February 17, 2012
![Page 2: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/2.jpg)
• Compare our results with RiverRock 2009 and 2010 findings.
• Measure selected gases in near-space conditions.
• Survey inorganic and organic aerosols in near-space conditions.
Mission Overview
![Page 3: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/3.jpg)
Functional Block Diagram
Power2x9V Supply
Batteries
G-Switch
RBF (Wallops)
5V Regulator
X / Y Accelerometer
Z Accelerometer
Temperature Sensor
AVR Board
AirCore Board
Flash Memory
6 channel ADC
Control Circuit (MOSFETS)
AVR Microcontroller
ADC
Intake Solenoid Valves
Bernoulli Exhaust At the rocket
Intake Solenoid Valve
Nano-Filters Sequential Controlled
Valves
Exhaust Solenoid
Valve
Data
Airflow
Power
Interface
RAM Air Intake from Outside of the
Rocket
Gas Semiconductor
Sensor 5
Gas Semiconductor
Sensor 3
Gas Semiconductor
Sensor 1
2x9 V Supply
Gas Semiconductor
Sensor 2
Gas Semiconductor
Sensor 4
Gas Semiconductor
Sensor 6
![Page 4: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/4.jpg)
Faculty Support:
Team Members
Vladimir Makarov
Geraldo Morell
Gladys Muñoz
Benjamin Bolaño
Oscar Resto
• Management• Management• Management
• Management
Student Management:
Team Leader: Desiree Rodriguez
Secretary: Ivan Rivera
Schedule Manager: Jose Castrillo
Technical Support: Orlando X. Nieves
![Page 5: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/5.jpg)
Organizational Chart
Rocksat C 2012Team Organization
Ivan Rivera (Secretary)
Alvaro Gracia(Team Member)
Sergio Alegre(Team Member)
Lizmar Cerezo(Team Member)
Pedro MeléndezSoftware Technical
Leader
Jose Castrillo (Timekeeper)
Elmo Rodriguez(Team Member)
Jose Iglesias(Team Member)
Nina Cordero(Team Member)
Gladys Muñoz(Faculty Support)
Desiree Rodriguez (Team leader)
Jaime Vaquer(Team Member))
Jose Ruiz(Team Member)
Luis Rosario(Team Member)
Samalis SantiniTeam Member
Sybelle Serrano (Team Member))
Oscar A. Resto(Team Member)
Beatriz Peraza(Team Member)
Joel Delgado(Team Member)
Oscar Muniz(Team Member)
Oscar Resto (Mentor/PI)
Graciela Rivera (Team Member)
Nicolle Canales(Team Member)
Camille Lupianez(Team Member)
Marianne Marin(Team Member))
![Page 6: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/6.jpg)
Team Picture
![Page 7: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/7.jpg)
Payload Assessment
![Page 8: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/8.jpg)
• As of February 14 we are on time with our schedule, even though we haven’t done the semiconductor sensor tests scheduled for February 7. We plan on doing this on February 21.
• We tested the computer and interface.
Schedule Update
![Page 9: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/9.jpg)
Subsystem Overview
• Layer #1: Semiconductor Sensors’ Board• Layer #2: First and second Battery Filters’
Subsystem• Layer #3: Third Battery Filter and Manifold’s
Sensor Subsystem• Layer #4: Interface and AVR Board’s Subsystem• Layer #5: Power Plate
![Page 10: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/10.jpg)
Semiconductor Sensors’ Board Subsystem (Layer #1)
![Page 11: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/11.jpg)
First and Second Battery Filters’ Subsystem (Layer #2)
![Page 12: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/12.jpg)
Third Battery Filter and Manifold’s Sensor Subsystem (Layer #3)
![Page 13: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/13.jpg)
Interface and AVR Boards’ Subsystem (Layer #4)
![Page 14: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/14.jpg)
Battery Plate Subsystem (Layer #5)
![Page 15: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/15.jpg)
• We have successfully tested the AVR computer.
• We have two computers, one for flight and a spare one. They both work perfectly.
• We also have a third one that need minor repairs.
AVR Subsystem Update
![Page 16: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/16.jpg)
AVR Subsystem Test
![Page 17: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/17.jpg)
Two out of three computers worked perfectly
The third one needs some minor repairs
Results
![Page 18: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/18.jpg)
• We are going to work with each subsystem separately to ensure its functionality.
• We are going to clean and assemble the subsystems in their proper layers after the disassembly of the payload.
•
Plan for Subsystem Integration
![Page 19: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/19.jpg)
Lessons Learned
- While testing the AVR computer we realized that we weren’t connecting the cables correctly. Therefore we couldn’t program the computer. That problem has been solved.
![Page 20: UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f465503460f94c683aa/html5/thumbnails/20.jpg)
• We are on schedule and working to have everything done.
• There is a team training in the usage of the Scanning Electron Microscope to analyze the samples of RockSat 2009-2010 and 2011-2012 (upcoming flight).
Conclusion