Interstate 5 Widening Project From State Route 73 to El Toro Road

Mission Viejo Chamber of Commerce

Mission Viejo City Hall – Saddleback Room 2

Fernando Chavarria and Logan Selleck, OCTA

January 9, 2020

Page 2: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Recent OCTA Investment in South County

Freeways

• $ 232 million I-5 Improvement Project completed this year

• $ 81 million State Route 74 Ortega interchange rebuilt

• $580 million Upcoming I-5 Improvement Project between SR-73/El Toro Road

Streets and Roads• $ 75.7 million awarded to 24/38 Regional Capacity Projects

• $ 15.2 million awarded to 30 Signal Synchronization projects

• $ 74.1 million in Local Fair Share funds distributed to South County cities and the County to preserve streets and roads

Transit

• $24.9 million for 16 Community Based Transit/Circulators and planning studies

• $5.5 million in improvements at the Laguna Niguel/Mission Viejo MetrolinkStation.

• $31 million for passing/siding project, $34 million San Juan Creek bridge

Page 3: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Lead Agencies, Background & Funding

• November 2006

• City Adopted Resolutions/Nearly 70% of voters

• OC’s Transportation Plan

• Freeways (43%)

• Streets (43%)

• Transit (25%)

• Environmental

Page 4: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Project Partners

Page 5: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Project Overview

Project Segments

Segment

State Route 73 to Oso Parkway

Segment

Oso Parkway to Alicia Parkway

Segment

Alicia Parkway to El Toro Road

Total length: 6.5 miles

Total Estimated Cost: $580m

Page 6: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Project Improvements

Add one general purpose lane in both directions from

Avery Parkway to Alicia Parkway

Realign and/or improve on- and off-ramps

Reconstruct Avery Parkway and La Paz Road interchanges, and

Los Alisos Boulevard overcrossing

Reconstruct and add auxiliary lanes

Extend second carpool lane in both directions from Alicia Parkway

to El Toro Road

Page 7: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Avery Parkway (Existing)

Page 8: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Avery Parkway (Stage 1)

8

Page 9: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Avery Parkway (Stage 2)

Page 10: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Avery Parkway (Stage 3)

Page 11: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Avery Parkway – Interchange Improvements

• Replace I-5 Bridge

• Ten lanes on Avery Parkway

• Three WB and three EB thru lanes

• Two WB and two EB left-turn lanes

• Eight-foot bike lanes in each direction

• Standard shoulders

• Sidewalks in each direction

Page 12: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

La Paz Road Interchange Reconstruction

Page 13: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

La Paz Road Interchange Reconstruction

Page 14: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

La Paz Road Interchange Reconstruction

Page 15: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

La Paz Road Interchange Reconstruction

1

5

Page 16: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

La Paz Road – Interchange Improvements

• Increase vertical clearance to 15 feet

• Total number of thru lanes

• Three eastbound (EB) thru lanes

• Two westbound (WB) thru lanes

• New five-foot bike lanes and widen

existing sidewalks

Page 17: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Los Alisos Boulevard Widening

Page 18: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Demolition – Safe, Strategic & Swift

55 mph zone

K-rail

CHP Led

Closures

Off-peak

Overnight

2 lanes

Short-term

28 hour

55 hour

Cities

CHP

County

Page 19: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Traffic Management Plan

55 mph zone

K-rail

CHP Led

Closures

Off-peak

Overnight

2 lanes

Short-term

28 hour

55 hour

Cities

CHP

County

Page 20: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Public Outreach

Page 21: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Retaining Wall Aesthetics

Major Retaining WallsPastoral Ranch Theme

Stacked Stone Texture

Slate Stone Texture

Page 22: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

The Road Ahead (Estimated)

Segment Estimated Schedule

Segment 2

Oso Parkway to Alicia ParkwayNow – Late 2023

Segment 1State Route 73 to Oso Parkway

Early 2020 – Early 2025

Segment 3

Alicia Parkway to El Toro RoadLate 2020 – Mid 2024

Page 23: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20  · Interstate 5 Widening Project From State Route 73

Contact Information

Learn more online

octa.net/I5SouthCounty

Contact Team

[email protected]

Fernando Chavarria

(714) 560-5306

[email protected]

Facebook.com/OCI5SouthCounty

@OCI5SouthCounty

Logan Selleck

(714) 560-5573

[email protected]