Updated Master Plan for Water Recycling Centers 2 Historic sewerage systems 1901: Mitchell Lake...
Transcript of Updated Master Plan for Water Recycling Centers 2 Historic sewerage systems 1901: Mitchell Lake...
Updated Master Updated Master pPlan for Water Recycling Centers
pPlan for Water Recycling CentersRecycling CentersRecycling Centers
June 30, 2010June 30, 2010June 30, 2010June 30, 2010
Steve ClouseChief Operating Officer
Page 2
Historic sewerage systems1901: Mitchell Lake1901: Mitchell Lake
1933: Rilling Road1933: Rilling Road
1894 collection system
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 3
I-10
Medio Creek WRC
Dos Rios WRC
Leon Creek WRCMajor andMinor I 10
LeonCreek
SaladoCreek
HelotesCreek
Dos Rios WRCMinorFacilities of the 1990s
Salado Creek WRC
OlmosCreek
410
1604Major FacilitiesMajor Facilities
LLD RiD Ri
SA Ranch
410
MedioCreek
MedioMedioSaladoSalado
LeonLeonDos RiosDos RiosCulebra
NSISD
90CalaverasLake
Medio Creek WRCMinor FacilitiesMinor Facilities
MedinaRiver
BraunigLake
Mitchell Lake
Leon Creek WRCSalado Creek WRC
SSISDSSISDNSISDNSISD
SA RanchSA RanchCulebraCulebra
SS SJune 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers 37
San AntonioRiver
1604
Dos Rios WRC
N0
MILES
5 10
SSISD
Page 4
I-10
FacilityConsolidations
Medio Creek WRC
Dos Rios WRC
Leon Creek WRC
I 10
LeonCreek
SaladoCreek
HelotesCreek
Consolidationsand
Eliminations
Dos Rios WRC
Salado Creek WRC
OlmosCreek
410
1604• All minor facilities eliminated
• Salado/Dos Rios
SA Ranch
410
MedioCreek
Salado/Dos Rios sewersheds consolidated and Salado facility eliminated
Culebra
NSISD
90CalaverasLake
Medio Creek WRCSalado transfer lineSalado transfer line
eliminated
• Biosolids transfers from Medio/Leon consolidate all
MedinaRiver
BraunigLake
Mitchell Lake
Leon Creek WRC
SS S
Salado Creek WRC
solids processing at Dos Rios
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers 37
San AntonioRiver
1604
N0
MILES
5 10
Dos Rios WRCSSISD
Page 5
I-10Future
Medio Creek WRC
Dos Rios WRC
Leon Creek WRC
I 10
LeonCreek
SaladoCreek
HelotesCreek
FutureService Areas
Dos Rios WRC
OlmosCreek
410
1604
410
MedioCreek
90CalaverasLake
Area to be added by
MRSO
Project includes diversion of some flow
from Leon service MedinaRiver
BraunigLake
Mitchell Lake
MRSO area to Dos Rios
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers 37
San AntonioRiver
1604
N0
MILES
5 10
Page 6
SAWS' Total Effluent Volumes
250,000Effluent Volumes by Year, 1935 - 2009
200,000
,
acre
100,000
150,000acrefeet
0
50,000
35 40 45 50 55 60 65 70 75 80 85 90 95 00 05
193
194
194
195
195
196
196
197
197
198
198
199
199
200
200
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 7
How far can conservation take us?
7,000,000 225
5,000,000
6,000,000
150
175
200
3,000,000
4,000,000
100
125
150watercustomer
population
1,000,000
2,000,00050
75
projected water customers
0
1,000,000
1980 1985 1990 1995 2000 2005 2010 2015 2020 20250
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 8
How far can conservation take us?
7,000,000 225
gpcd
5,000,000
6,000,000
150
175
200
actual gpcd
3,000,000
4,000,000
100
125
150watercustomer
population
1,000,000
2,000,00050
75
projected water customers
0
1,000,000
1980 1985 1990 1995 2000 2005 2010 2015 2020 20250
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 9
How far can conservation take us?
7,000,000 225
gpcd
5,000,000
6,000,000
150
175
200
actual gpcdgpcd decline to
116 in 2016
3,000,000
4,000,000
100
125
150watercustomer
population
1,000,000
2,000,00050
75
projected water customers
0
1,000,000
1980 1985 1990 1995 2000 2005 2010 2015 2020 20250
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 10
How far can conservation take us?
7,000,000 225
gpcd
5,000,000
6,000,000
150
175
200
actual gpcdgpcd decline to
116 in 2016
3,000,000
4,000,000
100
125
150
116
watercustomer
population
1,000,000
2,000,00050
75
projected water customers
0
1,000,000
1980 1985 1990 1995 2000 2005 2010 2015 2020 20250
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 11
How far can conservation take us?
7,000,000 225
gpcd
5,000,000
6,000,000
150
175
200
actual gpcdgpcd decline to
116 in 2016
3,000,000
4,000,000
100
125
150
110
116
watercustomer
population
1,000,000
2,000,000
25
50
75
projected water customers
01980 1985 1990 1995 2000 2005 2010 2015 2020 2025
0
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 12
How far can conservation take us?
7,000,000 225
gpcd
5,000,000
6,000,000
150
175
200
actual gpcdgpcd decline to
116 in 2016
3,000,000
4,000,000
100
125
150
“no WW growth"
116
92110
watercustomer
population
1,000,000
2,000,000
25
50
75
projected water customers
ggpcd
92
01980 1985 1990 1995 2000 2005 2010 2015 2020 2025
0
25water customers
projected water customers(2.5% growth rate)
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 13
WRC Capacities and Flows (mgd)2007 - 2009
120
140permit limit (125)
100
60
80milliongallonsper day
permit limit (46)
20
403 year
average3 year
average
81.4 81.4 3 yearaverage3 year
average
permit limit (46)
permit limit (16)
0
20
Medio Creek Leon Creek Dos Rios
averageaverage
36.636.6
p ( )
6.46.4
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 14
WRC Capacities and Flows (mgd)2007 - 2009
120
140
permit limit (125)
100 Planning required 93.75
60
80milliongallonsper day
permit limit (46)
20
403 year
average3 year
average
81.4 81.4 3 yearaverage3 year
average
permit limit (46)
permit limit (16)
Planning required
Pl i
34.5
0
20
Medio Creek Leon Creek Dos Rios
averageaverage
36.636.6
p ( )
6.46.4
Planningrequired 12
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 15
WRC Capacities and Flows (mgd)2007 - 2009
120
140permit limit (125)
t ti i d 112.5
100
construction required 112.5
60
80milliongallonsper day
permit limit (46)
20
403 year
average3 year
average
81.4 81.4 3 yearaverage3 year
average
permit limit (46)
permit limit (16)
construction required
t ti
41.4
0
20
Medio Creek Leon Creek Dos Rios
averageaverage
36.636.6
p ( )
6.46.4
constructionrequired 14.4
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 16
WRC Capacities and Flows (mgd)October 2009 thru March 2010
120
140permit limit (125)
construction required 112.5
100
construction required
60
80milliongallonsper day
permit limit (46)
20
40
87.46 87.46
permit limit (46)
permit limit (16)
construction required
t ti
41.4
0
20
Medio Creek Leon Creek Dos Rios
39.3939.39
p ( )
7.67.6
constructionrequired 14.4
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 17
WRC Capacities and Flows2016 - With 20 mgd transferred to Dos Rios
120
140permit limit (125)
g
100 transferred from Leonand MRSO
transferred from Leonand MRSO
60
80
107107
milliongallonsper day
permit limit (46)
flowstransferred to Dos Rios
20
40107 107 permit limit (46)
permit limit (16)
0
20
Medio Creek Leon Creek Dos Rios
3030p ( )
5.65.6
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 18
Why add to Dos Rios service area?
• Provides capacity for future flows from the new Medina River sewershednew Medina River sewershed
• Eliminates current need for expansion at Leon Creek WRCLeon Creek WRC
• Defers need for planned future expansion at Medio Creek WRCat Medio Creek WRC
• Lowest cost option
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 19
Goals for Dos Rios WRC Re-rating
• Maximize use of existing plant capacity• Provide additional capacity when• Provide additional capacity when
needed• Be prepared for peak wet weather• Be prepared for peak wet-weather
events• Minimize rate impacts through• Minimize rate impacts through
sequencing re-rating projects
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 20
Dos Rios WRC Average Flows
Flows
• At 124 gallons per person per day, permit capacity reached in 2023• At 116 gallons per person per day, permit capacity reached in 2028
140
160
Flows(mgd)
124 gpcd
100
120Permit capacity
110 gpcd116 gpcd
gp
60
80Actual
Increase due to Leon and Medio diversions
0
20
40
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
01988 1993 1998 2003 2008 2013 2018 2023 2028
Page 21
Dos Rios WRC Re-rating Timeline• Dos Rios WRC “re-rating" is a series of phased improvements• Will result in 217 mgd capacity at Dos Rios• Will also address some deficiencies in current infrastructureWill also address some deficiencies in current infrastructure• Total cost $163 million: includes design and construction (in 2010 dollars)
design construction
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 22
Comparative Costs for Recent Wastewater Treatment Plant Projects (in 2010 dollars)Treatment Plant Projects (in 2010 dollars)
$16 00
$ / gallonof capacity
$12.00
$14.00
$16.00
$14.29
$6.00
$8.00
$10.00
$6 44
$0 00
$2.00
$4.00 $4.32$3.75
$1.77 $2.39
$4.33
$6.44
$0.00Dos RiosWRC Re-
rating
South AustinRegional Re-
rating
Medio CreekWRC
Expansion
North TexasMunicipal
WaterDistrict
San AntonioRiver
Authority
City ofCorpusChristi
City ofBoerne
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 23
Other Improvements at Dos Rios
design constructionunder construction
• Total cost: $61,034,600 (in 2010 dollars)
PROJECT 2011 20122010 20152013
$6,134,000
$14 12 600
2014
SLUDGE THICKENING AND AERATION SYSTEM IMPROVEMENTS
$10,272,000
$14,125,600
$8,691,000
TERTIARY FILTERS PHASE I
DIGESTER IMPROVEMENTS AND MIXING SYSTEM ENHANCEMENTS - PHASE I
DIGESTER IMPROVEMENTS AND MIXING SYSTEM ENHANCEMENTS - PHASE II
$12,646,000
$1 462 000
$7,704,000
DEWATERING FACILITY IMPROVEMENTS
DIGESTER IMPROVEMENTS AND MIXING SYSTEM ENHANCEMENTS - PHASE III
SYSTEM ENHANCEMENTS PHASE II
$1,462,000SCADA UPGRADE
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 24
Dos Rios WRC Re-rating
separate existingseparate existing
•separate existing Stages 1 and 2 to operate in parallel
separate existing Stages 1 and 2 to operate in parallel
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 25
Treatment in the 1980sThat was thenThat was then.....
Nov 17, 1983
Nov 10, 1983
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling CentersNov 17, 1983
Page 26
Wastewater Treatment TodayThis is nowThis is now....
mexican stoneroller longear perch logperch
SA Express-NewsJune 13 2002
"Best in Texas" "Best in Nation" Permit ComplianceEnvironmentalStewardship
June 13, 2002
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Page 27
Conclusions and Recommendations
• Conservation will not continue to limit wastewater flow growth• Dos Rios WRC is upgradable and has available biological capacity• Proceed with Dos Rios WRC re-rating, headworks improvements
and process enhancements project as planned• Leon Creek capacity achieved by transferring flow to MRSO and
D RiDos Rios• Delay future Medio Creek expansions with flow transfers to Dos
RiosC ti ll l t th i fl i ll th h d d• Continually re-evaluate growth in flows in all three sewersheds and adjust Dos Rios WRC re-rating schedule as needed
June 30, 2010
Updated Master Plan for Water Recycling CentersUpdated Master Plan for Water Recycling Centers
Updated Master Updated Master pPlan for Water Recycling Centers
pPlan for Water Recycling CentersRecycling CentersRecycling Centers
June 30, 2010June 30, 2010June 30, 2010June 30, 2010
Steve ClouseChief Operating Officer