Interstate 5 Widening Project From State Route 73 to El Toro Road
Mission Viejo Chamber of Commerce
Mission Viejo City Hall – Saddleback Room 2
Fernando Chavarria and Logan Selleck, OCTA
January 9, 2020
![Page 2: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/2.jpg)
Recent OCTA Investment in South County
Freeways
• $ 232 million I-5 Improvement Project completed this year
• $ 81 million State Route 74 Ortega interchange rebuilt
• $580 million Upcoming I-5 Improvement Project between SR-73/El Toro Road
Streets and Roads• $ 75.7 million awarded to 24/38 Regional Capacity Projects
• $ 15.2 million awarded to 30 Signal Synchronization projects
• $ 74.1 million in Local Fair Share funds distributed to South County cities and the County to preserve streets and roads
Transit
• $24.9 million for 16 Community Based Transit/Circulators and planning studies
• $5.5 million in improvements at the Laguna Niguel/Mission Viejo MetrolinkStation.
• $31 million for passing/siding project, $34 million San Juan Creek bridge
![Page 3: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/3.jpg)
Lead Agencies, Background & Funding
• November 2006
• City Adopted Resolutions/Nearly 70% of voters
• OC’s Transportation Plan
• Freeways (43%)
• Streets (43%)
• Transit (25%)
• Environmental
![Page 4: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/4.jpg)
Project Partners
![Page 5: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/5.jpg)
Project Overview
Project Segments
Segment
State Route 73 to Oso Parkway
Segment
Oso Parkway to Alicia Parkway
Segment
Alicia Parkway to El Toro Road
Total length: 6.5 miles
Total Estimated Cost: $580m
![Page 6: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/6.jpg)
Project Improvements
Add one general purpose lane in both directions from
Avery Parkway to Alicia Parkway
Realign and/or improve on- and off-ramps
Reconstruct Avery Parkway and La Paz Road interchanges, and
Los Alisos Boulevard overcrossing
Reconstruct and add auxiliary lanes
Extend second carpool lane in both directions from Alicia Parkway
to El Toro Road
![Page 7: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/7.jpg)
Avery Parkway (Existing)
![Page 8: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/8.jpg)
Avery Parkway (Stage 1)
8
![Page 9: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/9.jpg)
Avery Parkway (Stage 2)
![Page 10: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/10.jpg)
Avery Parkway (Stage 3)
![Page 11: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/11.jpg)
Avery Parkway – Interchange Improvements
• Replace I-5 Bridge
• Ten lanes on Avery Parkway
• Three WB and three EB thru lanes
• Two WB and two EB left-turn lanes
• Eight-foot bike lanes in each direction
• Standard shoulders
• Sidewalks in each direction
![Page 12: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/12.jpg)
La Paz Road Interchange Reconstruction
![Page 13: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/13.jpg)
La Paz Road Interchange Reconstruction
![Page 14: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/14.jpg)
La Paz Road Interchange Reconstruction
![Page 15: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/15.jpg)
La Paz Road Interchange Reconstruction
1
5
![Page 16: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/16.jpg)
La Paz Road – Interchange Improvements
• Increase vertical clearance to 15 feet
• Total number of thru lanes
• Three eastbound (EB) thru lanes
• Two westbound (WB) thru lanes
• New five-foot bike lanes and widen
existing sidewalks
![Page 17: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/17.jpg)
Los Alisos Boulevard Widening
![Page 18: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/18.jpg)
Demolition – Safe, Strategic & Swift
55 mph zone
K-rail
CHP Led
Closures
Off-peak
Overnight
2 lanes
Short-term
28 hour
55 hour
Cities
CHP
County
![Page 19: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/19.jpg)
Traffic Management Plan
55 mph zone
K-rail
CHP Led
Closures
Off-peak
Overnight
2 lanes
Short-term
28 hour
55 hour
Cities
CHP
County
![Page 20: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/20.jpg)
Public Outreach
![Page 21: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/21.jpg)
Retaining Wall Aesthetics
Major Retaining WallsPastoral Ranch Theme
Stacked Stone Texture
Slate Stone Texture
![Page 22: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/22.jpg)
The Road Ahead (Estimated)
Segment Estimated Schedule
Segment 2
Oso Parkway to Alicia ParkwayNow – Late 2023
Segment 1State Route 73 to Oso Parkway
Early 2020 – Early 2025
Segment 3
Alicia Parkway to El Toro RoadLate 2020 – Mid 2024
![Page 23: Update on the Interstate 5 Widening Project From State ...newsbuilder.ocgov.com/previews/D5/vol7issue5/pdf/MVCC...2001/09/20 · Interstate 5 Widening Project From State Route 73](https://reader035.fdocuments.us/reader035/viewer/2022062612/613f4ef6a7a58608c268d725/html5/thumbnails/23.jpg)
Contact Information
Learn more online
octa.net/I5SouthCounty
Contact Team
Fernando Chavarria
(714) 560-5306
Facebook.com/OCI5SouthCounty
@OCI5SouthCounty
Logan Selleck
(714) 560-5573