S upporting an energy-service per- formance contractor, McKenney’s developed and installed several energy conservation measures (ECM)— including new domestic hot water (DHW), heating hot water (HHW) and HVAC systems. THE CHALLENGE The facilities had existing steam boiler plants, chillers and HVAC equipment that had to remain operational during the ECM upgrades. A plan was needed to tie in the new systems without incurring service interruptions in high security, limited access work areas. THE SOLUTION During project development, McKenney’s provided design/assist services to advance a phasing plan to meet facility requirements and avoid service interruptions. Temporary services were provided when facility interrup- tions were unavoidable. Components for the DHW, HHW systems and rooftop units for the HVAC systems were prefabricated—including boiler/pump skids that could be quickly installed —to minimize the team’s time on premise. THE RESULTS McKenney’s installed the ECMs with minimal downtime and increased HVAC performance levels while reducing energy costs. Startup, commissioning and owner training resources led to a clean project close out. Upgrades Paid for by Energy Savings PROJECT NAME Performance Contract Steam Decentralization and HVAC Replacement PROJECT LOCATION North Carolina PROJECT TEAM Owner: North Carolina Department of Corrections Prime Contractor: NORESCO, LLC Engineer: BWA Engineering PA Turnkey Design Builder: McKenney’s, Inc. SPECIALIZATIONS Design/Assist Energy Management Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS Performance Contractor Government The content of this document is not intended as an endorsement. www.mckenneys.com © 2015 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Transcript of Upgrades Paid for by Energy Savings

Supporting an energy-service per-formance contractor, McKenney’s developed and installed several

energy conservation measures (ECM)—including new domestic hot water (DHW), heating hot water (HHW) and HVAC systems.

The ChallengeThe facilities had existing steam boiler plants, chillers and HVAC equipment that had to remain operational during the ECM upgrades.

A plan was needed to tie in the new systems without incurring service interruptions in high security, limited access work areas.

The SoluTionDuring project development, McKenney’s provided design/assist services to advance a phasing plan to meet facility requirements and avoid service interruptions. Temporary services were provided when facility interrup-tions were unavoidable. Components for the

DHW, HHW systems and rooftop units for the HVAC systems were prefabricated—including boiler/pump skids that could be quickly installed —to minimize the team’s time on premise.

The ReSulTSMcKenney’s installed the ECMs with minimal downtime and increased HVAC performance levels while reducing energy costs. Startup, commissioning and owner training resources led to a clean project close out.

Upgrades Paid for by Energy SavingsPRojeCT name

� Performance Contract Steam Decentralization and HVAC Replacement

PRojeCT loCaTion

� North Carolina

PRojeCT Team

� Owner: North Carolina Department of Corrections

� Prime Contractor: NORESCO, LLC

� Engineer: BWA Engineering PA

� Turnkey Design Builder: McKenney’s, Inc.

SPeCializaTionS

Design/Assist

Energy Management

Pipe Shop Prefab

Sheet Metal Shop Prefab

maRkeTS

� Performance Contractor

� Government

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2015 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214