US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.
-
Upload
elijah-holmes -
Category
Documents
-
view
214 -
download
0
Transcript of US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.
![Page 1: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/1.jpg)
US 25 Corbin to London
Citizens Advisory Committee Meeting #2
March 2012
![Page 2: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/2.jpg)
Project Limits End Project
Begin Project
![Page 3: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/3.jpg)
US 25 - Project Flow
1st Citizen Advisory Group meeting
1st Public Meeting
**2nd Citizen Advisory Group meeting**
3rd Citizen Advisory Group meeting
4th Citizen Advisory Group meeting
2nd Public Meeting5th Citizen Advisory Group meeting
6th Citizen Advisory Group meeting
Public Hearing
![Page 4: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/4.jpg)
1st Public Meeting
February 21st – Hunter Hills Elementary 77 Individuals Attended 20 Comment Sheets turned in Lots of comments on the maps Mostly Daily Users Nearly split Residential/Commercial
![Page 5: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/5.jpg)
Comment Sheet Summary
Majority of Comments Pertain to Safety Second Highest Concern Seems to be Traffic /
Delays Number of Entrances is also a concern Enhanced Tourism & Economic Development a
priority Trucks By-passing I75 Scales Only one seemed to oppose Project Several concerned by proximity of widening and
relocation of the roadway to another area
![Page 6: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/6.jpg)
Next Advisory Group Meeting
Introduce Concepts to Achieve Goals for Project Enhance Safety Reduce Traffic Delay Access Management (Entrances)
Morning or Afternoon? Possibly Longer Meeting
![Page 7: US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.](https://reader030.fdocuments.us/reader030/viewer/2022032702/56649ce55503460f949b2c72/html5/thumbnails/7.jpg)
Thank You!
Brad Gregory – Municipal Engineering [email protected]
David Fields – KY Transp0rtation Cabinet - [email protected]