urb006ci
-
Upload
marshall-bravestar -
Category
Documents
-
view
220 -
download
0
Transcript of urb006ci
![Page 1: urb006ci](https://reader030.fdocuments.us/reader030/viewer/2022021317/577cd4ce1a28ab9e78992967/html5/thumbnails/1.jpg)
8/13/2019 urb006ci
http://slidepdf.com/reader/full/urb006ci 1/2
![Page 2: urb006ci](https://reader030.fdocuments.us/reader030/viewer/2022021317/577cd4ce1a28ab9e78992967/html5/thumbnails/2.jpg)
8/13/2019 urb006ci
http://slidepdf.com/reader/full/urb006ci 2/2
(1) foot vertical should consider surface measurements to calculate areas forpayment purposes.
(2) Methods 2 and 3 The procedures that will be used to determine the amount ofwork satisfactorily completed for progress payment should be identified in
Section 7.
Options may include:
- an on-site agreed-to estimate of the percent of work satisfactorilycomplete at time of progress payment preparation; or
- require the contractor to provide invoices (Method 3) to support hisincurred costs to satisfactory complete work at time of progress payment;or
- other suitable and fair methods, one of which could be related to theconstruction schedule.
When specifications are prepared electronically and all but one method aredeleted for use in a contract specification, delete "All Methods The followingprovisions apply to all methods of measurement and payment.” and left justify theremaining text.