July 6, 2007July 6, 2007Uran Plant, UranUran Plant, Uran
![Page 3: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/3.jpg)
CONTENTS
Overview of ONGC
Uran Plant
Performance
Certifications
Health, Safety & Environment
Security
Corporate Social Responsibility
![Page 4: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/4.jpg)
Overview of ONGC
Group of Companies
![Page 5: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/5.jpg)
![Page 6: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/6.jpg)
![Page 7: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/7.jpg)
![Page 8: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/8.jpg)
![Page 9: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/9.jpg)
![Page 10: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/10.jpg)
![Page 11: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/11.jpg)
![Page 12: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/12.jpg)
![Page 13: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/13.jpg)
![Page 14: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/14.jpg)
![Page 15: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/15.jpg)
![Page 16: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/16.jpg)
![Page 17: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/17.jpg)
![Page 18: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/18.jpg)
![Page 19: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/19.jpg)
OIL CONTRIBUTION OF ONGC
ONGC81.5%
OIL10.0%
PVT / JV8.5%
![Page 20: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/20.jpg)
GAS CONTRIBUTION OF ONGC
ONGC79.2%
OIL7.0%
PVT / JV13.8%
![Page 21: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/21.jpg)
LPG CONTRIBUTION OF ONGC
Others82.0%
ONGC18.0%
![Page 22: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/22.jpg)
![Page 23: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/23.jpg)
![Page 24: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/24.jpg)
Possible through strong Technical Competency, Financial Health & HSE standardsPossible through strong Technical Competency, Financial Health & HSE standards
![Page 25: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/25.jpg)
24”
26”
30”
26”
URAN
210 km
85 km
MNW
Heera
![Page 26: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/26.jpg)
OVERVIEW OF URAN PLANT
![Page 27: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/27.jpg)
URAN PLANT : FIRST OF ITS KIND
First:• Gas based LPG Plant in India.• Co-generation plant in the country.• C2C3 plant of the country feeding to first gas
cracker of IPCL.• Flare Gas Recovery Unit (FGRU) for zero
emission.
![Page 28: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/28.jpg)
PERFORMANCEPERFORMANCE
![Page 29: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/29.jpg)
CRUDE OIL
ASSOCIATED GAS
URAN
• STABILISATION OF CRUDE OIL & SUPPLY TO CONSUMERS
• PRODUCTION & DISPATCH OF VALUE ADDED PRODUCTS
• SUPPLY OF NATURAL GAS
• HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT
FUNCTIONS
![Page 30: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/30.jpg)
13 M
MS
CM
D
4745 MMSCM
800
TP
D
2,80,000TPA
4105
5 T
PD
15
MMTPA
TYPICAL INPUT FROM OFFSHORE
GASCRUDE OIL CONDENSATEONE OF THE LARGEST INTEGRATED OIL & GAS PROCESSING COMPLEX OF INDIA
![Page 31: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/31.jpg)
GASSWEETENING
UNIT
SLUGCATCHER
LPGPLANT
C2C3
PLANT
CONDENSATEFRACTIONATING
UNIT
CSU OFFGASCOMPRESSOR
PRODUCED WATER TO ETP - MINAS
CRUDE OIL TO STORAGE
NAPHTHA TO STORAGE
LPG TO STORAGE
SSV
LEF
ACID GAS
GAS TO CONSUMERS
GAS
CRUDESTABILISATION
UNIT
C2C3 TO
STORAGE
Crude Oil
GAS
PROCESS
![Page 32: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/32.jpg)
BH48%
OTHER FIELDSOF ONGC
28%
JVC13%
URAN HANDLES ABOUT 50% OIL PRODUCTION OF THE COUNTRY
OIL CONTRIBUTION : URAN
OIL INDIA11%
TANKER (SBM)8%
URAN92%
![Page 33: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/33.jpg)
URAN21%
HAZIRA56%
OTHER FIELDSOF ONGC
28%
HANDLES 21% GAS PRODUCTION OF ONGC
GAS CONTRIBUTION : URAN
![Page 34: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/34.jpg)
URAN PLANT CONTRIBUTES
• LPG for 1 lakh LPG Cylinders per day. • CNG for 1.5 lakh auto / taxis per day in
Mumbai.• Power generation of 24x700 MW per day by
MSEB• Poly Ethylene & Poly Propylene by Reliance at
Nagothane - total feed by ONGC.• Mahanagar gas is also supplied from Uran
Plant of ONGC.
![Page 35: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/35.jpg)
SALES REVENUE OF PRODUCTS
0
200
400
600
800
1000
1200
2003-04 2004-05 2005-06 2006-07 Year
Rev
enu
e (R
s. In
Cro
re)
LPG C2-C3 Naphtha
![Page 36: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/36.jpg)
PRODUCTDISTRIBUTION
![Page 37: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/37.jpg)
CRUDE OIL DISTRIBUTION
JAWAHARDWEEP
URANPLANT
TROMBAYTERMINAL
![Page 38: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/38.jpg)
GAS CONSUMERS NETWORK
URANPLANT
TROMBAYTERMINAL
![Page 39: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/39.jpg)
VALUE ADDED PRODUCTS
LEGEND
LPGNAPHTHAC2C3
IOTLDOMESTIC & EXPORT
URANPLANT
TROMBAYTERMINAL
![Page 40: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/40.jpg)
CERTIFICATIONSCERTIFICATIONS
![Page 41: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/41.jpg)
CERTIFICATIONS
Certifications (Recertified) Validity
ISO 9001:2000 MARCH 2009
ISO 14001:2004 MARCH 2009
OHSAS 18001:1999 MARCH 2009
CERTIFICATE OF FITNESS AUGUST 2008
![Page 42: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/42.jpg)
HEALTH, SAFETY &ENVIRONMENT
![Page 43: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/43.jpg)
INTERNATIONAL HSE STANDARDS
• ISO-14001 for Environment• OHSAS-18001 for Occupational Health &
Safety• International Safety Rating System (ISRS)
Uran Plant has latest version of these international standards
![Page 44: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/44.jpg)
RISK CONTROL• Hazards and risks identified.• Risks and hazards evaluated, and control
measures evolved for risk reduction.• Compliance to Legal Requirements of Govt. of
Maharashtra & Govt. of India• Systems surveillance audits by Det Norske Veritas
(DNV) twice in the year.• Periodic internal audits.• Surprise audits by OISD, Govt. of India;• External Safety Audits as per Department of
Industrial Safety & Health, Govt. of Maharashtra
![Page 45: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/45.jpg)
INTERNATIONAL SAFETY RATING SYSTEM (ISRS)
• ISRS is international system for hydrocarbon industry.
• Quantifies the overall system pertaining to quality, health, safety, environment & security in terms of level 1-10.
• Rolled out new ISRS 7th edition at Uran Plant in 2006-07.
![Page 46: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/46.jpg)
ASSOCIATED RISKS & HAZARDS
• Hydrocarbons are highly inflammable, and easily catch fire.
• Unique geographical location of Uran Plant.• Intrusion of terrorist from periphery.
RISKS ARE INEVITABLE, THEY ARE TO BE REDUCEDRISKS ARE INEVITABLE, THEY ARE TO BE REDUCED
![Page 47: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/47.jpg)
EmergencEmergency y PreparednessPreparedness
Periodic Checking Of Fire & Safety Equipment
Disaster Management Plan
Mock Drills
24 hrs Manned Fire Stations
Mutual - Aid
Fire Order
Process Emergency Manual
Life Saving Equipment
Over head Foam Storage
Tank.
Fire Fighting Equipments
![Page 48: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/48.jpg)
Fire Pumps with Jockey
Fire Tenders
Hollow Jet Monitors
DCP Trolleys
Sprinkler Systems
Halon Flooding
FIXED MOBILE
Fire Fighting
Drenchers Fire Header Network
Hydrants & Monitors.
Raw Water Storage
CO2 Flooding
Fire Extinguishers
FoamPourers
Fire Water Storage
System
RimSeal.
HVLR
![Page 49: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/49.jpg)
ENVIRONMENT PROTECTION
• Abide by all applicable regulatory legislations including Factory Act, EPA, Water Act etc.
• Real Time Monitoring Ambient Quality at 3 stations.
• Real Time Monitoring Stack emissions at 2 stations.
![Page 50: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/50.jpg)
ENVIRONMENT PROTECTION
• Treated Effluent Water tested at PPCL to ensure MPCB requirements.
• Water discharge through closed conduit system at sea.
• Noise level monitoring in noise prone areas of the plant.
• Hazardous Waste Disposal through M/S Mumbai Waste Management, Taloja.
![Page 51: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/51.jpg)
SECURITY
![Page 52: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/52.jpg)
FIBRE OPTIC BASED ELECTRONICPERIMETER PROTECTION SYSTEM
![Page 53: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/53.jpg)
SECURITY MEASURES
• Entire Plant is enclosed with stone masonry compound wall of 2.8 Meters in height and 6.15 KM in length.
• Chain Link Fencing from Dronagiri Bhavan to Helipad has been erected outside the compound wall.
• Concertina Coil has been erected on top of wall.
• Watch Towers 12 Nos.
![Page 54: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/54.jpg)
SECURITY MEASURES
• Patrolling inside and outside carried out by road.
• Perimeter Intrusion Detection System manned by CISF round the clock.
![Page 55: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/55.jpg)
CORPORATE SOCIAL
RESPONSIBILITY
![Page 56: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/56.jpg)
DIRECT & INDIRECT EMPLOYMENT GENERATION (URAN)
REGULAR REGULAR SECONDARY SECONDARY WORKFORCEWORKFORCE
CASUAL / CASUAL / DAILY WORKERSDAILY WORKERS
I - 452I - 452 II - 044II - 044 III - 115III - 115 IV - 105IV - 105 TOTAL - 716TOTAL - 716
III & IV – 220III & IV – 220Most of staff personnel are Most of staff personnel are from around Uranfrom around Uran
390390
(Mostly are Locals)(Mostly are Locals) Around 300 / dayAround 300 / day
(Mostly are through Local (Mostly are through Local Contractors)Contractors)
Nagoan, Nagoan, Mhatvali, & Mhatvali, & ChhanjeChhanje
PanvelPanvel OthersOthers TotalTotal
198198 4141 7676 315315
Employment to PAP’s (Distt. Raigad)Employment to PAP’s (Distt. Raigad)
![Page 57: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/57.jpg)
![Page 58: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/58.jpg)
CORPORATE SOCIAL RESPONSIBILITY
2003-042003-04 2004-052004-05 2005-06 & 2006-072005-06 & 2006-07
*Mega Eye *Mega Eye Operation CampOperation Camp
*Blood Donation *Blood Donation
CampCamp
*Weekly Medical *Weekly Medical
CampCamp
*Weekly Medical *Weekly Medical
CampCamp
*Ambulance for *Ambulance for
Nagoan & Mhatvali Nagoan & Mhatvali
*Equipment For *Equipment For
(School Lab/ Local (School Lab/ Local
Hospital)Hospital)
*Weekly Medical *Weekly Medical CampCamp
*Public Toilets and *Public Toilets and
Rain Water Drain - Rain Water Drain -
NagoanNagoan
*Crematorium *Crematorium RepairRepair
*Financial *Financial Assistance to Assistance to welfare unit. welfare unit.
Tax paid to Panchayats Every Year
Nagoan VillageNagoan Village Rs 9,65,807/=Rs 9,65,807/=
Chhanje VillageChhanje Village Rs 6,54,545/=Rs 6,54,545/=
Mhatvali VillageMhatvali Village Rs 4,32,968/=Rs 4,32,968/=
![Page 59: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/59.jpg)
PROPOSED DEVELOPMENT (2007-08)
• Special Projects for Nagoan, Mhatwali & Chhanje Villages & Indira Gandhi Rural Hospital, Uran.
• Pune based NGO-BAIF has been assigned the project to initiate development process in the villages of Nagoan, Mhatvali and Chhanje through Self Help Groups (SHG) covering Women, Youth and Others.
• One Mega Eye and two Health Camps in addition to Weekly Medical Camps.
![Page 60: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/60.jpg)
Thank YouThank YouLet us Make Tomorrow BrighterLet us Make Tomorrow Brighter
![Page 61: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/61.jpg)
CONTRIBUTION TOEXCHEQUER - INDIRECT TAXES (URAN)
30
7.6
5
18
6.4
9 27
5.2
8
21
5.9
3
0
50
100
150
200
250
300
350
2003-04 2004-05 2005-06 2006-07
Year
Rs
. In
Cro
re
![Page 62: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/62.jpg)
FINANCE
![Page 63: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/63.jpg)
PRODUCT SALES
0
100
200
300
400
500
600
700
2003-04 2004-05 2005-06 2006-07
Year
Qu
anti
ty (
TM
T)
LPG C2-C3 Naphtha Export
![Page 64: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/64.jpg)
GAS SALES
3597
3696
3523
3725
3000
3200
3400
3600
3800
4000
2003-04 2004-05 2005-06 2006-07
Year
Qu
anti
ty (
MM
SC
M)
![Page 65: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/65.jpg)
TOTAL SALES REVENUE OF VAP
630.45
504.52
349.84358.07
0
100
200
300
400
500
600
700
2003-04 2004-05 2005-06 2006-07
Year
Rve
nu
e (M
illio
n U
S$)
![Page 66: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/66.jpg)
DETAILS OF FIXED ASSETS
120.
62
129.
6
141.
75
155.
86
47.56 37.9245.85
127.64
0
50
100
150
200
250
300
2003-04 2004-05 2005-06 2006-07Year
Mill
ion
US
$
Accumulated Depreciation Net Book Value
![Page 67: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/67.jpg)
PROJECTS/WORKS
BLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million
US$
ADDITIONAL PROCESS UNIT(GSU, LPG & CFU)
1110 249.1
REPLACEMENT OF PROPANE GAS COMPRESSOR OF LPG-I & LPG-II
120 26.9
ADDITIONAL LEAN GAS COMPRESSOR 120 26.9
VAP STORAGE SYSTEM AT NAVGARH 70 15.7
SULPHUR RECOVERY UNIT 23 5.2
TOTAL 1443 323.8
PROJECTS ENVISAGEDDURING 2007-09
![Page 68: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/68.jpg)
HSE MEASURES
Audio-visual safety film for visitors & new employees has been introduced
New on-line near-miss reporting system established and encouraged
Hazardous solid waste Disposal through Mumbai Waste Management Limited at Taloja.
Monthly Loss Control Tour carried out by Head Uran Plant.
All the emissions are well within the stipulated limits of statutory agencies.
![Page 69: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/69.jpg)
1SeriousOr Major
Injury
10Minor Injury
30Property Damage
Accidents
600Incidents with no Visible
Injury or Damage
INC
IDE
NT’
SA
CC
IDE
NTS
SAFETY PYRAMID
![Page 70: Uran plant presentation jounalist (6-7-2007)](https://reader031.fdocuments.us/reader031/viewer/2022012918/555212d6b4c905852b8b5261/html5/thumbnails/70.jpg)
FIRE FIGHTING SYSTEM
• Water sprinkler system• Drencher system• Foam system• Rim seal fire protection• High Volume water monitor for Gas Processing Area.• High Volume Long Range water cum foam monitors for
Tank Farm Area• HALON system • CO2 flooding system• Fire alarm system• Hydrants and monitors• First Aid fire fighting system