Final Environmental Impact Statement
US 340 Improvement
Jefferson County, West Virginia
April 2019
![Page 2: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/2.jpg)
![Page 3: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/3.jpg)
Errata Sheet Final Environmental Impact Statement
US 340 Improvement Study Page 1 of 5
List of edits between the signed SDEIS and FEIS for the US 340 widening project
FEIS Page Section Description
Various Various Adjusted references to SDEIS vs FEIS
Signature - Changed 23 USC §139(1) to 23 USC §138(l) (change number 1 to
letter l).
I-1 I.A Clarification of VDOT role in project; reference to Interstate Agreement added; revised last sentence of last paragraph
I-2 I.A Added acronym (AASHTO) to last paragraph of Section A.
I-3 I.B Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision
I-6 I.D Clarification about tabulated farmland acreages added; stream & wetland discussion updated
I-7 I.D Acreages/lengths adjusted to reflect 2017 update to extents of streams and wetlands; farmland acreages updated.
I-8 I.F Updated discussion of historic resources to include Summit Point Battlefield
I-11 I.G Language regarding ongoing Section 106 consultation removed
I-11 I.H
Section 106 commitments, watershed info, BMPs, and other standard commitment language added per agency comments. Coordination with DGIF regarding loggerhead shrike & Madison cave isopod required. Mussel surveys will be completed prior to construction; added “and human” to the first paragraph
II-1 II Clarification of project endpoint
II-1 II Clarification of VDOT role in project; reference to Interstate Agreement added
II-2 II Updated stream information; grammatical correction, paragraph 2 – deleted second “in”
II-4 II.A
First sentence – corrected punctuation; Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision
II-5 II.B Last paragraph revised for readability
II-6 II.C Added “although the speed limit is reduced to 40 mph through Rippon” in the next to last sentence in paragraph two.
II-7 II.C Spelled out “vpd” (vehicles per day) for first time use.
II-12 II.E Grammatical correction of VA 340 to US 340
II-14 II.F Deleted last sentence of first full bullet paragraph
III-1 to III-4
III
Corrected naming convention for Kabletown Rural Historic District; added reference to Envision Jefferson 2035 to support eliminating Mass Transit and TSM alternatives; Summary of 2016 SDEIS public hearing added; Revised “highest” to “high cost of construction due to relocating…”; Revised “Oak Hill” subdivision to “Rippon
![Page 4: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/4.jpg)
Final Environmental Impact Statement Errata Sheet
Page 2 of 5 US 340 Improvement Study
FEIS Page Section Description
Commons” subdivision; expanded discussion o f alternatives and reasons for elimination.
III-6 III.A.2 Revised “Oak Hill” subdivision to “Rippon Commons” subdivision
III-7 III.A.2 Revised “Oak Hill” subdivision to “Rippon Commons” subdivision
III-8 III.B Spelling correction of judgment
III-9 to III-11
III.C Minor adjustments to alternate ranking based on updated extents of streams, wetlands, and adjusted impacts to historic resources after including the Summit Point Battlefield
III-12 III.D
Updated discussion based on adjusted rankings; replaced “take” with “require the acquisition of”; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision; adjusted acreages to agree with Table III-3.
III-13 III.D Added statement to define “active” prime and unique, and statewide and locally important farmland.
IV-4 III.A.2 Top sentence deleted for clarity
IV-9 III.A.3.a Adjusted number of build alternates from “four” to “three” to reflect the number of remaining build alternates under consideration
IV-10 IV.A.4 Paragraph 2, last sentence corrected verb tense
IV-11 IV.A.5.a Added discussion on Ryan’s Glen and Rippon Commons subdivisions
IV-13 IV.A.5.d Deleted the phrase “improving emergency response times”
IV-14 to IV-16
IV.A.6 Various text additions/clarifications for EJ discussion
IV-15 IV.A.6 Grammatical corrections and deleted last sentence of third bullet for clarification
IV-17 IV.B.1 Interim language about SHPO coordination and MOA development deleted; corrected verb tenses.
IV-17 IV.B.1 Deleted last sentence of second paragraph now that an MOA has been executed
IV-20 thru 22
IV.B.2 Additional coordination points inserted and various corrections
IV-24 IV.B.3 Description of 2017 archaeological survey and SHPO concurrence added
IV-24 IV.B.3 Added paragraph regarding the Phase I Archaeological Survey from 2016
IV 24 IV.B.4.a Reworded last sentence to remove redundancy
IV-26 IV.B.4.b New Section describing the battlefield evaluation; Added language to clarify content of referenced exhibits
IV-27 IV.B.4.c Added language to clarify content of referenced exhibits
IV-27 IV.B.4.c Clarification that McPherson-Adams House is eligible under Criterion A
Various IV.B.4 Added SHPO site numbers for individual resources
![Page 5: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/5.jpg)
Errata Sheet Final Environmental Impact Statement
US 340 Improvement Study Page 3 of 5
FEIS Page Section Description
IV-30 to IV-32
IV.B.4.d Revised language effect findings: St. John’s Episcopal Church is “No Adverse Effect;” Norfolk-Southern Railroad is “No Effect;” McPherson-Adams House is “No Effect”;
IV-31 IV.B.4.d Corrected acreage; removed language regarding ongoing consultation process, clarifying alignment shifts may be explored during final design to minimize impacts
IV-31 IV.B.4.d Deleted reference that “no contributed structures are impacted” within Byrdland property
IV-33 IV.B.4.d
Revised Bullskin Run Historic District paragraph to include removal of Byrdland tenant house and impact to Site 46JF603. Revised description of “small bridge.” Adjusted acreage to reflect updated totals; Revised number of remaining build alternates to “three” in the discussion on Beverly Farm; Added paragraph on Summit Point Battlefield
IV-33 to IV-34
IV.B.4.e Clarification added regarding Section 106 MOA commitments; removed references to ongoing consultation process; modified last bullet item for clarification
IV-40 IV.C.2.a Added language about stream extents, that Bullskin Run is stocked with Trout, and that Long Marsh Run and Bullskin Run will require mussel surveys
IV-40 IV.C.2.a Revised text for consistency and clarification
IV-41 IV.C.2.a Revised “stream-runs” to “stream crossings”
IV-39 to IV-41
IV.C.2.a
Revised number of streams to “two” based on recent stream delineation efforts; Deleted second bullet in list since no stream was identified at that location; added language regarding BMPs for public water drinking sources; revised layout of Table IV-12
IV-41 IV.C.2.a Lengths adjusted to reflect 2017 update to extents of streams
IV-43 IV.C.2.d Revised last sentence of this section
IV-45 IV.C.2.f Permit discussion updated to include VA requirements
IV-46 IV.C.3 Added language defining wetlands and discussing 2017 determinations that resulted in updated extents for streams and wetlands
IV-47 IV.C.3 Revised last paragraph in this section
IV-49 to IV-51
IV.C.4.a
Added two paragraphs to opening statements regarding wildlife passage. Added statement regarding recent correspondence (August 2018) with USFWS; Restated biological assessments and conclusions to reflect the USFWS letter.
IV-51 IV.C.4.a Added language regarding Gaylord Calcareous Marsh Conservation Site with coordination commitments for Loggerhead shrike
IV-55 IV.C.5.b Shifted text around Table IV-15
IV-55 IV.C.5.b Added ID reference numbers to resources in Table IV-15
various IV.C.5.b Added ID reference numbers to resource descriptions
IV-59 IV.C.5.b Added description for Summit Point Battlefield
![Page 6: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/6.jpg)
Final Environmental Impact Statement Errata Sheet
Page 4 of 5 US 340 Improvement Study
FEIS Page Section Description
IV-60 IV.C.5.c Added Summit Point Battlefield to the list of moderate visual impacts; modified list of low visual impact; revised last bullet
various IV.C.6 Shifted text around to display tables
IV-66 IV.C.6.d Deleted reference to Exhibit IV-9 due to inaccurate description; updated table reference in first bullet
IV-70 IV.C.6.d Cleaned up text following Table IV-20
IV-72 IV.C.6.e Corrected three detailed study build alternates
IV-74 IV.C.7 Added the date January 2015 to the last sentence of this section.
IV-74 IV.C.7.a Corrected three detailed study build alternates
IV-75 IV.C.7.b First paragraph, sentence three – revised for readability
IV-76 to IV-77
IV.C.7.c New section to discuss air quality permit requirements added
IV-77 to IV-79
IV.C.7.d Revised section on Climate Change (Section IV.C.7.c in SDEIS)
IV-79 IV.C.8 Added reference to Table IV-22; Added language regarding VA hazmat requirements
IV-81 IV.C.8 Updated when tanks were removed at Dave’s Auto Sales
IV-83 to IV-85
IV.D.2 Added language regarding construction dust, open burning, and fuel-burning equipment
IV-84 IV.D.2 Revised 3rd bullet under Fuel Burning Equipment.
IV-85 IV-D.3.a Second paragraph, combined paragraphs from the SDEIS and added a sentence for clarification.
IV-87 - 88 IV.D.3.a Revised last paragraph.
IV-88 IV-D.3.b Added second paragraph.
various Exhibits IV-
XX Inserted new Exhibit IV-4 for Summit Point Battlefield and renumbered former Exhibits IV-4 to IV-9 to Exhibits IV-5 to IV-10.
V-5 - 29 various Rearranged this Section for better readability and clarity.
V-1 V Changed “evaluation” to “protection”
V-2 to V-5 V.A Revised SHPO to WV SHPO; Deleted last sentence of second paragraph; Added text on Section 106 consultation process; Revised “Oak Hill” subdivision to “Rippon Commons” subdivision
V-24 V.C.4.a Formerly Section V.B.4.a in SDEIS; Clarification added regarding Section 106 MOA commitments
V-5 to V-15 V.B.1 to
V.B.7
Formerly Sections V.C to V.I; Miscellaneous corrections and clarifications regarding Section 106 MOA commitments, corrected acreages, and text revisions and additions for clarity.
V-16 Formerly Section V.J in SDEIS; Deleted this section.
V-17 V.C.1 Formerly Section V.B.1 in SDEIS; Updated first paragraph to include Summit Point Battlefield
V-18 V.C.1 Formerly Section V.B.1 in SDEIS; Added Summit Point Battlefield to bullet list of eligible resources
V-18 to V-22
V.C.2 Formerly Section V.B.2 in SDEIS; Inserted “property” to clarify impact; added sentence regarding impacts to Summit Point
![Page 7: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/7.jpg)
Errata Sheet Final Environmental Impact Statement
US 340 Improvement Study Page 5 of 5
FEIS Page Section Description
Battlefield to each of the alternate descriptions; updated acres of right of way acquisition from historic properties for alternates 10A, 10B, and 11; added paragraph at end of section regarding Summit Point Battlefield
V-23 V.C.3 Formerly Section V.B.3 in SDEIS; Added sentence to opening paragraph on Summit Point Battlefield and US DOI concurrence
V-24 V.C.4 Formerly Section V.B.4 in SDEIS; Revised sentence regarding Alternate 11.
V-24 V.C.4.a Formerly Section V.B.4.a in SDEIS; Revised for readability; Clarification added regarding Section 106 MOA commitments
V-24 to V-25
V.C.4.b Formerly Section V.B.4.b in SDEIS; Revised to include Summit Point Battlefield; removed reference to Ripon Lodge impact from Alt 4 discussion; updated impact values for Alternate 4A
V-25 V.C.4.b Formerly Section V.B.4.b in SDEIS; Updated values in Table V-1 and subsequent descriptions of impacts for remaining build alternates
V-26 V.C.4.b Formerly Section V.B.4.b in SDEIS; Added Summit Point Battlefield to Table V-2 and adjusted totals
V-27 V.C.4.d Formerly Section V.B.4.d in SDEIS; Text edits for consistency and clarification.
V-27 V.C.4.f Formerly Section V.B.4.f in SDEIS; Revised “stream” to “wetland” and added “active” farmland.
V-27 V.D
Formerly Section V.J in the SDEIS; Corrected to specify 2-3 contributing elements impacted by remaining build alternates; Updated language to reflect conclusion of Section 106 consultation process; Added text on Summit Point Battlefield.
Exhibits V
Deleted Exhibit V-1; Renumbered Exhibits V-2 to V-13 to Exhibits V-1to V-12; Added boundary for Summit Point Battlefield to Exhibit V-5; Added Exhibit V-12 to illustrate impacts to Summit Point Battlefield.
VI-1 VI Added preparer
VII-2 VII.C Summary of 2016 SDEIS public hearing added
Figures All Updates labels; added historic resource site identification numbers to appropriate figures; updated extents for streams/wetlands.
Appendices B Added June 26, 2018 Correspondence transmitting final MOA; Added August 8, 2018 email correspondence from USFWS
![Page 8: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/8.jpg)
Final Environmental Impact Statement
US 340 Improvement Study i
Table of Contents
I. SUMMARY .................................................................................................................................................................................... I-1
A. PROPOSED ACTION ............................................................................................................................. I-1
B. PROJECT BACKGROUND ..................................................................................................................... I-2
C. ALTERNATIVES CONSIDERED .......................................................................................................... I-4
D. ENVIRONMENTAL IMPACTS ............................................................................................................. I-6
E. BUILD ALTERNATES ELIMINATED .................................................................................................. I-7
F. AREAS OF CONTROVERSY ................................................................................................................. I-7
G. OTHER GOVERNMENT ACTIONS REQUIRED ................................................................................ I-11
H. ENVIRONMENTAL COMMITMENTS ............................................................................................... I-11
II. PROJECT PURPOSE AND NEED ........................................................................................................................................ II-1
A. PROJECT STATUS ................................................................................................................................ II-3
B. SYSTEM LINKAGE ............................................................................................................................... II-5
C. CAPACITY AND TRANSPORTATION DEMAND ............................................................................... II-6
D. SOCIAL DEMANDS AND ECONOMIC DEVELOPMENT ................................................................. II-11
E. MODAL INTER-RELATIONSHIPS .................................................................................................... II-12
F. ROADWAY CHARACTERISTICS ...................................................................................................... II-13
G. SAFETY ............................................................................................................................................... II-16
1. Accident Rates ............................................................................................................................... II-16
2. Severity Index ................................................................................................................................ II-17
3. Safety Summary ............................................................................................................................. II-19
H. CONCURRENCE WITH PURPOSE AND NEED ............................................................................... II-19
III. ALTERNATIVES ...................................................................................................................................................................... III-1
A. BUILD ALTERNATIVE ....................................................................................................................... III-5
1. Build Alternative Design Criteria................................................................................................... III-5
2. Build Alternates 4, 4A, 4B, 4C, 10A, 10B, and 11 .......................................................................... III-5
B. BUILD ALTERNATE COMPARISON ................................................................................................. III-8
C. ANALYSIS OF BUILD ALTERNATES ................................................................................................ III-9
D. PREFERRED ALTERNATE .............................................................................................................. III-12
IV. AFFECTED ENVIRONMENT & ENVIRONMENTAL CONSEQUENCES .............................................................. IV-1
A. SOCIAL ENVIRONMENT ................................................................................................................... IV-1
1. Population and Growth Characteristics ........................................................................................ IV-1
![Page 9: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/9.jpg)
Final Environmental Impact Statement
US 340 Improvement Study ii
b) Population Characteristics ............................................................................................................. IV-1
c) Age of Population ............................................................................................................................ IV-3
d) Growth Trends ................................................................................................................................ IV-3
2. Economic Development.................................................................................................................. IV-4
a) Income and Housing Characteristics ............................................................................................. IV-5
b) Project Effects on the Local Economy ........................................................................................... IV-7
3. Land Use Planning .......................................................................................................................... IV-8
a) Impacts to Land Use ....................................................................................................................... IV-9
4. Relocation Impacts ......................................................................................................................... IV-9
5. Community Facilities and Services .............................................................................................. IV-11
a) Neighborhoods and Community Cohesion ................................................................................. IV-11
b) Utilities .......................................................................................................................................... IV-12
c) Education ...................................................................................................................................... IV-12
d) Emergency Services ...................................................................................................................... IV-13
e) Other Community Facilities ......................................................................................................... IV-13
6. Environmental Justice .................................................................................................................. IV-14
7. Transportation Facilities .............................................................................................................. IV-16
B. HISTORIC AND ARCHAEOLOGICAL RESOURCES ........................................................................ IV-17
1. Overview of Effects Criteria ......................................................................................................... IV-17
2. Consultation Process .................................................................................................................... IV-19
3. Archaeological Sites ...................................................................................................................... IV-23
a) Project Effects on Archaeological Sites ....................................................................................... IV-25
4. Historic Architectural Resources ................................................................................................. IV-25
a) 2015 Survey Update ..................................................................................................................... IV-26
b) 2017 Supplemental Battleground Evaluation ............................................................................ IV-26
c) NRHP Listed & Eligible Resources in the APE ............................................................................ IV-27
d) Determinations of Project Effects ................................................................................................ IV-29
e) Mitigation Measures for Preferred Alternate.............................................................................. IV-34
C. NATURAL ENVIRONMENT ............................................................................................................. IV-35
1. Geology & Terrestrial Habitats .................................................................................................... IV-35
a) Soils................................................................................................................................................ IV-35
2. Water Resources ........................................................................................................................... IV-39
a) Streams .......................................................................................................................................... IV-39
b) Ponds ............................................................................................................................................. IV-41
c) Springs ........................................................................................................................................... IV-42
![Page 10: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/10.jpg)
Final Environmental Impact Statement
US 340 Improvement Study iii
d) Ground Water ............................................................................................................................... IV-42
e) Floodplains ................................................................................................................................... IV-44
f) Required Permits .......................................................................................................................... IV-45
3. Wetlands ....................................................................................................................................... IV-46
a) Project Impacts ............................................................................................................................. IV-47
4. Wildlife .......................................................................................................................................... IV-48
a) Threatened and Endangered Species .......................................................................................... IV-49
5. Visual Characteristics ................................................................................................................... IV-52
a) Existing Visual Environment ....................................................................................................... IV-52
b) Visual Impacts............................................................................................................................... IV-53
c) Mitigation ...................................................................................................................................... IV-59
6. Noise .............................................................................................................................................. IV-60
a) Characteristics of Noise................................................................................................................ IV-62
b) Measurement of Existing Noise Levels........................................................................................ IV-63
c) Predicted Existing Noise Levels ................................................................................................... IV-64
d) Traffic Noise Impact Analysis ...................................................................................................... IV-66
e) Potential Noise Abatement Measures ......................................................................................... IV-70
f) Construction Noise ....................................................................................................................... IV-73
7. Air Quality ..................................................................................................................................... IV-73
a) Carbon Monoxide.......................................................................................................................... IV-74
b) Mobile Source Air Toxics (MSAT) ................................................................................................ IV-75
c) Permits .......................................................................................................................................... IV-76
d) Climate Change ............................................................................................................................. IV-77
8. Hazardous Materials .................................................................................................................... IV-79
D. OTHER POTENTIAL IMPACTS ........................................................................................................... IV-82
1. Energy ........................................................................................................................................... IV-82
2. Construction Impacts ................................................................................................................... IV-82
3. Cumulative and Secondary Impacts ............................................................................................ IV-85
a) Secondary Impacts ....................................................................................................................... IV-85
b) Cumulative Impacts ...................................................................................................................... IV-88
4. Short-term Use versus Long-term Productivity ......................................................................... IV-89
5. Irreversible and Irretrievable Commitment of Resources ......................................................... IV-89
V. SECTION 4(F) EVALUATION ............................................................................................................................................... V-1
A. INTRODUCTION .................................................................................................................................. V-1
B. AFFECTED SECTION 4(F) PROPERTIES .......................................................................................... V-5
![Page 11: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/11.jpg)
Final Environmental Impact Statement
US 340 Improvement Study iv
1. Kabletown Rural Historic District ............................................................................................... V-5
a) Description ....................................................................................................................................... V-5
b) Potential Impacts ............................................................................................................................. V-6
c) Measures to Minimize Harm ........................................................................................................... V-7
2. Bullskin Run Rural Historic District............................................................................................ V-7
a) Description ....................................................................................................................................... V-7
b) Potential Impacts ............................................................................................................................. V-8
c) Measures to Minimize Harm ........................................................................................................... V-8
3. Village of Rippon Historic District ............................................................................................... V-8
a) Description ....................................................................................................................................... V-8
b) Potential Impacts ............................................................................................................................. V-9
c) Measures to Minimize Harm ........................................................................................................... V-9
4. Olive Boy Farm Section 4(f) Property ....................................................................................... V-10
a) Description ..................................................................................................................................... V-10
b) Potential Impacts ........................................................................................................................... V-10
c) Measures to Minimize Harm ......................................................................................................... V-11
5. Byrdland Section 4(f) Property .................................................................................................. V-11
a) Description ..................................................................................................................................... V-11
b) Potential Impacts ........................................................................................................................... V-12
c) Measures to Minimize Harm ......................................................................................................... V-12
6. Straithmore Section 4(f) Property ............................................................................................. V-13
a) Description ..................................................................................................................................... V-13
b) Potential Impacts ........................................................................................................................... V-13
c) Measures to Minimize Harm ......................................................................................................... V-14
7. Beverly Farm Section 4(f) Property .......................................................................................... V-14
a) Description ..................................................................................................................................... V-14
b) Potential Impacts ........................................................................................................................... V-15
c) Measures to Minimize Harm ......................................................................................................... V-15
8. Summit Point Battlefield ............................................................................................................. V-15
a) Description ..................................................................................................................................... V-15
b) Potential Impacts ........................................................................................................................... V-16
c) Measures to Minimize Harm ......................................................................................................... V-16
C. SECTION 4(F) EVALUATION SUMMARY ....................................................................................... V-17
1. Section 4(f) Properties .................................................................................................................. V-17
2. Build Alternates and Build Impacts to 4(f) Properties................................................................ V-18
![Page 12: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/12.jpg)
Final Environmental Impact Statement
US 340 Improvement Study v
3. Avoidance Alternatives ................................................................................................................. V-23
4. Minimization and Overall Harm (Macro-level Analysis) ............................................................ V-23
a) Ability to Mitigate Adverse Impacts ............................................................................................. V-24
b) Relative Severity of Remaining Harm .......................................................................................... V-24
c) Relative Significance of Each Property......................................................................................... V-27
d) Views of Officials with Jurisdiction ............................................................................................... V-27
e) Degree each Alternate Meets Purpose and Need ......................................................................... V-27
f) Adverse Impacts to Non 4(f) Resources ...................................................................................... V-27
g) Cost Differences ............................................................................................................................. V-28
D. SUMMARY .......................................................................................................................................... V-28
VI. LIST OF PREPARERS ............................................................................................................................................................ VI-1
VII. LIST OF AGENCIES, ORGANIZATIONS, AND PERSONS TO WHOM COPIES OF THIS STATEMENT ARE
SENT ......................................................................................................................................................................................................VII-1
VIII. COMMENTS AND COORDINATION ............................................................................................................................. VIII-1
A. INFORMATION WORKSHOP – SEPTEMBER 24, 2012 ................................................................ VIII-1
B. PUBLIC WORKSHOP/HEARING – JUNE 3, 2013 ......................................................................... VIII-1
C. PUBLIC WORKSHOP/HEARING – AUGUST 30, 2016 ................................................................. VIII-2
IX. INDEX .......................................................................................................................................................................................... IX-1
X. REFERENCES ............................................................................................................................................................................. X-1
![Page 13: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/13.jpg)
Final Environmental Impact Statement
US 340 Improvement Study vi
List of Exhibits
EXHIBIT I-1: HISTORIC RESOURCE IMPACTS ................................................................................................ I-15
EXHIBIT I-2: KABLETOWN RURAL HISTORIC DISTRICT .............................................................................. I-17
EXHIBIT I-3: BULLSKIN RUN RURAL HISTORIC DISTRICT .......................................................................... I-19
EXHIBIT I-4: SUMMIT POINT BATTLEFIELD ................................................................................................. I-21
EXHIBIT II-1: PROJECT VICINITY ................................................................................................................... II-21
EXHIBIT II-2: PROJECT STUDY AREA ............................................................................................................ II-23
EXHIBIT II-3: REGIONAL TRANSPORTATION NETWORK ........................................................................... II-25
EXHIBIT II-4: LOCAL TRANSPORTATION NETWORK .................................................................................. II-27
EXHIBIT II-5: LEVEL OF SERVICE .................................................................................................................. II-29
EXHIBIT II-6: AVERAGE DAILY TRAFFIC AND LEVEL OF SERVICE ............................................................ II-31
EXHIBIT II-7: EXISTING AND FUTURE LAND USE ........................................................................................ II-33
EXHIBIT II-8: LOCAL POINTS OF INTEREST ................................................................................................. II-35
EXHIBIT II-9: ACCIDENT TYPES .................................................................................................................... II-37
EXHIBIT II-10: ACCIDENT LOCATIONS AND TYPES BY SEGMENT ............................................................. II-39
EXHIBIT III-1: PROPOSED TYPICAL SECTION ............................................................................................. III-17
EXHIBIT III-2: BUILD ALTERNATE LOCATIONS .......................................................................................... III-19
EXHIBIT III-3: BUILD ALTERNATE 4 LOCATION ......................................................................................... III-21
EXHIBIT III-4: BUILD ALTERNATE 4A LOCATION ...................................................................................... III-23
EXHIBIT III-5: BUILD ALTERNATE 4B LOCATION ...................................................................................... III-25
EXHIBIT III-6: BUILD ALTERNATE 4C LOCATION ...................................................................................... III-27
EXHIBIT III-7: BUILD ALTERNATE 10A LOCATION .................................................................................... III-29
EXHIBIT III-8: BUILD ALTERNATE 10B LOCATION .................................................................................... III-31
EXHIBIT III-9: BUILD ALTERNATE 11 LOCATION ...................................................................................... III-33
EXHIBIT III-10: BUILD ALTERNATE 4 DESIGN ........................................................................................... III-35
EXHIBIT III-11: BUILD ALTERNATE 4A DESIGN ......................................................................................... III-37
EXHIBIT III-12: BUILD ALTERNATE 4B DESIGN ......................................................................................... III-39
EXHIBIT IV-1: KABLETOWN RURAL HISTORIC DISTRICT ......................................................................... IV-91
EXHIBIT IV-2: BULLSKIN RUN RURAL HISTORIC DISTRICT ...................................................................... IV-93
EXHIBIT IV-3: BULLSKIN RUN & KABLETOWN RURAL HISTORIC DISTRICTS ......................................... IV-95
EXHIBIT IV-4: SUMMIT POINT BATTLEFIELD ............................................................................................ IV-97
EXHIBIT IV-5: INDIVIDUAL HISTORIC RESOURCES .................................................................................... IV-99
EXHIBIT IV-6: FARMLAND SOILS ............................................................................................................... IV-101
EXHIBIT IV-7: WATER RESOURCES ............................................................................................................ IV-103
EXHIBIT IV-8: 100-YEAR FLOODPLAIN LIMITS ........................................................................................ IV-105
![Page 14: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/14.jpg)
Final Environmental Impact Statement
US 340 Improvement Study vii
EXHIBIT IV-9: STREAM AND WETLAND IMPACTS ................................................................................... IV-107
EXHIBIT IV-10: NOISE MONITORING LOCATIONS .................................................................................... IV-109
EXHIBIT V-1: KABLETOWN RURAL HISTORIC DISTRICT ........................................................................... V-31
EXHIBIT V-2: IMPACTS TO KABLETOWN RURAL HISTORIC DISTRICT ..................................................... V-33
EXHIBIT V-3: BULLSKIN RUN RURAL HISTORIC DISTRICT ........................................................................ V-35
EXHIBIT V-4: IMPACTS TO BULLSKIN RUN RURAL HISTORIC DISTRICT .................................................. V-37
EXHIBIT V-5: HISTORIC RESOURCES ........................................................................................................... V-39
EXHIBIT V-6: IMPACTS TO VILLAGE OF RIPPON HISTORIC DISTRICT ..................................................... V-41
EXHIBIT V-7: IMPACTS TO OLIVE BOY FARM PROPERTY .......................................................................... V-43
EXHIBIT V-8: IMPACTS TO BYRDLAND PROPERTY .................................................................................... V-45
EXHIBIT V-9: IMPACTS TO STRAITHMORE PROPERTY ............................................................................. V-47
EXHIBIT V-10: IMPACTS TO BEVERLY FARM PROPERTY .......................................................................... V-49
EXHIBIT V-11: SUMMIT POINT BATTLEFIELD ............................................................................................ V-51
EXHIBIT V-12: IMPACTS TO SUMMIT POINT BATTLEFIELD ...................................................................... V-53
List of Tables
TABLE I-1: COMPARATIVE SUMMARY ............................................................................................................ I-9
TABLE I-2: PUBLIC SURFACE WATERS ......................................................................................................... I-12
TABLE II-1: LOS FOR TWO-LANE HIGHWAYS ................................................................................................ II-7
TABLE II-2: LEVEL OF SERVICE (TWO-LANE HIGHWAY) ............................................................................ II-9
TABLE II-3: LOS FOR MULTILANE HIGHWAYS ........................................................................................... II-10
TABLE II-4: LEVEL OF SERVICE (MULTILANE HIGHWAY) ........................................................................ II-10
TABLE II-5: ACCIDENT RATES ...................................................................................................................... II-18
TABLE II-6: SEVERITY INDEX ....................................................................................................................... II-19
TABLE III-1: DESIGN CRITERIA ..................................................................................................................... III-6
TABLE III-2: RANK OF ALTERNATES .......................................................................................................... III-10
TABLE III-3: COMPARATIVE SUMMARY ..................................................................................................... III-15
TABLE IV-1: POPULATION CHARACTERISTICS ............................................................................................ IV-2
TABLE IV-2: POPULATION BY AGE GROUP AND MEDIAN AGE (2010) ...................................................... IV-3
TABLE IV-3: POPULATION PROJECTIONS .................................................................................................... IV-4
TABLE IV-4: EMPLOYMENT STATUS AND UNEMPLOYMENT RATES ........................................................ IV-5
TABLE IV-5: INCOME AND HOUSING CHARACTERISTICS ........................................................................... IV-6
TABLE IV-6: RELOCATIONS BY ALTERNATE ............................................................................................. IV-10
TABLE IV-7: LISTED & ELIGIBLE HISTORIC RESOURCES .......................................................................... IV-28
TABLE IV-8: DETERMINATION OF EFFECT ................................................................................................ IV-30
![Page 15: US 340 Final Environmental Impact Statement€¦ · Errata Sheet Final Environmental Impact Statement US 340 Improvement Study Page 1 of 5 List of edits between the signed SDEIS and](https://reader034.fdocuments.us/reader034/viewer/2022050715/5f1756a5ac332d5733108aa9/html5/thumbnails/15.jpg)
Final Environmental Impact Statement
US 340 Improvement Study viii
TABLE IV-9: SOIL TYPES BY ALTERNATE (JEFFERSON COUNTY, WV) .................................................... IV-36
TABLE IV-10: FARMLAND IMPACTS ........................................................................................................... IV-39
TABLE IV-11: STREAM CHARACTERISTICS ................................................................................................ IV-40
TABLE IV-12: STREAM IMPACTS ................................................................................................................. IV-41
TABLE IV-13: FLOODPLAIN IMPACTS ......................................................................................................... IV-45
TABLE IV-14: WETLAND IMPACTS BY ALTERNATE .................................................................................. IV-48
TABLE IV-15: VISUAL IMPACT RATING ...................................................................................................... IV-55
TABLE IV-16: NOISE ABATEMENT CRITERIA ............................................................................................ IV-61
TABLE IV-17: COMMON INDOOR AND OUTDOOR NOISE LEVELS ............................................................ IV-63
TABLE IV-18: TRAFFIC NOISE MODEL (TNM) VEHICLE CLASSIFICATION TYPES .................................. IV-65
TABLE IV-19: AMBIENT NOISE LEVELS ...................................................................................................... IV-66
TABLE IV-20: LEQ TRAFFIC NOISE LEVELS ................................................................................................ IV-68
TABLE IV-21: MAXIMUM PREDICTED CARBON MONOXIDE CONCENTRATIONS ................................... IV-75
TABLE IV-22: LIKELIHOOD TO ENCOUNTER HAZARDOUS MATERIALS ................................................. IV-80
TABLE V-1: COMPARATIVE SUMMARY OF SECTION 4(F) IMPACTS ON DISTRICTS ................................ V-25
TABLE V-2: COMPARATIVE SUMMARY OF INDIVIDUAL HISTORIC PROPERTY AND DISTRICT IMPACTS V-
26