description

UPDATE UTTRAKHAND RELIEF WORK 3 rd July 2013. DRT51 BUSINESS MEET 27 th June 2013 1 ST TEAM FEEDBACK Tr. Pranav Oberai , Tr. Gauravdeep Singh, Tr. Shravan Oberai. Hills are in ruins Hundred of villages are cut off from the main stream Infrastructure severely damaged - PowerPoint PPT Presentation

Transcript of UPDATE UTTRAKHAND RELIEF WORK 3 rd July 2013

Page 1: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

UPDATE UTTRAKHAND RELIEF WORK

3rd July 2013

Page 2: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

DRT51 BUSINESS MEET 27th June 2013

1ST TEAM FEEDBACKTr. Pranav Oberai, Tr. Gauravdeep Singh, Tr. Shravan Oberai

• Hills are in ruins• Hundred of villages are cut off from the main stream• Infrastructure severely damaged• Scarcity of food & other basic amenities in villages and small towns which remain inaccessible. • Most of the houses are destroyed and whatever left are badly damaged. • Focus on evacuation of tourists. • Tons of relief material is pouring from all over India through NGO’s. But due to lack of co-ordination among various government agencies its

getting wasted & not reaching the needy. • DRT51 under the Round Table India Banner had established a base camp in Maletha in association with Geeta Bhavan & IMA. The camp

functioned for 10 days. • Relief material was distributed among villagers near Rudraprayag. Pictures in the next slide.• DRT51 Team had also planned to visit more villages around Srinagar (Garhwal) but couldn’t reach due to road block. • Team was successful in establishing some local contacts in the affected areas in order to reach out to maximum number of people.• After the completion of first phase the focus now should be on rehabilitation on a long term basis• DRT51 to adopt a village in the hills• Rebuild houses & schools• Also look into distribution of a kit as part of rehabilitation. The kit would consist of following items

– Mattress– Quilt– Pillow– Bed Sheets– Utensils – Bucket

• To organize a Blood donation camp on 1st July 2013 in association with Institute of Chatered Accountants of India (ICAI), Dehradun branch & Mahant Indresh Hospital

Page 3: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

DRT51 1ST TEAM REPORT IN PICTURES

Page 4: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

RELIEF MATERIAL BEING DISTRIBUTED BY DRT51 TEAM

Page 5: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

RELIEF MATERIAL BEING DISTRIBUTED BY DRT51 TEAM

Page 6: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

DRT51 1ST TEAM REPORT IN PICTURES

Page 7: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

RELIEF MATERIAL BEING DISTRIBUTED BY DRT51 IN ASSOCIATION WITH SHIVALIK MARKETING

Page 8: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

DRT51 TABLE MEET WITH AREA CHAIRMAN MOHIT ARYA & SQ LG RAVI BAID(Minutes of the meeting to be floated separately by DRT51 new secretary Tr. Guneet Singh Rajan)

Page 9: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

FUNDS COLLECTED UTTRAKHAND FLOOD RELIEFSTATUS UPTO 3rd JULY 2013

Funds received by DRT51 – Rs. 16,08,000/- (excluding Rs 2 Lakhs from RTIT)

Funds received by RTIT – Rs. 15,70,000/-

Total Funds Raised – Rs. 31,78,000/-Funds Utilized by DRT51 – Rs. 4,88,917/-

Details of the funds received & spent has been provided in a separate excel file attached with the presentation. After the first phase of relief material distribution it was decided that the balance funds would be utilized for rehabilitation. As discussed with Area Chairman Tr. Mohit Arya, DRT51 is in the process of identifying & adopting a village. As part of this 2nd Team from DRT51 would be visiting various villages depending on weather conditions & accessibility in the hills. A concrete plan of action for rehabilitation along with the budget will be worked out. Mass appeal would then be sent out to Round Table India & Round Table International in case more funding is required.

DRT51 would like to thank the entire Tabling & Circling fraternity & friends from all over India for their wonderful support for this cause.

Page 10: UPDATE  UTTRAKHAND RELIEF WORK 3 rd  July 2013

LETTER OF APPRECIATION RECEIVED FROM INDIAN MEDICAL ASSOCIATION, DEHRADUN