City of La Crosse, South Avenue Green Bay Street to Ward Avenue La Crosse County WisDOT Project ID 1641-02-02 Public Involvement Meeting #2 US 14 Improvements March 7, 2017 La Crosse Central High School

Transcript of US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end...

Page 1: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

City of La Crosse, South Avenue Green Bay Street to Ward Avenue

La Crosse County WisDOT Project ID 1641-02-02

Public Involvement Meeting #2

US 14 Improvements

March 7, 2017 La Crosse Central High School

Page 2: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Purpose of Meeting

Review the purpose of the US 14/South Avenue project

Discuss past project efforts Introduce roadway improvement alternatives Gather information and input to help determine

preferred alternative

Purpose of Meeting

Page 3: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Overview Project Overview Green Bay St

Wes

t Ave

Ward Ave

Page 4: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Objectives

Improve safety along the corridor Remove left turns from

through traffic lanes Improve intersection

operations Address pavement needs Address accommodations

for bicycles and pedestrians

Project Purpose

Page 5: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Overview Project Purpose – Traffic Data Location

Updated 2014 Traffic Volume (vehicles/day)

Updated 2041 Forecast Volume (vehicles/day)

Green Bay Street to West Ave 15,900 18,100 West Avenue to 17th Street 24,800 28,100 17th Street to Ward Avenue 23,400 26,600

Volumes are too high for a 3-lane option

Page 6: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Improve Safety

200 crashes over 5 years (2009-2013) Intersection crashes Ward Avenue intersection flagged by WisDOT as a

safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes

Project Purpose – Crash Data

Page 7: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

No bike facilities 6 ped-bike crashes

Project Purpose – Bike-Ped Accommodations

Page 8: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Public Involvement Meeting #1 – November 2014 Community Advisory Group Met twice – December 2014 and February 2015 Discussed needs, priorities, and a preliminary range of

improvement alternatives Coordination with local officials and City of La

Crosse Multiple meetings Worked on developing/refining alternatives

Past Project Efforts

Page 9: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Discussion items with City Bike accommodations Lane widths – narrow vs. desirable Intersection control – signals vs. roundabouts Feasibility of side street closures Raised median or TWLTL Minimize impacts to adjacent properties

Past Project Efforts

Page 10: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

City’s separate study utilizing Toole Design Group to look at land use, road linkages, and traffic issues along US 14/South Avenue Representative from WisDOT will participate in study Study will proceed concurrently with WisDOT project Results will be considered by WisDOT in selecting

preferred alternative, along with input from the public and Community Advisory Group

Current City Effort

Page 11: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Lane widths 10.5’-11’ minimum 11’-12’ desirable

Median 2’-3’ with roundabouts 10’ with left turn lanes

TWLTL 13’-14’ with left turn lanes at intersections Similar to US 14/ South Avenue south of Ward Avenue

Roundabout and signalized intersection options

Improvement Alternatives

Page 12: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Refined range of alternatives Alt 1 – Minimum width, with roundabouts Alt 2 – Narrow median, with roundabouts Alt 3 – Two-way left turn lane Alt 4 – Raised median with left turn lanes

Can mix and match alternatives on different sections of roadway

Can use any bike concept with each alternative Roundabout or signalized intersection control

options

Improvement Alternatives

Page 13: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Roundabout option Roundabouts at West Ave., 16th Street, and Ward Ave. Option for additional roundabout at 14th Street or 15th

Street • Not warranted from a traffic perspective • Requires additional displacements, costs, potential park impacts

Other side streets are right in/right out Signalized intersection option Signals at West Ave. and Ward Ave. Signals not currently warranted at other locations Requires some side street closures

Improvement Alternatives

Page 14: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Possible Improvements Improvement Alternatives

Alternative 1 – Minimum width with roundabouts alternative

(no bikes)

Page 15: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Possible Improvements Improvement Alternatives

Alternative 2 – Narrow median with roundabouts alternative

(multi-use path)

Page 16: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Possible Improvements Improvement Alternatives

Alternative 3 – Two-way left turn lane alternative

(with bike lanes)

Page 17: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Possible Improvements Improvement Alternatives

Alternative 4 – Raised median with left turn lanes alternative

(with bike lanes)

Page 18: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Impacts for alternatives as shown on displays

Improvement Alternatives

Alternative R/W Width Approx. Number of

Displacements Minimum width 66’ 8 Narrow median 76.5’ 21 Two-way left turn lane 91’ 31 Raised median with left turn lanes 91’ 31

R/W width and number of displacements depends on bike accommodation concept used

Page 19: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Bike accommodation concepts – No bike accommodations

Improvement Alternatives

Page 20: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Bike accommodation concepts – shared outside lanes

Improvement Alternatives

Page 21: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Bike accommodation concepts – off road, multi-use path (one or both sides)

NOT RECOMMENDED

Improvement Alternatives

Page 22: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process Improvement Alternatives Concerns with off

road, multi-use paths Cross-street and

driveway conflicts Encouragement of

wrong-way bicycling

Page 23: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process Improvement Alternatives Concerns with off

road, multi-use paths Visibility/

applicability of traffic controls

Maintenance and limits on space

Conflicts with pedestrians

Page 24: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Bike accommodation concepts – on road bike lanes

Improvement Alternatives

Page 25: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Bike accommodation concepts – separated/ buffered, on road bike lanes

Improvement Alternatives

Page 26: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Process

Additional R/W width required for bike options

Improvement Alternatives

Bike Option Additional R/W width req’d No bike accommodations 0’ Shared outside lanes 6’ Off road, multi-use path (1 side) 6.5’ On road bike lanes 10’ Off road, multi-use path (both sides) 13’ Separated/buffered on road bike lanes 13’

Additional R/W width requires additional displacements and costs

Page 27: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Project Schedule Project Schedule Public involvement meeting #2 (present alternatives) .......................... March 7, 2017 Community advisory group meeting #3 (discuss impacts and preferred alternative) ........................................ Spring 2017 Local Officials meeting #4 (discuss impacts and preferred alternative) ......................... Spring/Summer 2017 Public involvement meeting #3 (discuss impacts and preferred alternative) ..................................... Summer 2017 Environmental document (available for public review) .............. Spring/Summer 2018 Preliminary plans ...................................................................................... Spring 2019 Right of way plat ....................................................................................... Spring 2019 Final plans ............................................................................................. Summer 2021 Construction begins .................................................................................. Spring 2022

Page 28: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

Contact Information

Darin Blang, PE OTIE Project Manager

5100 Eastpark Blvd., Suite 300 Madison, WI 53718

(608) 243-6475 [email protected]

Contact Information

Page 29: US 14 Improvements€¦ · 2017-03-07  · safety concern; 50 crashes over 5 years 77% are rear end or right angle crashes . Project Purpose – Crash Data No bike facilities 6 ped-bike

29

Your input is important!

Questions