “protection”

V-2 to V-5 V.A Revised SHPO to WV SHPO; Deleted last sentence of second paragraph; Added text on Section 106 consultation process; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision

V-24 V.C.4.a Formerly Section V.B.4.a in SDEIS; Clarification added regarding Section 106 MOA commitments

V-5 to V-15 V.B.1 to

V.B.7

Formerly Sections V.C to V.I; Miscellaneous corrections and clarifications regarding Section 106 MOA commitments, corrected acreages, and text revisions and additions for clarity.

V-16 Formerly Section V.J in SDEIS; Deleted this section.

V-17 V.C.1 Formerly Section V.B.1 in SDEIS; Updated first paragraph to include Summit Point Battlefield

V-18 V.C.1 Formerly Section V.B.1 in SDEIS; Added Summit Point Battlefield to bullet list of eligible resources

V-18 to V-22

V.C.2 Formerly Section V.B.2 in SDEIS; Inserted “property” to clarify impact; added sentence regarding impacts to Summit Point

Page 7: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Errata Sheet Final Environmental Impact Statement

US 340 Improvement Study Page 5 of 5

FEIS Page Section Description

Battlefield to each of the alternate descriptions; updated acres of right of way acquisition from historic properties for alternates 10A, 10B, and 11; added paragraph at end of section regarding Summit Point Battlefield

V-23 V.C.3 Formerly Section V.B.3 in SDEIS; Added sentence to opening paragraph on Summit Point Battlefield and US DOI concurrence

V-24 V.C.4 Formerly Section V.B.4 in SDEIS; Revised sentence regarding Alternate 11.

V-24 V.C.4.a Formerly Section V.B.4.a in SDEIS; Revised for readability; Clarification added regarding Section 106 MOA commitments

V-24 to V-25

V.C.4.b Formerly Section V.B.4.b in SDEIS; Revised to include Summit Point Battlefield; removed reference to Ripon Lodge impact from Alt 4 discussion; updated impact values for Alternate 4A

V-25 V.C.4.b Formerly Section V.B.4.b in SDEIS; Updated values in Table V-1 and subsequent descriptions of impacts for remaining build alternates

V-26 V.C.4.b Formerly Section V.B.4.b in SDEIS; Added Summit Point Battlefield to Table V-2 and adjusted totals

V-27 V.C.4.d Formerly Section V.B.4.d in SDEIS; Text edits for consistency and clarification.

V-27 V.C.4.f Formerly Section V.B.4.f in SDEIS; Revised “stream” to “wetland” and added “active” farmland.

V-27 V.D

Formerly Section V.J in the SDEIS; Corrected to specify 2-3 contributing elements impacted by remaining build alternates; Updated language to reflect conclusion of Section 106 consultation process; Added text on Summit Point Battlefield.

Exhibits V

Deleted Exhibit V-1; Renumbered Exhibits V-2 to V-13 to Exhibits V-1to V-12; Added boundary for Summit Point Battlefield to Exhibit V-5; Added Exhibit V-12 to illustrate impacts to Summit Point Battlefield.

VI-1 VI Added preparer

VII-2 VII.C Summary of 2016 SDEIS public hearing added

Figures All Updates labels; added historic resource site identification numbers to appropriate figures; updated extents for streams/wetlands.

Appendices B Added June 26, 2018 Correspondence transmitting final MOA; Added August 8, 2018 email correspondence from USFWS

Page 8: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study i

Table of Contents

I. SUMMARY .................................................................................................................................................................................... I-1

A. PROPOSED ACTION ............................................................................................................................. I-1

B. PROJECT BACKGROUND ..................................................................................................................... I-2

C. ALTERNATIVES CONSIDERED .......................................................................................................... I-4

D. ENVIRONMENTAL IMPACTS ............................................................................................................. I-6

E. BUILD ALTERNATES ELIMINATED .................................................................................................. I-7

F. AREAS OF CONTROVERSY ................................................................................................................. I-7

G. OTHER GOVERNMENT ACTIONS REQUIRED ................................................................................ I-11

H. ENVIRONMENTAL COMMITMENTS ............................................................................................... I-11

II. PROJECT PURPOSE AND NEED ........................................................................................................................................ II-1

A. PROJECT STATUS ................................................................................................................................ II-3

B. SYSTEM LINKAGE ............................................................................................................................... II-5

C. CAPACITY AND TRANSPORTATION DEMAND ............................................................................... II-6

D. SOCIAL DEMANDS AND ECONOMIC DEVELOPMENT ................................................................. II-11

E. MODAL INTER-RELATIONSHIPS .................................................................................................... II-12

F. ROADWAY CHARACTERISTICS ...................................................................................................... II-13

G. SAFETY ............................................................................................................................................... II-16

1. Accident Rates ............................................................................................................................... II-16

2. Severity Index ................................................................................................................................ II-17

3. Safety Summary ............................................................................................................................. II-19

H. CONCURRENCE WITH PURPOSE AND NEED ............................................................................... II-19

III. ALTERNATIVES ...................................................................................................................................................................... III-1

A. BUILD ALTERNATIVE ....................................................................................................................... III-5

1. Build Alternative Design Criteria................................................................................................... III-5

2. Build Alternates 4, 4A, 4B, 4C, 10A, 10B, and 11 .......................................................................... III-5

B. BUILD ALTERNATE COMPARISON ................................................................................................. III-8

C. ANALYSIS OF BUILD ALTERNATES ................................................................................................ III-9

D. PREFERRED ALTERNATE .............................................................................................................. III-12

IV. AFFECTED ENVIRONMENT & ENVIRONMENTAL CONSEQUENCES .............................................................. IV-1

A. SOCIAL ENVIRONMENT ................................................................................................................... IV-1

1. Population and Growth Characteristics ........................................................................................ IV-1

Page 9: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study ii

b) Population Characteristics ............................................................................................................. IV-1

c) Age of Population ............................................................................................................................ IV-3

d) Growth Trends ................................................................................................................................ IV-3

2. Economic Development.................................................................................................................. IV-4

a) Income and Housing Characteristics ............................................................................................. IV-5

b) Project Effects on the Local Economy ........................................................................................... IV-7

3. Land Use Planning .......................................................................................................................... IV-8

a) Impacts to Land Use ....................................................................................................................... IV-9

4. Relocation Impacts ......................................................................................................................... IV-9

5. Community Facilities and Services .............................................................................................. IV-11

a) Neighborhoods and Community Cohesion ................................................................................. IV-11

b) Utilities .......................................................................................................................................... IV-12

c) Education ...................................................................................................................................... IV-12

d) Emergency Services ...................................................................................................................... IV-13

e) Other Community Facilities ......................................................................................................... IV-13

6. Environmental Justice .................................................................................................................. IV-14

7. Transportation Facilities .............................................................................................................. IV-16

B. HISTORIC AND ARCHAEOLOGICAL RESOURCES ........................................................................ IV-17

1. Overview of Effects Criteria ......................................................................................................... IV-17

2. Consultation Process .................................................................................................................... IV-19

3. Archaeological Sites ...................................................................................................................... IV-23

a) Project Effects on Archaeological Sites ....................................................................................... IV-25

4. Historic Architectural Resources ................................................................................................. IV-25

a) 2015 Survey Update ..................................................................................................................... IV-26

b) 2017 Supplemental Battleground Evaluation ............................................................................ IV-26

c) NRHP Listed & Eligible Resources in the APE ............................................................................ IV-27

d) Determinations of Project Effects ................................................................................................ IV-29

e) Mitigation Measures for Preferred Alternate.............................................................................. IV-34

C. NATURAL ENVIRONMENT ............................................................................................................. IV-35

1. Geology & Terrestrial Habitats .................................................................................................... IV-35

a) Soils................................................................................................................................................ IV-35

2. Water Resources ........................................................................................................................... IV-39

a) Streams .......................................................................................................................................... IV-39

b) Ponds ............................................................................................................................................. IV-41

c) Springs ........................................................................................................................................... IV-42

Page 10: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study iii

d) Ground Water ............................................................................................................................... IV-42

e) Floodplains ................................................................................................................................... IV-44

f) Required Permits .......................................................................................................................... IV-45

3. Wetlands ....................................................................................................................................... IV-46

a) Project Impacts ............................................................................................................................. IV-47

4. Wildlife .......................................................................................................................................... IV-48

a) Threatened and Endangered Species .......................................................................................... IV-49

5. Visual Characteristics ................................................................................................................... IV-52

a) Existing Visual Environment ....................................................................................................... IV-52

b) Visual Impacts............................................................................................................................... IV-53

c) Mitigation ...................................................................................................................................... IV-59

6. Noise .............................................................................................................................................. IV-60

a) Characteristics of Noise................................................................................................................ IV-62

b) Measurement of Existing Noise Levels........................................................................................ IV-63

c) Predicted Existing Noise Levels ................................................................................................... IV-64

d) Traffic Noise Impact Analysis ...................................................................................................... IV-66

e) Potential Noise Abatement Measures ......................................................................................... IV-70

f) Construction Noise ....................................................................................................................... IV-73

7. Air Quality ..................................................................................................................................... IV-73

a) Carbon Monoxide.......................................................................................................................... IV-74

b) Mobile Source Air Toxics (MSAT) ................................................................................................ IV-75

c) Permits .......................................................................................................................................... IV-76

d) Climate Change ............................................................................................................................. IV-77

8. Hazardous Materials .................................................................................................................... IV-79

D. OTHER POTENTIAL IMPACTS ........................................................................................................... IV-82

1. Energy ........................................................................................................................................... IV-82

2. Construction Impacts ................................................................................................................... IV-82

3. Cumulative and Secondary Impacts ............................................................................................ IV-85

a) Secondary Impacts ....................................................................................................................... IV-85

b) Cumulative Impacts ...................................................................................................................... IV-88

4. Short-term Use versus Long-term Productivity ......................................................................... IV-89

5. Irreversible and Irretrievable Commitment of Resources ......................................................... IV-89

V. SECTION 4(F) EVALUATION ............................................................................................................................................... V-1

A. INTRODUCTION .................................................................................................................................. V-1

B. AFFECTED SECTION 4(F) PROPERTIES .......................................................................................... V-5

Page 11: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study iv

1. Kabletown Rural Historic District ............................................................................................... V-5

a) Description ....................................................................................................................................... V-5

b) Potential Impacts ............................................................................................................................. V-6

c) Measures to Minimize Harm ........................................................................................................... V-7

2. Bullskin Run Rural Historic District............................................................................................ V-7

a) Description ....................................................................................................................................... V-7

b) Potential Impacts ............................................................................................................................. V-8

c) Measures to Minimize Harm ........................................................................................................... V-8

3. Village of Rippon Historic District ............................................................................................... V-8

a) Description ....................................................................................................................................... V-8

b) Potential Impacts ............................................................................................................................. V-9

c) Measures to Minimize Harm ........................................................................................................... V-9

4. Olive Boy Farm Section 4(f) Property ....................................................................................... V-10

a) Description ..................................................................................................................................... V-10

b) Potential Impacts ........................................................................................................................... V-10

c) Measures to Minimize Harm ......................................................................................................... V-11

5. Byrdland Section 4(f) Property .................................................................................................. V-11

a) Description ..................................................................................................................................... V-11

b) Potential Impacts ........................................................................................................................... V-12

c) Measures to Minimize Harm ......................................................................................................... V-12

6. Straithmore Section 4(f) Property ............................................................................................. V-13

a) Description ..................................................................................................................................... V-13

b) Potential Impacts ........................................................................................................................... V-13

c) Measures to Minimize Harm ......................................................................................................... V-14

7. Beverly Farm Section 4(f) Property .......................................................................................... V-14

a) Description ..................................................................................................................................... V-14

b) Potential Impacts ........................................................................................................................... V-15

c) Measures to Minimize Harm ......................................................................................................... V-15

8. Summit Point Battlefield ............................................................................................................. V-15

a) Description ..................................................................................................................................... V-15

b) Potential Impacts ........................................................................................................................... V-16

c) Measures to Minimize Harm ......................................................................................................... V-16

C. SECTION 4(F) EVALUATION SUMMARY ....................................................................................... V-17

1. Section 4(f) Properties .................................................................................................................. V-17

2. Build Alternates and Build Impacts to 4(f) Properties................................................................ V-18

Page 12: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study v

3. Avoidance Alternatives ................................................................................................................. V-23

4. Minimization and Overall Harm (Macro-level Analysis) ............................................................ V-23

a) Ability to Mitigate Adverse Impacts ............................................................................................. V-24

b) Relative Severity of Remaining Harm .......................................................................................... V-24

c) Relative Significance of Each Property......................................................................................... V-27

d) Views of Officials with Jurisdiction ............................................................................................... V-27

e) Degree each Alternate Meets Purpose and Need ......................................................................... V-27

f) Adverse Impacts to Non 4(f) Resources ...................................................................................... V-27

g) Cost Differences ............................................................................................................................. V-28

D. SUMMARY .......................................................................................................................................... V-28

VI. LIST OF PREPARERS ............................................................................................................................................................ VI-1

VII. LIST OF AGENCIES, ORGANIZATIONS, AND PERSONS TO WHOM COPIES OF THIS STATEMENT ARE

SENT ......................................................................................................................................................................................................VII-1

VIII. COMMENTS AND COORDINATION ............................................................................................................................. VIII-1

A. INFORMATION WORKSHOP – SEPTEMBER 24, 2012 ................................................................ VIII-1

B. PUBLIC WORKSHOP/HEARING – JUNE 3, 2013 ......................................................................... VIII-1

C. PUBLIC WORKSHOP/HEARING – AUGUST 30, 2016 ................................................................. VIII-2

IX. INDEX .......................................................................................................................................................................................... IX-1

X. REFERENCES ............................................................................................................................................................................. X-1

Page 13: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study vi

List of Exhibits

EXHIBIT I-1: HISTORIC RESOURCE IMPACTS ................................................................................................ I-15

EXHIBIT I-2: KABLETOWN RURAL HISTORIC DISTRICT .............................................................................. I-17

EXHIBIT I-3: BULLSKIN RUN RURAL HISTORIC DISTRICT .......................................................................... I-19

EXHIBIT I-4: SUMMIT POINT BATTLEFIELD ................................................................................................. I-21

EXHIBIT II-1: PROJECT VICINITY ................................................................................................................... II-21

EXHIBIT II-2: PROJECT STUDY AREA ............................................................................................................ II-23

EXHIBIT II-3: REGIONAL TRANSPORTATION NETWORK ........................................................................... II-25

EXHIBIT II-4: LOCAL TRANSPORTATION NETWORK .................................................................................. II-27

EXHIBIT II-5: LEVEL OF SERVICE .................................................................................................................. II-29

EXHIBIT II-6: AVERAGE DAILY TRAFFIC AND LEVEL OF SERVICE ............................................................ II-31

EXHIBIT II-7: EXISTING AND FUTURE LAND USE ........................................................................................ II-33

EXHIBIT II-8: LOCAL POINTS OF INTEREST ................................................................................................. II-35

EXHIBIT II-9: ACCIDENT TYPES .................................................................................................................... II-37

EXHIBIT II-10: ACCIDENT LOCATIONS AND TYPES BY SEGMENT ............................................................. II-39

EXHIBIT III-1: PROPOSED TYPICAL SECTION ............................................................................................. III-17

EXHIBIT III-2: BUILD ALTERNATE LOCATIONS .......................................................................................... III-19

EXHIBIT III-3: BUILD ALTERNATE 4 LOCATION ......................................................................................... III-21

EXHIBIT III-4: BUILD ALTERNATE 4A LOCATION ...................................................................................... III-23

EXHIBIT III-5: BUILD ALTERNATE 4B LOCATION ...................................................................................... III-25

EXHIBIT III-6: BUILD ALTERNATE 4C LOCATION ...................................................................................... III-27

EXHIBIT III-7: BUILD ALTERNATE 10A LOCATION .................................................................................... III-29

EXHIBIT III-8: BUILD ALTERNATE 10B LOCATION .................................................................................... III-31

EXHIBIT III-9: BUILD ALTERNATE 11 LOCATION ...................................................................................... III-33

EXHIBIT III-10: BUILD ALTERNATE 4 DESIGN ........................................................................................... III-35

EXHIBIT III-11: BUILD ALTERNATE 4A DESIGN ......................................................................................... III-37

EXHIBIT III-12: BUILD ALTERNATE 4B DESIGN ......................................................................................... III-39

EXHIBIT IV-1: KABLETOWN RURAL HISTORIC DISTRICT ......................................................................... IV-91

EXHIBIT IV-2: BULLSKIN RUN RURAL HISTORIC DISTRICT ...................................................................... IV-93

EXHIBIT IV-3: BULLSKIN RUN & KABLETOWN RURAL HISTORIC DISTRICTS ......................................... IV-95

EXHIBIT IV-4: SUMMIT POINT BATTLEFIELD ............................................................................................ IV-97

EXHIBIT IV-5: INDIVIDUAL HISTORIC RESOURCES .................................................................................... IV-99

EXHIBIT IV-6: FARMLAND SOILS ............................................................................................................... IV-101

EXHIBIT IV-7: WATER RESOURCES ............................................................................................................ IV-103

EXHIBIT IV-8: 100-YEAR FLOODPLAIN LIMITS ........................................................................................ IV-105

Page 14: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study vii

EXHIBIT IV-9: STREAM AND WETLAND IMPACTS ................................................................................... IV-107

EXHIBIT IV-10: NOISE MONITORING LOCATIONS .................................................................................... IV-109

EXHIBIT V-1: KABLETOWN RURAL HISTORIC DISTRICT ........................................................................... V-31

EXHIBIT V-2: IMPACTS TO KABLETOWN RURAL HISTORIC DISTRICT ..................................................... V-33

EXHIBIT V-3: BULLSKIN RUN RURAL HISTORIC DISTRICT ........................................................................ V-35

EXHIBIT V-4: IMPACTS TO BULLSKIN RUN RURAL HISTORIC DISTRICT .................................................. V-37

EXHIBIT V-5: HISTORIC RESOURCES ........................................................................................................... V-39

EXHIBIT V-6: IMPACTS TO VILLAGE OF RIPPON HISTORIC DISTRICT ..................................................... V-41

EXHIBIT V-7: IMPACTS TO OLIVE BOY FARM PROPERTY .......................................................................... V-43

EXHIBIT V-8: IMPACTS TO BYRDLAND PROPERTY .................................................................................... V-45

EXHIBIT V-9: IMPACTS TO STRAITHMORE PROPERTY ............................................................................. V-47

EXHIBIT V-10: IMPACTS TO BEVERLY FARM PROPERTY .......................................................................... V-49

EXHIBIT V-11: SUMMIT POINT BATTLEFIELD ............................................................................................ V-51

EXHIBIT V-12: IMPACTS TO SUMMIT POINT BATTLEFIELD ...................................................................... V-53

List of Tables

TABLE I-1: COMPARATIVE SUMMARY ............................................................................................................ I-9

TABLE I-2: PUBLIC SURFACE WATERS ......................................................................................................... I-12

TABLE II-1: LOS FOR TWO-LANE HIGHWAYS ................................................................................................ II-7

TABLE II-2: LEVEL OF SERVICE (TWO-LANE HIGHWAY) ............................................................................ II-9

TABLE II-3: LOS FOR MULTILANE HIGHWAYS ........................................................................................... II-10

TABLE II-4: LEVEL OF SERVICE (MULTILANE HIGHWAY) ........................................................................ II-10

TABLE II-5: ACCIDENT RATES ...................................................................................................................... II-18

TABLE II-6: SEVERITY INDEX ....................................................................................................................... II-19

TABLE III-1: DESIGN CRITERIA ..................................................................................................................... III-6

TABLE III-2: RANK OF ALTERNATES .......................................................................................................... III-10

TABLE III-3: COMPARATIVE SUMMARY ..................................................................................................... III-15

TABLE IV-1: POPULATION CHARACTERISTICS ............................................................................................ IV-2

TABLE IV-2: POPULATION BY AGE GROUP AND MEDIAN AGE (2010) ...................................................... IV-3

TABLE IV-3: POPULATION PROJECTIONS .................................................................................................... IV-4

TABLE IV-4: EMPLOYMENT STATUS AND UNEMPLOYMENT RATES ........................................................ IV-5

TABLE IV-5: INCOME AND HOUSING CHARACTERISTICS ........................................................................... IV-6

TABLE IV-6: RELOCATIONS BY ALTERNATE ............................................................................................. IV-10

TABLE IV-7: LISTED & ELIGIBLE HISTORIC RESOURCES .......................................................................... IV-28

TABLE IV-8: DETERMINATION OF EFFECT ................................................................................................ IV-30

Page 15: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and

Final Environmental Impact Statement

US 340 Improvement Study viii

TABLE IV-9: SOIL TYPES BY ALTERNATE (JEFFERSON COUNTY, WV) .................................................... IV-36

TABLE IV-10: FARMLAND IMPACTS ........................................................................................................... IV-39

TABLE IV-11: STREAM CHARACTERISTICS ................................................................................................ IV-40

TABLE IV-12: STREAM IMPACTS ................................................................................................................. IV-41

TABLE IV-13: FLOODPLAIN IMPACTS ......................................................................................................... IV-45

TABLE IV-14: WETLAND IMPACTS BY ALTERNATE .................................................................................. IV-48

TABLE IV-15: VISUAL IMPACT RATING ...................................................................................................... IV-55

TABLE IV-16: NOISE ABATEMENT CRITERIA ............................................................................................ IV-61

TABLE IV-17: COMMON INDOOR AND OUTDOOR NOISE LEVELS ............................................................ IV-63

TABLE IV-18: TRAFFIC NOISE MODEL (TNM) VEHICLE CLASSIFICATION TYPES .................................. IV-65

TABLE IV-19: AMBIENT NOISE LEVELS ...................................................................................................... IV-66

TABLE IV-20: LEQ TRAFFIC NOISE LEVELS ................................................................................................ IV-68

TABLE IV-21: MAXIMUM PREDICTED CARBON MONOXIDE CONCENTRATIONS ................................... IV-75

TABLE IV-22: LIKELIHOOD TO ENCOUNTER HAZARDOUS MATERIALS ................................................. IV-80

TABLE V-1: COMPARATIVE SUMMARY OF SECTION 4(F) IMPACTS ON DISTRICTS ................................ V-25

TABLE V-2: COMPARATIVE SUMMARY OF INDIVIDUAL HISTORIC PROPERTY AND DISTRICT IMPACTS V-

26