NOTANGGALURAIAN KEGIATAN

102-Mar-15Observasi / Genba Area UBC ( Pre-Treatment)

203-Mar-15Review Genba area Pre-TreatmentOven PBS areaPengenalan Equipment

304-Mar-15Preventive Maintenance Pre-Treatment Control Panel 1&2

405-Mar-15Genba Pre-Treatment AreaCheck Sheet Area UBCProblem List Up

506-Mar-15Check Sheet Temperatur Oven di Control Panel OvenGenba Diaphragm Pump.

609-Mar-15Pengenalan OHCRTO Preventive Maintenance Temperature CheckPengenalanUF Modul E-Coat

710-Mar-15Preventive Maintenance Oven Pre-TreatmentPreventive Maintenance RTO panel

811-Mar-15Genba UPC AreaPrimer, Base, Clear.Catrid System & Mixing Room Supply Cat

912-Mar-15Training QCC & 7 Tool bersama memberGenba Wax Final sampai PBS (Paint Body Storage)

1013-Mar-15Preventive Maintenance Oven Pre-Treatment panel Check Sheet

1116-Mar-15Check Sheet Jig Cleaning Control PanelTrial Jig Cleaning Tank

1217-Mar-15Preventive Maintenance OHCCheck Sheet Pre-Treatment Equipment (Pompa, Heat-Exchanger )

1318-Mar-15Workshop ProjectMembuat Rangka DollyMembuat Rangka untuk Ruangan Cleaning Dolly

1419-Mar-15Melanjutkan Workshop Project

1520-Mar-15Finishing Workshop ProjectMenyusun RangkaMembantu Membuat Rangka

1623-Mar-15Check Sheet RTO Control PanelCleaning area OvenCleaning Storage

1724-Mar-15Check Sheet Pre-Treatment Control PanelCheck Sheet Pre-Treatment Equipment

1825-Mar-15Trial Jet Cleaner di Jig Cleaning AreaAnalisa Jig Cleaning Control Panel.

1926-Mar-15Check Sheet Pre-Treatment AreaGenba tentang Pompa Diafragma.

2027-Mar-15

2130-Mar-2015

2231-Mar-2015